arXiv (All)
open access
Virtual Transmission Lines from Data Center Workload Migration: Coordinated Multi-Year Transmission Expansion Planning
The rapid growth of electricity demand from AI data centers is creating a dual mismatch in power systems: a temporal mismatch between fast-rising demand and slow transmission expansion, and a spatial mismatch between concentrated data-center loads and geographically dispersed renewable resources. Th
Conceptio Open Archive
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
This document is indexed with metadata only: full text is not available in the archive for this record. Open the official source ↗
Related documents
- A Critical Review of Grid Integration Challenges and Flexibility Opportunities for Large-Scale Data Centers#1345197
- Capturing Electrical Windows Through Reconfigurable Optical Networks: Transfer-aware Scheduling of Multi-Region AI Data Centers#1297413
- Capturing Electrical Windows Through Reconfigurable Optical Networks: Transfer-aware Scheduling of Multi-Region AI Data Centers#1291777
- Detection of Synchronized AI Data Center Load Episodes Using SCADA Telemetry#1013152
- Spatial LLM Workload Shifting Needs Foresight: Model Commitment for AI Data Center Operation under Power Grid Constraints#996608
Record · ID 1297384
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Bring this data into your agent: Connect via MCP or API · 20 free credits to start · no card required
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive