arXiv (OAI Expanded)
open access
Explainable Post-Disaster Grid Observability Recovery Using Human-Oversight Agentic LLMs
Post-disaster phasor measurement unit (PMU) outages reduce power-system observability and degrade operator situational awareness, requiring sequential restoration under limited resources. Existing PMU restoration methods based on optimization or heuristics can generate restoration schedules, but the
Conceptio Open Archive
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
This document is indexed with metadata only: full text is not available in the archive for this record. Open the official source ↗
Related documents
- A database management system of DPWH-inspected public school buildings: A tool for seismic vulnerability classification and prioritization for decision makers#298192
- Chaos Testing: A Proactive Framework for System Resilience in Distributed Architectures#722641
- Safe Deep Reinforcement Learning for Robust Frequency and Voltage-Constrained Networked Microgrid Restoration#495440
- 42 U.S.C. § 3233 — Authorization of appropriations for disaster economic recovery activities#592784
- 16 U.S.C. § 6573 — Restoration plans#568176
Record · ID 1122775
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Bring this data into your agent: Connect via MCP or API · 20 free credits to start · no card required
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive