Conceptio › Archive › arXiv (OAI Expanded)
arXiv (OAI Expanded) open access

Implementation of a 300 kA Pulsed Power Supply

Jensen, C. C. et al.
arXiv (OAI Expanded) · Papers
Open Source ↗Direct PDF ↓
accelerator-physics
The Long Baseline Neutrino Facility (LBNF) will produce the world's most intense neutrino beam. While the magnetic horns are expected to be replaced, the LBNF horn power supply is expected to last the lifetime of the project, 30 years. Three series connected magnetic horns will require a 300kA, 800$
Conceptio Open Archive

Analyze & explore related research in Conceptio

Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.

This document is indexed with metadata only: full text is not available in the archive for this record. Open the official source ↗

Related documents

Record · ID 1123516
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Bring this data into your agent: Connect via MCP or API · 20 free credits to start · no card required
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive