Manchester International Airport - OLE Phase 3 Works — Kier Transportation - CP7 NWC
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
Manchester International Airport - OLE Phase 3 Works
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: - OLE Specialist Works for Manchester Airport Station Remodelling
Buyer: Kier Transportation - CP7 NWC | CPV 45234116: Track construction works | Status: active | Published: 2026-09-30
Related documents
- Defra Group Travel and Accommodation — Department for Environment, Food & Rural Affairs — Clarity Travel Limited#1022308
- Materials Experiment and Analysis Database: Material library with Ni,Fe,Co,Ce,Co deposited by INKJET on 2014-01-14 from Plate 00009997 annealed at 350.0C to add O on 2014-01-16#614419
- Workforce Solution - Transformation & Delivery Manager (GRC) — BRITISH BUSINESS BANK PLC — Alexander Mann Solutions Limited#1022161
- Materials Experiment and Analysis Database: Material library with Ni,Fe,Co,Ce,Co deposited by INKJET on 2014-01-14 from Plate 00009931 annealed at 450.0C to add O on 2014-01-17#614417
- Interpretable Feature Learning for RF Fingerprinting via Polar MKANs#471264
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive