715000.00 RES-0001 715000.00 715000.00 selec-w TEN-0001 tenders 1 t-esubm 1 t-oth-eea 1 t-no-eea 0 t-verif-inad 0 t-verif-inad-low 0 CON-0001 false false false LOT-0001 TEN-0001 false 715000.00 no TPA-0001 LOT-0001 1 - 607585 CON-0001 2026-10-20+02:00 STREICHER, spol. s r.o. Plzen, 33209 Stenovice 1 TEN-0001 TPA-0001 ORG-0003 29 http://www.fair-center.de ORG-0001 FAIR - Facility for Antiproton and Ion Research in Europe GmbH Planckstr. 1 Darmstadt 64291 DE711 DEU DE 275 595 927 +49 615971-3534 proekf332@gsi.de https://www.bundeskartellamt.de ORG-0002 Vergabekammer des Bundes Villemomblerstr. 76 Bonn 53123 DEA22 DEU 022894990 Vergabekammer des Bundes +49 22894990 vk@bundeskartellamt.bund.de false UBO-0001 http://streicher-machinery.cz large ORG-0003 STREICHER, spol. s r.o. Plzen Plzenska 565 Stenovice 33209 CZ032 CZE CZ 14706768 +420 377 150 105 +420 377 150 120 tupova@streicher-machinery.cz ORG-0004 Datenservice Öffentlicher Einkauf (in Verantwortung des Beschaffungsamts des BMI) Bonn 53119 DEA22 DEU 0204:994-DOEVD-83 +49228996100 noreply.esender_hub@bescha.bund.de UBO-0001 DEU 00744033-2026 208/2026 2026-10-27+01:00 2.3 eforms-sdk-1.13 eforms-sdk-1.13 11237644-f0e7-4049-b5e4-439395214224 45a49db3-3089-4028-9a24-cbcee628cf72 2026-10-26+01:00 14:56:49+01:00 01 2026-10-26+01:00 32014L0024 can-standard DEU pub-undert-cga education ORG-0001 ted-esen ORG-0004 false false false no-eu-funds vgv The competent investigating authority is as follows
Vergabekammer des Bundes Villemombler Str. 76 D-53123 Bonn, Germany Tel.: 0228 9499-0 Fax: 0228 9499-163 Email: vk@bundeskartellamt.bund.de Web: http://www.bundeskartellamt.de/SharedDocs/Kontaktdaten/DE/Vergabekammern.html
The applicant is requested to clearly identify those parts of the request to participate (and any subsequent bid) containing company/business secrets. If this does not happen, the public procurement tribunal will assume consent to inspect the documents as required in the case of carrying out a review procedure (Section 165 (3) Act against Restraints of Competition (Competition Act - GWB)). As the awarding authority, FAIR is required to provide the public procurement tribunal with immediate access to the files when a review procedure is initiated (Section 163 (2) sentence 3 GWB).
Applicants/bidders have the right to demand that the Contracting authority comply with the provisions on the award procedure protecting bidders (Section 97 (6) GWB). Applicants/bidders with an interest in the public contract who believe their rights have been violated by non-compliance with the provisions governing the awarding of public contracts, must raise an objection about the violation to FAIR within ten calendar days (Section 160 (3) sentence 1 no. 1 GWB).
Violations known from the tender notice or tender documents must be claimed vis-a-vis FAIR before the time limit given for submission of applications (offers) (Section 160 (3) 1 No. 2 - 3 GWB).
If FAIR informs the applicant/bidder that it is unwilling to redress the objection, an application for review may then be filed with the public procurement tribunal above within 15 days of receipt of the notification (Section 160 (3) sentence 1 no. 4 GWB).
Bidders whose bids are not to be considered for the award of the contract will be notified before the awarding of the contract pursuant to Section 134 GWB. A contract may only be concluded 15 calendar days after FAIR has sent out this information. This period is ten calendar days when transmission is by fax or email. The period commences on the day following the dispatch of the information by FAIR. After this time period has expired, an award is possible even if a time limit pursuant to Section 160 (3) GWB has yet to expire. Therefore, in order to prevent an award, a request for review needs to have been served upon FAIR by the public procurement tribunal before the expiry of the time limit under Section 134 GWB.
Pursuant to Section 135 (1) and (2) GWB, the invalidity of an award can only be established if it has been asserted in the review procedure within 30 calendar days from the date on which there was notification on the conclusion of the agreement, though no later than six months after the agreement was concluded. If the Contracting authority published the tender notice in the Official Journal of the European Union, the time limit for claiming ineffectiveness shall expire 30 calendar days after the publication of the tender notice in the Official Journal of the European Union.
Information pursuant to Art. 13 GDPR on the processing of your personal data within the scope of our business relationship is available at: www.gsi.de/data-protection
FAIR Facility for Antiproton and Ion Research in Europe GmbH ORG-0002 open d71afc65-30ee-4b50-bd93-51e03ef392fd-01 false false 332F/2600035069FAIR Switchable Beam Dump Switchable Beam Dump incl. vacuum chamber supplies #Bekanntmachungs-ID: CXS0YYEDYHURSMXD#
Communication with Candidates takes place via the DTVP's tender platform. Questions must be sent to FAIR via DTVP and will are answered via DTVP. Questions posed orally or by telephone regarding the documents or the contractual object will not be answered; answers given orally or by telephone are not binding. The only form of submission of participation applications accepted by Awarding Authority is in writing, electronically
Note: In Writing, Electronically
Participation applications shall be submitted electronically within the deadline via the German awarding platform DTVP. URL: http://www.dtvp.de/Center/ The forms and other documents to be completed, provided by FAIR, may be - either completed on the online tendering tool under the section "Documents to Be Completed" or - created and compiled separately by Candidate together with the other components of the participation application or tender (concepts or explanations etc.), then uploaded under the heading "Own Documents". However, Candidates should not fill in the forms online and upload them again separately, as this can result in transmission errors and increases the workload on both sides. In order to comply with the text form (in writing) according to § 126b BGB [transl.: German Civil Code] when submitting participation applications, Candidates must provide the following information: - In the case of natural persons, the full name (first name and surname) must be given (name of the declaring person in the participation application form). - In the case of legal entities and commercial companies and corporations, the name of the company and its legal form must be stated. In addition, the full name of the employee who is submitting the participation application on behalf of the company (name of the declaring person in the participation application form) must be stated. The insertion of a company logo is not sufficient. - In the case of Bidding Consortia, the declaring person according to § 126b BGB shall be the employee of the leading member who submits the participation application on behalf of the Bidding Consortium; besides, the form "Bidding Consortium Declaration" must be submitted. It should be noted that in the case of electronic submission, the text form according to § 126b BGB is only observed if the participation applications are transmitted in encrypted form via the awarding platform (cf. information on eVergabe). Submitting the participation application via email is not sufficient. In the case of incorrect/ incomplete information that violates the aforementioned formal requirements, participation applications will be excluded unless Candidate cannot be held responsible (§ 57 para. 1 nr. 1, para. 3 VgV). 31643000 Planckstr. 1 Darmstadt 64291 DE711 DEU LOT-0001 false false false no-eu-funds false poi-exa 30.00000000 price Price Consideration of the price through the valuation method "Preis-Quotient-Methode" poi-exa 17.50000000 quality Production - Description of the Manufacturing Design Review (MDR) approach, including verification of manufacturability, assembly feasibility, and identification of risks prior to production. - Detailed production plan including sequence of fabrication, welding, machining, surface treatment, cleaning, and assembly. - Description of available technical equipment and facilities (e.g., machining capacity, welding processes, vacuum preparation infrastructure). - Demonstration of capability to meet required tolerances (ISO 2768-1 mK, EN ISO 13920 BF) and vacuum requirements (? 1×10?7 mbar). poi-exa 14.00000000 quality Quality Assurance - Description of the contractor"s Quality Management System (ISO 9001) and welding quality system (ISO 3834). - Detailed QA plan covering all phases: procurement, manufacturing, assembly, inspection, and testing. - Description of inspection and test procedures, including: o Visual inspection o Dimensional inspection o Non-destructive testing (ISO 9712) o Vacuum testing (leak rate, RGA, pump-down curve) - Approach to Factory Acceptance Test (FAT), including documentation, traceability, and compliance with FAIR technical guidelines. - System for Non-Conformance Reporting (NCR) and corrective actions. - Identification of technical and schedule risks, including mitigation strategies. - Availability of qualified personnel (welding, NDT, QA). poi-exa 14.00000000 quality Personnel Safety Control System o Availability of qualified personnel for programming and commissioning of safety PLC systems. o Ability to provide a documented safety concept, including risk assessment and validation. poi-exa 24.50000000 quality Compliance with Schedule - Binding project schedule including all key milestones: o Manufacturing Design Review (MDR) o Start of production o Intermediate inspections o Factory Acceptance Test (FAT) o Delivery and installation - Demonstration of readiness to start production immediately after contract award, including availability of: o Materials o Manufacturing capacity o Qualified personnel - Identification of critical path activities and potential bottlenecks (e.g., welding, machining, procurement of long-lead items). - Description of supply chain strategy, including secured suppliers and lead times. - Description of internal project management structure and reporting (monthly progress reports as per specification). - Confirmation of ability to meet the required delivery deadline under the given installation constraints. - Contingency planning: o Alternative suppliers o Redundancy in production capacity o Mitigation measures for delays - Description of packaging, transport, and delivery logistics in compliance with FAIR guidelines. ORG-0001 The competent investigating authority is as follows
Vergabekammer des Bundes Villemombler Str. 76 D-53123 Bonn, Germany Tel.: 0228 9499-0 Fax: 0228 9499-163 Email: vk@bundeskartellamt.bund.de Web: http://www.bundeskartellamt.de/SharedDocs/Kontaktdaten/DE/Vergabekammern.html
The applicant is requested to clearly identify those parts of the request to participate (and any subsequent bid) containing company/business secrets. If this does not happen, the public procurement tribunal will assume consent to inspect the documents as required in the case of carrying out a review procedure (Section 165 (3) Act against Restraints of Competition (Competition Act - GWB)). As the awarding authority, FAIR is required to provide the public procurement tribunal with immediate access to the files when a review procedure is initiated (Section 163 (2) sentence 3 GWB).
Applicants/bidders have the right to demand that the Contracting authority comply with the provisions on the award procedure protecting bidders (Section 97 (6) GWB). Applicants/bidders with an interest in the public contract who believe their rights have been violated by non-compliance with the provisions governing the awarding of public contracts, must raise an objection about the violation to FAIR within ten calendar days (Section 160 (3) sentence 1 no. 1 GWB).
Violations known from the tender notice or tender documents must be claimed vis-a-vis FAIR before the time limit given for submission of applications (offers) (Section 160 (3) 1 No. 2 - 3 GWB).
If FAIR informs the applicant/bidder that it is unwilling to redress the objection, an application for review may then be filed with the public procurement tribunal above within 15 days of receipt of the notification (Section 160 (3) sentence 1 no. 4 GWB).
Bidders whose bids are not to be considered for the award of the contract will be notified before the awarding of the contract pursuant to Section 134 GWB. A contract may only be concluded 15 calendar days after FAIR has sent out this information. This period is ten calendar days when transmission is by fax or email. The period commences on the day following the dispatch of the information by FAIR. After this time period has expired, an award is possible even if a time limit pursuant to Section 160 (3) GWB has yet to expire. Therefore, in order to prevent an award, a request for review needs to have been served upon FAIR by the public procurement tribunal before the expiry of the time limit under Section 134 GWB.
Pursuant to Section 135 (1) and (2) GWB, the invalidity of an award can only be established if it has been asserted in the review procedure within 30 calendar days from the date on which there was notification on the conclusion of the agreement, though no later than six months after the agreement was concluded. If the Contracting authority published the tender notice in the Official Journal of the European Union, the time limit for claiming ineffectiveness shall expire 30 calendar days after the publication of the tender notice in the Official Journal of the European Union.
Information pursuant to Art. 13 GDPR on the processing of your personal data within the scope of our business relationship is available at: www.gsi.de/data-protection
FAIR Facility for Antiproton and Ion Research in Europe GmbH ORG-0002 true d71afc65-30ee-4b50-bd93-51e03ef392fd-01 false none none 332F/2600035069FAIR Switchable Beam Dump The procurement covers the manufacturing review, fabrication, assembly, testing and delivery of a switchable beam dump as a build-to-print supply. The beam dump is a component relevant to radiation and personnel protection and is intended to safely absorb the particle beam. The Company will provide the approved manufacturing documentation. The Contractor shall review this documentation during the Manufacturing Design Review (MDR) and may propose justified changes for Company approval. The scope includes the mechanical and vacuum components, drive system, sensors, controls, documentation, Factory Acceptance Test (FAT) and Site Acceptance Test (SAT). An external frame for removing and reinstalling the chamber shall be offered as a separate option. Furthermore, the installation of the chamber using the external frame at the final location on Contractor site shall also be offered as a separate option. supplies none 31643000 Planckstr. 1 Darmstadt 64291 DE711 DEU 9 - Gestell zur Demontage und Wiedermontage der Kammer - Installation auf der FAIR-Baustelle 2000-01-01Z
Related documents
- Germany – Particle accelerators – Switchable Beam Dump — FAIR - Facility for Antiproton and Ion Research in Europe GmbH (DEU)#655975
- ITT For Project 10191590 — Innovate UK — SCIENCE DEVELOPMENTS LTD#1180753
- ITT For Project 10193212 — Innovate UK — SCIENCE DEVELOPMENTS LTD#1180752
- ITT For Project 10203205 — Innovate UK — ALLOTROPE SCIENTIFIC LTD#1099788
- ITT For Project 10203021 — Innovate UK — A2F ASSOCIATES LIMITED#1022571
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive