University of Reading Research Data Archive
metadata only
Model of GB telecommunications electricity load using meteorological re-analysis and temperature delta-shift
GB telecommunications infrastructure electricity load is modelled in simulated climate scenarios (1.5C, 2.0C, etc.) using a 'delta-shift' of re-analysis. MERRA2 re-analysis data (1981-2023, 2m temperature) is used to calculate the daily electricity load of telecommunications infrastructure in GB
Conceptio Open Archive
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
This document is indexed with metadata only: full text is not available in the archive for this record. Open the official source ↗
Related documents
- Model of GB telecommunications electricity load using UKCP18 climate projections#1068376
- The precipitation puzzle: a test of the nasa power model against tunisian ground observational data#14199
- Emergence of new heat stress hotspots over West Africa#971056
- El Sistema Monzónico Sudamericano durante el Holoceno medio y el preindustrial desde modelos climáticos globales#323720
- Electricity load forecasting under extreme heat and cold waves.#1069065
Record · ID 1068375
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Bring this data into your agent: Connect via MCP or API · 20 free credits to start · no card required
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive