Calhoun
metadata only
An empirical comparison of design/build and design/bid/build project delivery methods
This thesis project compares the performance of a homogeneous sample of United States Navy Bachelor Enlisted Quarters built using the Military Construction process. Projects will be broken into two sub-samples of design/bid/build and design/build projects to see if one project delivery method is sup
Conceptio Open Archive
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
This document is indexed with metadata only: full text is not available in the archive for this record. Open the official source ↗
Related documents
- Changing Paradigms in Construction Competitiveness Research#212611
- 15 U.S.C. § 720g — Study of alternative means of construction#567354
- Design-build vs design-bid-build a procurement method selection framework#628399
- Analysis of construction workload responsibility, U.S. Naval Facilities Engineering Command#1349109
- Codes, Standards and Building Research#1353292
Record · ID 1361680
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Bring this data into your agent: Connect via MCP or API · 20 free credits to start · no card required
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive