Spectrum: Concordia University Research Repository
metadata only
Optimized scheduling for repetitive construction projects
An object-oriented model is presented for optimized scheduling of repetitive construction projects such as: high-rise buildings, housing projects, highways, pipeline networks, bridges and tunnels. The model provides a number of practical features, and incorporates newly developed algorithms for sche
Conceptio Open Archive
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
This document is indexed with metadata only: full text is not available in the archive for this record. Open the official source ↗
Related documents
- AI-Powered Scheduling in High-Mix, Low-Volume (HMLV) Manufacturing: An Appraisal of the Challenges, Approaches, and Future Directions#713905
- Automated Dynamic Scheduling and Factory Layout Optimization for Off-Site Construction#323971
- Artificial Intelligence Based Estimation of Offsite Panel Requirements in Building Construction: Challenges and Opportunities#458213
- Internet of Things (IoT), Building Information Modeling (BIM), and Digital Twin (DT) in Construction Industry: A Review, Bibliometric, and Network Analysis#200878
- A Study on the Issues Of Construction Disputes In Malaysia and Singapore#1025045
Record · ID 1020621
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Bring this data into your agent: Connect via MCP or API · 20 free credits to start · no card required
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive