arXiv (All)
open access
Sound Constructive Refinement from Production Envelopes to Executable Manufacturing Schedules
Production planning and execution systems can interpret capacity, compatibility, material, and timing commitments differently. We treat this semantic boundary as a constructive refinement problem in which a rolling-horizon planner emits a machine-day production envelope - an explicit contract fixing
Conceptio Open Archive
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
This document is indexed with metadata only: full text is not available in the archive for this record. Open the official source ↗
Related documents
- Verus-SpecGym: An Agentic Environment for Evaluating Specification Autoformalization#229570
- Novel Iterative Construction Methods for the Blocking Job Shop Scheduling Problem#1110405
- Multi-Perspective Agentic Program Repair via Code Property Graphs and Temporal Execution Graphs#366329
- CIT-CAD: Constraint Intent Tree-based CAD Code Generation and Verification#1083215
- Adding Reconfiguration to Zielonka's Asynchronous Automata#1035251
Record · ID 1116176
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Bring this data into your agent: Connect via MCP or API · 20 free credits to start · no card required
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive