eScholarship
metadata only
Test Results of the LQXFAB02 and LQXFAB03 Cryo-Assemblies for the High Luminosity LHC Upgrade
The US High-Luminosity LHC Accelerator Upgrade Project (AUP) is responsible for delivering cryo-assemblies for the Q1Q3 quadrupole optical components of the High Luminosity LHC upgrade at CERN. Total of 10 cryo-assemblies containing two Nb3Sn quadrupole magnets per cold mass will be delivered within
Conceptio Open Archive
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
This document is indexed with metadata only: full text is not available in the archive for this record. Open the official source ↗
Related documents
- Field Quality Measurement of a 4.2-m-Long Prototype Low-$\beta$ Nb$_3$Sn Quadrupole Magnet During the Assembly Stage for the High-Luminosity LHC Accelerator Upgrade Project#1015685
- Assembly and Pre-Loading Specifications for the Series Production of the Nb3Sn MQXFA Quadrupole Magnets for the HL-LHC#683937
- Evidence for BSM spin 0 and spin 2 resonances at LHC Possible Interpretations#158731
- Mechanical Qualification of the Support Structure for MQXF, the Nb3Sn Low- $\beta$ Quadrupole for the High Luminosity LHC#614810
- Performance of the First Short Model 150-mm-Aperture Nb3Sn Quadrupole MQXFS for the High-Luminosity LHC Upgrade#624267
Record · ID 1119998
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Bring this data into your agent: Connect via MCP or API · 20 free credits to start · no card required
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive