arXiv (All)
open access
Congestion Price Uncertainty From Interconnection Queue by Monte Carlo Sampling
The generation interconnection queue adds discrete uncertainty to power grid congestion price estimates on the project planning timescale. The conventional approach to this uncertainty is to make an informed guess of the single or few most likely configurations of generators that interconnect. In th
Conceptio Open Archive
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
This document is indexed with metadata only: full text is not available in the archive for this record. Open the official source ↗
Related documents
- Probabilistic electrical power demand forecasting with uncertainty quantification#1119193
- Modeling the Crude Oil Scheduling Problem with Integration with Lower Level Production Optimization and Uncertainty#489403
- Investigating Calibration Challenges in Probabilistic Electricity Price Forecasting#267677
- Optimistic Estimation of Convergence in Markov Chains with the Average-Mixing Time#1014456
- Introspective Uncertainty Estimation for LLM-Based Code Generation#1083462
Record · ID 1356286
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Bring this data into your agent: Connect via MCP or API · 20 free credits to start · no card required
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive