IMP/TIP memory retrofit schedule (rev 2)
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
Network Working Group Alexander McKenzie RFC # 476 BBN-NET NIC # 14920 March 7, 1973
IMP/TIP Memory Retrofit Schedule (Revision 2)
This revision contains two types of changes to RFC #447. First, the retrofits to Utah, Belvoir, NOAA, USC, Stanford, ISI, Case, and CCA have been completed and are therefore removed from the schedule. Second, the retrofits to UCSB, ETAC, Aberdeen, and Rome have been rescheduled.
The revised text of RFC #447 follows:
During the first several months of 1973 we will be retrofitting each IMP and TIP with additional core memory. At the end of the retrofit program, the memory sizes of the various machines will be as follows:
IMP (516 or 316) - 16K words
TIP - 28K words
TIP with Magnetic Tape Option - 32K words
In addition, the expansion of the TIP core memory will necessitate enlarging the TIP to two cabinets.
Listed below is the schedule for the remaining retrofits. We have arranged this schedule to coincide with the usual monthly Preventive Maintenance at each site so as to minimize user inconvenience, but the work required will frequently require the machines to be down longer than normal. I will issue additional RFC's updating this schedule as necessary.
Any site which anticipates difficulty with the expansion of TIP size, and thus the floor space requirement, should contact Hawley Rising (BBN) at (617)491-1850 ext. 473 All dates given below are below in the form (month/day)
SRI (3/7) ETAC (3/15) FNWC (3/15 Rome (3/16) UCLA (3/19) AMES IMP (3/21) GWC (3/22)
Carnegie (4/4) SDC (4/17) Illinois (4/18) UCSB (5/1) Aberdeen (postponed indefinitely)
[ This RFC was put into machine readable form for entry ] [ into the online RFC archives by Alex McKenzie with ] [ support from GTE, formerly BBN Corp. 9/99 ]
Related documents
- IMP/TIP memory retrofit schedule#193269
- Switch Settings on IMPs and TIPs#134980
- Generative Inversion for Property-Targeted Materials Design: Application to Shape Memory Alloys#183295
- An Overview of Operations, Administration, and Maintenance (OAM) Tools#399132
- Zebrafix: Mitigating Memory-Centric Side-Channel Leakage via Interleaving#155534
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive