Spectrum: Concordia University Research Repository
metadata only
A neural network model for resource leveling
A new neural network model aimed at solving the resource leveling (RL) problem in construction is developed. The model is derived by mapping a formulation of the RL problem as a quadratic augmented Lagrangian multiplier (QALM) optimization, onto an artificial neural network (ANN) architecture employ
Conceptio Open Archive
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
This document is indexed with metadata only: full text is not available in the archive for this record. Open the official source ↗
Related documents
- Review of second-order optimization techniques in artificial neural networks backpropagation#437822
- Multi-Material Topology Optimization Using Neural Networks#19738
- Artificial Neural Networks Based Optimization Techniques: A Review#443331
- Artificial Neural Networks Based Optimization Techniques: A Review#19714
- ExaModels.jl: an Algebraic Modeling System for Nonlinear Programming on GPUs#620670
Record · ID 1020332
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Bring this data into your agent: Connect via MCP or API · 20 free credits to start · no card required
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive