ConceptioArchiveCode of Federal Regulations (eCFR)
Code of Federal Regulations (eCFR)public full text

7 CFR Part 1719 — Rural Energy Savings Program

Office of the Federal Register (NARA) · Code of Federal Regulations (eCFR, Office of the Federal Register)
Code of Federal Regulations (eCFR) · Legal · License: Public Domain
Open Source ↗
agriculturedepartmentofagriculture
united states, us regulation, us federal regulation, code of federal regulations, cfr, federal regulation, 7, 1719, part 1719, 7 cfr 1719, 7 cfr part 1719, agriculture, rural utilities service, department of agriculture

PART 1719—RURAL ENERGY SAVINGS PROGRAM Authority: 7 U.S.C. 8107a (Section 6407). Source: 85 FR 18418, Apr. 2, 2020, unless otherwise noted. Subpart A—General Provisions § 1719.1 Purpose. This part establishes policies and procedures for the implementation of the Rural Energy Savings Program (RESP) under Section 6407 of the Farm Security and Rural Investment Act of 2002, as amended, by the Rural Utilities Service (RUS). It is the purpose of this part to help rural families and small businesses achieve cost savings by providing loans through eligible entities to qualified consumers to implement durable cost-effective energy efficiency measures. § 1719.2 Definitions. The following definitions apply to subparts A and B of this part and must have the following meanings for purposes of the Rural Energy Savings Program: Administrator Applicant Commercial technology Completed loan application Conditional commitment letter Conflict of interest Deemed savings Deemed savings calculations Eligible entity Energy audit Energy efficiency measures Energy efficiency program Financial feasibility Government GAAP Implementation Work Plan or EE Program Implementation Work Plan (IWP) Invitation to proceed Key performance indicators Letter of Intent Loan to a Qualified consumer Manufactured home Measurement and Verification (M&V Multi-tier Agreement Qualified consumer RESP applicant means RESP borrower Rural, Small business Special advance Start-up costs (1) Creating or implementing an active EE program; or (2) Investing in the integration of an active EE Program. Start-up costs may include, but are not limited to, amounts paid or incurred in the analysis or survey of potential markets, products such as software and hardware, labor supply, consultants, salaries and other working capital directly related to the creation or enhancement of an EE Program consistent with RESP. Technical Resource Manual (TRM) § 1719.3 Policy and Federal Register Notices. (a) Eligible entities (see § 1719.2 and § 1719.4) are permitted to participate in the Rural Energy Saving Program on the condition that loan funds will be used to make loans to Qualified consumers for the purpose of implementing EE measures. (b) The Agency will issue annual Federal Register (c) In making loans under this Part, the Administrator may consider a proposed EE Program's effect on existing RUS borrowers and the integrity of the RUS portfolio and deny or limit approval of a specific RESP loan application on that basis if it is determined that such requested loan would have a negative effect on existing RUS or RESP borrowers or the RUS loan portfolio. (d) The Administrator may, on a case-by-case basis, grant an exception to any requirement or provision of this subpart provided that such an exception is in the best financial interests of the Federal government. Exercise of this authority cannot be in conflict with applicable law. (e) With regard to the rules of grammatical construction, unless the context otherwise indicates, “includes” and “including” are not limiting, and “or” is not exclusive. Subpart B—Application, Submission and Administration of RESP Loans § 1719.4 Eligibility. Under this subpart, Eligible entities for the RESP include: (a) Any public power district, public utility district, or similar entity, or any electric cooperative described in section 501(c)(12) or 1381(a)(2) of the Internal Revenue Code of 1986, that borrowed and repaid, prepaid, or is paying an electric loan made or guaranteed by the Rural Utilities Service (or any predecessor agency); (b) Any entity primarily owned or controlled by one (1) or more entities described in paragraph (a) of this section; or (c) Any other entity that is an eligible borrower of the Rural Utilities Service, as determined under 7 CFR 1710.101. § 1719.5 Application process and required information. (a) General. (1) The RUS, from time to time and subject to appropriations, will notify the public specifying funding priorities, funding availability, and deadlines. (2) Complete applications for loans to Eligible entities will be processed pursuant to the provisions in this Part and on a first-come-first served basis until the funding appropriated to the program is fully obligated. (3) The submittal of a Letter of Intent is required to participate in the program. The letters of intent will be queued as they are received. If it advances program and policy goals, RUS may consider loan applications from Eligible entities that have submitted Letters of Intent under prior funding announcements but that were not invited to proceed with a loan application. (4) Upon review of the Letter of Intent, RUS may issue an Invitation to proceed with a loan application. RUS reserves the right to notify the Applicant in the queue that the amount of financing RUS will consider for a loan is below the level sought in the Letter of Intent. In making this consideration, RUS will consider overall RUS program objectives or budgetary constraints. An Invitation to proceed with the loan application issued by RUS is not to be deemed as an offer by RUS. (5) A RESP applicant will have up to ninety (90) days to complete the documentation for a complete loan application. The ninety (90) day timeframe will begin on the date the RESP applicant receives RUS' Invitation to proceed. If the deadline to submit the completed loan application falls on Saturday, Sunday, or a Federal holiday, the application is due the next business day. (6) The Administrator may grant an extension of time to complete the documentation required for an application if, in the Administrator's sole judgment, the interest of the program would be advanced by the extension. (7) RUS may limit the number of applications it will consider in the same funding cycle from the same Applicant or combine applications from a single entity. (b) Application process. (1) An Applicant seeking financing must submit a Letter of Intent to be considered under this Part. (2) The Letter of Intent must include the following information: (i) Legal name and status of the entity seeking financing under this Part and its address and principal place of business. (ii) The Applicant's tax identification number, Unique Entity Identifier, and such similar information as it may be subsequently amended or required for Federal funding. (iii) A statement indicating if the Applicant is a current or a former RUS borrower. (iv) A description of the service territory. (v) Value of the net assets, including any information as to whether the Applicant has been placed in receivership, liquidation, or under a workout agreement or whether the Applicant has declared bankruptcy or has had a decree or order issued for relief in any bankruptcy, insolvency or other similar action over the last 10 years. The Applicant must submit a copy of its balance sheet and income statements for the last 3 years. If applicable, the Applicant must provide the balance sheet and income statements for the last 3 years of the entity or entities providing equity or security for the RESP loan together with an explanation of the legal relationship among the entities. (vi) Identification of a point of contact and provide contact information. (vii) Description of the program or projects expected to be financed with the RESP loans funds. This description must not exceed five (5) pages (size 8.5 x 11). RUS reserves the right not to consider Letters of Intent where the project description exceeds five (5) pages. The description should include the following: (A) Description of the service to be provided to Qualified consumers. (B) Identity of the staff or contractors that will be implementing the EE Program and their credentials. (C) A summarized version of the expected IWP addressing the following elements: ( 1 ( 2 ( 3 ( 4 (viii) The Applicant must provide evidence of its key performance indicators for the 5 complete years prior to the submission of the loan application if the total loan amount exceeds $5 million. (3) Instructions on how to submit the loan application package will be included in the RUS Invitation to proceed to the RESP applicant. RUS will timely schedule an initial conference call with the RESP applicant to discuss the elements of the loan application. (i) Content of the application package includes the following: (A) A signed cover letter from the RESP applicant's General Manager or highest-ranking officer requesting RESP loan funds to make loans to Qualified consumers for the purpose of implementing EE measures. (B) A signed copy of the board resolution or applicable authorizing document approving and establishing the EE Program and authorizing the Eligible entity to take a RESP loan. (C) The RESP applicant must provide the Applicant's articles of incorporation or other applicable organizational documents currently in effect, as filed with the appropriate state office, setting forth the RESP applicant's corporate purpose; and the RESP Applicant must also provide the bylaws or other applicable governing documents currently in effect, as adopted by the RESP applicant's applicable governing body. RESP applicants that are active RUS borrowers may comply with this requirement by notifying RUS in writing that there are no material changes to the documents already on file with RUS. (D) A copy of the duly executed Multi-Tier Action Environmental Compliance Agreement (Multi-Tier Agreement) consistent with Rural Development's Environmental Policies and Procedures, 7 CFR part 1970 or its successor regulation. A copy of the Multi-tier Agreement will be provided to the RESP applicant with the Invitation to proceed and the requirements of § 1970.55 will be discussed with the RESP applicant in the initial conference call. Activities and investments listed in the IWP must match the activities and investments identified in the Multi-tier Agreement executed between RUS and the RESP applicant. Additional RUS environmental review will be required if the RESP applicant pursues additional or different activities other than the ones listed in the Multi-tier Agreement. If funded, a RESP borrower would be responsible for performing and documenting environmental reviews consistent with § 1970.55. (E) A financial forecast approved by the applicable governing body of the RESP applicant in support of its loan application. The financial forecast must cover a period of at least 10 years and must demonstrate that the RESP applicant's operation is economically viable and that the proposed loan is financially feasible. RUS may request additional information or projections for a longer period, if RUS deems such supplemental data necessary based on the financial structure of the RESP Applicant or necessary to make a determination regarding loan feasibility. A RESP applicant must, after submitting a loan application, promptly notify RUS of any changes in its circumstances that materially affect the information contained in the loan application. The financial forecast and related projections submitted in support of a loan application must include: ( 1 ( 2 ( 3 ( 4 ( 5 ( 6 ( 7 (F) The RESP applicant must produce, to the satisfaction of the Administrator, an Implementation Work Plan or EE Program Implementation Work Plan (IWP), duly approved by the applicable governing body of the Eligible entity. The IWP will cross reference the Financial Forecast and must address the following core elements: ( 1 ( 2 ( i ( ii ( iii ( iv ( 3 ( 4 (G) The RESP applicant must provide a statement of compliance with the federal statutes as provided in § 1719.11. [85 FR 18418, Apr. 2, 2020, as amended at 89 FR 34957, May 1, 2024; 89 FR 41300, May 13, 2024] § 1719.6 Agency review. (a) General. (b) Eligibility for other loans. et seq. (c) Letter of intent. (1) Applicant eligibility. (2) Project eligibility. (3) Financial status. (d) Loan application. (1) Loan feasibility. (2) RESP applicant's character. (3) RESP applicant's equity. (4) Overall condition of RESP applicant and project. (5) Loan security. (6) EE program implementation and measurement and verification. § 1719.7 Conditional commitment letter and loan closing. (a) Conditional commitment letter. (1) The requirements for coverage ratios will be set forth in the Conditional commitment letter. (2) Receipt of a Conditional commitment letter from the Administrator does not authorize the RESP applicant to commence performance under the approved loan. (b) Intent to meet conditions. (c) Loan closing. (1) Upon receipt of the acceptance of the loan offer from the RESP applicant, RUS, working with its legal counsel, will draft the loan documents which will include the loan conditions and other applicable legal requirements. (2) The loan documents will be forwarded to the RESP applicant by RUS for execution by the RESP applicant's signatories and returned to RUS prior to a mutually acceptable closing date. RUS reserves the right to unilaterally set a closing date to advance program and policy goals. (3) The loan closing date will be used to determine the RESP loan maturity date which under no circumstances will exceed 20 years. (4) An opinion of counsel is required at closing and must be in form and substance acceptable to the Administrator. A form opinion of counsel will be included in the closing instructions. (d) Post-closing activities. § 1719.8 Loan provisions. (a) Financial ratios. (1) Unless otherwise notified, existing RUS borrowers will be subject to their current debt service coverage ratios as provided in their previously executed loan contracts with RUS. (2) The minimum coverage ratio required for RESP borrowers, whether applied on annual or average basis is 1.05 Debt Service Coverage (DSC) unless specifically waived by the Administrator. (3) DSC for RESP borrowers that are not existing RUS borrowers under the Rural Electrification Act will be defined as (Net Income or Total Margins) + (Interest Charges on Long Term Debt) + (Principal payments from RESP relending activities) + (Depreciation and Amortization Expenses)/Total Debt Service Billed. (4) In reviewing and approving a RESP loan, the Administrator may increase the coverage ratio required to be met by an individual RESP borrower if the Administrator determines that higher ratios are required to ensure the repayment of the loan made by RUS, or reduce the coverage ratios if the Administrator determines that the lower ratios are in the best interest of the Government. The coverage ratios will be set forth in the loan documents. (b) Collateral. (1) For existing RUS borrowers, the Administrator may, in his or her sole discretion, rely on existing security arrangements with RUS. (2) When a RESP borrower is unable, by reason of preexisting encumbrances, or otherwise, to furnish a first priority lien on its entire system, the Administrator may accept other forms of security, including but not limited to a parent guarantee, state guarantee, an irrevocable letter of credit, surety bond, pledge of revenues, or other security if the Administrator determines such credit support is reasonably adequate to protect the government's interests and otherwise acceptable in form and substance. (3) RUS may in certain circumstances agree to share its priority lien position with another lender provided the RESP loan is adequately secured and the security arrangements are acceptable to RUS. In such circumstances, RUS will consider entering into joint security arrangements with other lenders on a pari passu (c) Equity contributions. (1) The required equity contribution and related terms will be determined by the Administrator for the individual RESP applicant based upon the its risk profile and available collateral for the RESP loan. (2) RUS reserves the right to require additional equity contributions from existing RUS or RESP borrowers when it is in the best interest of the Government. (3) If the RESP applicant under this section is unable to achieve a minimal acceptable contribution, as set forth in the Conditional commitment letter, the Administrator may consider the following to meet such shortfall to the minimum acceptable equity contribution: (i) The infusion of additional capital into the EE Program by an Investor to meet the shortfall to the minimum acceptable equity contribution. RUS may require that the additional capital be deposited into a RESP applicant's special account subject to a deposit account control agreement with RUS prior to loan closing. (ii) An unconditional, irrevocable letter of credit, in form and substance satisfactory to the Administrator, in the amount necessary to meet the shortfall to the minimum acceptable equity contribution. RUS must be an unconditional payee under the letter of credit and the letter of credit must be in place prior to loan closing and remain in place until the loan is repaid unless specified otherwise in the loan documents. (iii) General obligation bonds or special revenue bonds issued by tribal, state or local governments in the amount necessary to meet the shortfall to the minimum acceptable equity contribution. If the minimum acceptable equity position is satisfied in full or part with general obligation bonds or special revenue bonds, any lien securing the bonds must be subordinate to the lien of the Government securing the RESP loan. (iv) Any other requirements or mechanisms approved by the Administrator to meet the shortfall to the minimum acceptable equity contribution. (d) Loan advances. (1) Excluding the Special Advance, all loan funds will be disbursed either as an advance in anticipation of loans to be made by the RESP borrower to the Qualified consumers; or as a reimbursement for eligible program costs, including loans already made to Qualified consumers. No disbursements will be made until the RESP borrower has complied with the loan conditions set forth in the loan documents. Any disbursement of loan funds to a RESP borrower within a 12-month consecutive period must not exceed 50 percent of the approved loan amount. (i) The RESP borrower must provide to the Qualified consumers all RESP loan funds that the RESP borrower receives within one year of receiving them from RUS. If the RESP borrower does not re-lend the RESP loan funds within one year, the unused RESP loan funds, and any interest earned on those RESP loan funds, must be returned to the Government and will be applied to the RESP borrower's debt. (ii) The RESP borrower will not be eligible to receive additional RESP loan funds from RUS until providing evidence, in form and substance satisfactory to the Administrator, that RESP loan funds from a previous advance have been fully relent to Qualified consumers or returned to the Government. (iii) RUS will disburse the RESP loan funds as an advance in anticipation of loans to be made by the RESP borrower to the Qualified consumers only if the RESP borrower has established written procedures that will minimize the time elapsing between the transfer of RESP loan funds from RUS to the RESP borrower and its corresponding disbursement to the Qualified consumer. (iv) A RESP borrower's request for an advance in anticipation of loans to Qualified consumers should be limited to the minimum amounts needed and timed to be in accordance with the actual immediate cash needs to carry out the EE Program. (2) The RESP borrower may elect to request a Special advance to defray the appropriate start-up costs of establishing a new EE Program or modify an existing EE Program. (i) The Special advance must not exceed 4 percent of the total approved loan amount. (ii) Repayment of the Special advance must be required during the 10-year period beginning on the date on which the Special advance is made. (iii) The RESP borrower may elect to defer the repayment of the Special advance to the end of the 10-year period. (iv) All Special advances must be made during the first 10-years of the term of the loan. (v) All amounts advanced on the loan by RUS to the RESP borrower, including the Special advance, must be paid prior to the final maturity which must not exceed 20 years. (vi) The Special advance maximum amount must be requested by the Borrower and approved by RUS prior to loan closing. (e) Loans to Qualified Consumers. (1) RESP borrower's loans to its Qualified consumers must be for the purpose of implementing EE measures. (2) Loans to Qualified consumers may bear interest not to exceed 5 percent. (3) Each loan made by the RESP borrower to a Qualified consumer may not exceed a term of 10 years. (4) The EE measures financed with a RESP loan proceeds must be for the purpose of decreasing energy (not just electricity) usage or costs of the Qualified consumer by an amount that ensures, to the maximum extent practicable, that a loan term of not more than 10 years will not pose an undue financial burden on the Qualified consumer. (5) RESP loan proceeds must not be used to fund purchases of, or modifications to, personal property unless the personal property is or becomes attached to real property (including a manufactured home) as a fixture. (6) Loans made to Qualified consumers must be repaid through charges added to the recurring service bill for the property for, or, at which the EE measures have been or will be implemented. This requirement does not prohibit the voluntary prepayment of the loan by the owner of the property; or the use of any additional repayment mechanisms that are demonstrated to have appropriate risk mitigation measures, as determined by the RESP borrower, or required if the Qualified consumer is no longer a customer of the RESP Borrower. (7) Loans made by a RESP borrower to a Qualified consumer using RESP loan funds must require an Energy audit by the RESP borrower to determine the impact of the proposed EE measures on the energy costs and consumption of the Qualified consumer. For purposes of this section, an energy audit performed by a contractor or agent of the RESP borrower would be deemed as performed by the RESP borrower. (8) The RESP borrower must comply with all applicable federal, state, and local laws and regulations in making loans to Qualified consumers. Approval by RUS and its employees of a loan under this section does not constitute a Government endorsement. The Government and its employees assume no legal liability for the accuracy, completeness or usefulness of any information, product, service, or process funded directly or indirectly with financial assistance provided under RESP. Nothing in the loan documents between RUS and the RESP borrower will confer upon any other person any right, benefit or remedy of any nature whatsoever. Neither the Government nor its employees make any warranty, express or implied, including the warranties of merchantability and fitness for a particular purpose, with respect to any information, product, service, or process available from a RESP borrower or its agents. (f) Loan term and repayment. RUS loans to an eligible borrow will be subject to the following terms and repayment conditions set forth in this section. (1) The RESP loans under this section will bear no interest (0 percent) and have a maturity not exceeding 20 years. (2) The amortization schedule must be based on a loan term that does not exceed 20 years from the date on which the loan is closed. (3) Except for the Special advance, the repayment of each advance must be amortized for a period not to exceed 10 years. (4) The Administrator may include additional conditions on the repayment schedule if, in his or her sole discretion, it is in the best interest of the Government. (5) The RESP borrower is responsible for fully repaying the RESP loan to RUS according to the loan documents regardless of repayment by its Qualified consumers. (6) The RESP borrower may use the revenues from the interest charged to the Qualified consumer to establish a loan loss reserve, and to offset personnel and EE Program costs. (7) Loans under this Section will not bear interest (0 percent), however, indebtedness not paid when due will be subject to interest, penalties, administrative costs and late fees as provided in the loan documents. § 1719.9 Eligible activities and energy efficiency measures. (a) A RESP Borrower may provide financing to Qualified consumers to implement or invest in one or more set of EE measures such as those listed in this section. (b) A RESP borrower may be able to provide financing to Qualified consumers for EE measures not listed in this section, if it can justify, to the satisfaction of the Administrator, that the proposed EE measure is consistent with the RESP statute, is cost effective, and the technology is commercially available. The Administrator must make the determination prior to the borrower implementing the EE measure. (c) A RESP applicant with an existing EE Program as of April 8, 2014, may submit the list of the EE measures used in its program to RUS for validation and approval. The Administrator will make a finding as to whether such EE measures are consistent with the purpose of RESP. (d) A RESP borrower, subject to the Administrator's written approval, may modify the list of EE measures if those measures are consistent with the statutory purpose of RESP. (e) RESP loan proceeds must finance EE measures for the purpose of decreasing energy usage or costs of the Qualified consumer by an amount that ensures, to the maximum extent practicable, that the loan term will not pose an undue financial burden on the Qualified consumer. (f) Eligible EE measures and investments include, but are not limited, to: (1) Lighting: (i) Lighting fixture upgrades to improve efficiency. (ii) Lighting control technologies. (iii) Daylighting systems. (iv) Energy-efficient lighting technologies. (2) Space conditioning, including Heating, Ventilation, and Air Conditioning (HVAC): (i) Central Air Systems—Energy Star ® qualified equipment. (ii) Room air conditioners. (iii) Boilers. (iv) Heat pumps. (v) Ducts and duct sealing. (vi) Furnaces—Energy Star® qualified equipment. (vii) Thermostats. (viii) Economizers. (ix) Air handlers. (x) Automated controls. (3) Building Envelope Improvements: (i) Improved insulation—adding insulation beyond existing levels, or above existing building codes. (ii) Moisture barrier improvements and air sealing. (iii) Caulking and weather stripping of doors and windows. (iv) Windows upgrades—Energy Star® qualified windows. (v) Door upgrades—including man-doors, overhead doors with integrated insulation and energy efficient windows. (4) Motor Systems: (i) Pumps, coupling and low-friction pipes. (ii) Capacitors. (iii) Variable frequency drives. (iv) Induction motors repairs or replacements for energy efficiency. (v) High efficiency motors—motors with a rated efficiency beyond the Energy Policy Act standards. (vi) Permanent magnet motors. (vii) Reluctance motors. (5) Waste Heat Recovery: (i) Recuperators. (ii) Regenerators. (iii) Waste heat boilers. (iv) Combined heat and power (CHP) and Waste heat to power (WHP). (6) Compressed Air Systems. (7) Water heaters. (8) Fuel switching. (9) Irrigation or water system and waste disposal system efficiency improvements. (10) On or off-grid renewable energy systems if consistent with the statutory purpose of this section. (11) Energy storage devices if permanently installed to reduce energy cost or usage of the Qualified consumer. (12) Energy efficient appliance upgrades if attached to real property as fixtures. (13) Energy audits. (14) Necessary and incidental activities and investments directly related to the implementation of an Energy efficiency measure. § 1719.10 Measurement and verification and quality control. (a) General. (1) RUS acknowledges the broad nature of energy efficiency projects and diverse scope of EE Programs that can be carried out under RESP. A RESP applicant, and its designees, must exercise professional judgment in developing their M&V plans. The nature, scope, and complexity of the EE measures and activities will dictate the level of effort needed for quantifying and verifying the savings. The effort expended should be commensurate with the project capital investment and the risk of miscalculating the savings. (2) A RESP applicant with an existing EE Program as of April 8, 2014, may submit for consideration the M&V plan previously established to fulfill this requirement. (3) RUS may reject a loan application or refuse to disburse loan proceeds to an RESP borrower that fails to demonstrate that the Energy audits or M&V plan have been adequately implemented and performed by qualified individuals. (4) The M&V plan should be based on generally accepted principles and use the best practices of the industry, reliable data, reasonable assumptions and verifiable analytical methodologies. (5) The M&V plan must describe the organized activities that the RESP applicant will implement to facilitate the adoption of the Energy efficiency measures that will result in energy use or cost savings to the Qualified consumer. (6) Energy savings should be determined by comparing measured energy unit values (consumption or demand) before and after the implementation of the EE measures, making appropriate adjustments for changes in conditions. (7) The computation of the savings formula is as follow: Savings = (Baseline Energy—Post-Installation of EE Measures Energy*) ± Adjustments Note: * = performance period (b) M&V Techniques for measuring, calculating and reporting savings. (1) The Retrofit Isolation with Key Parameter Measurement Option (RIKPM) alternative is based on a combination of measured and estimated factors. Measurements will be taken at the component or system level for both the baseline and the retrofit equipment and should include the key performance parameters that define the energy use of the energy conservation measure. Savings will be determined by calculating the baseline and reporting period energy use predicated on the measured and estimated values. Estimated values will have to be supported by historical or manufacturer's data. (2) The Retrofit Isolation with All Parameter Measurement Option (RIAPM) option will be based on short-term, periodic or continuous measurements of baseline and post-retrofit energy use (or proxies of energy use) taken at the component or system level. Savings will be based on the analysis of the baseline and reporting-period energy use or proxies of energy use. (3) The Whole Facility Measurement Option (WFMO) will be based on continuous measurement of the energy use (such as utility billing data) at the whole facility or sub-facility level during the baseline and post-retrofit periods. Savings will be established from the analysis of the baseline and reporting-period energy data. (4) The Calibrated Simulation Option (CSO) is an alternative where computer simulations can be used to model energy performance of a whole facility (or sub-facility). Models must be calibrated with actual hourly or monthly billing data from the facility. In this option, savings will be determined by comparing a simulation of the baseline (after having calibrated the model) with either a simulation of the performance period or actual utility data. (c) Use of deemed savings. (1) Describe the process to stipulate with the Qualified consumer the values and assumptions for determining the energy savings. (2) Identify the TRMs upon which the deemed savings values and assumptions are based. In the alternative, identify such other technical M&V studies reasonably applicable to the conditions of the RESP applicant's service area or such other detailed M&V studies performed by similar entities to determine deemed savings for identical or similar energy programs or energy efficiency measures. (3) Describe the mechanism to ensure that deemed savings values and related calculations will be maintained and kept up to date. (4) The approval by RUS of a M&V plan under this section is solely for the benefit of RUS. Approval of a plan pursuant to this section does not constitute an RUS endorsement of the M&V plan or an EE Program. RUS and its employees assume no legal liability for the accuracy, completeness or usefulness of any information, product, service, or process funded directly or indirectly with financial assistance provided under RESP. (d) Quality control. (1) The RESP borrower and the Qualified consumer must agree on the EE measures to be implemented based on a quantifiable and verifiable assessment of the impacts that such measures will have in reducing the Qualified consumer's energy cost or consumption. (2) A RESP borrower may elect to engage a third-party contractor to carry out the assessments required in this Section and install the EE measures as long as there is no Conflict of interest. (3) RESP borrower employees and third-party contractors engaged to carry out activities in the EE Program must be qualified and have adequate expertise to perform energy audits, retrofit installations, and do the quality control assessments according to the applicable industry best-practices. Individual's credentials and expertise should be accredited through one of the following options: (i) Possessing a current Home Energy Professional Certification or a similar certification from a nationally, industry-recognized organization that is consistent with the Job Task Analyses Guidelines issued by the US Department of Energy's National Renewable Energy Laboratory or its successor. (ii) Possessing a current certification issued by an organization recognized by the U.S. Department of Energy in accordance with the Better Buildings Workforce Guidelines or its successor. (iii) Producing evidence, in form and substance satisfactory to the Administrator, that the individual possesses proficiency in the knowledge, skills and abilities needed to perform the tasks and critical work functions relevant to the duties assigned in the EE Program. (4) A RESP borrower that elects to carry out the EE Program with a contractor, must validate and document the following: (i) The contractor has adequate capacity and resources to engage with customers, conduct whole-property assessments, performance testing, diagnostic reasoning, and fulfill all data collection and reporting requirements. This includes, but is not limited to, having access to satisfactory diagnostic equipment, tools, qualified staff, data systems and software, and administrative support. (ii) The contractor is current and in good standing with all applicable registration and licensing requirements for their specific jurisdiction and trade. (iii) The contractor employs individuals (either its own employees or subcontractors) that are qualified to install or physically oversee the installation of home improvements in compliance with local building codes and industry-accepted protocols. (5) A RESP borrower is responsible for actions or omissions departing from the required standards under this Section by third party partners or contractors employed in connection with an EE Program funded under this Section. (6) The RESP loan documents are solely for the benefit of RUS and the RESP Borrower and nothing in the loan documents between RUS and the RESP borrower will confer upon any third party any right, benefit or remedy of any nature whatsoever. Neither RUS nor its employees makes any warranty, express or implied, including the warranties of merchantability and fitness for a particular purpose, with respect to any information, product, service, or process available from a RESP borrower or its agents. § 1719.11 Compliance with USDA departmental regulations, policies and other federal laws. (a) Equal opportunity and nondiscrimination. (b) Civil rights compliance. (c) Discrimination complaints. (d) Appeal Rights. (1) Programmatic decisions based on clear and objective statutory or regulatory requirements are not appealable; however, such decisions are reviewable for appealability by the National Appeals Division (NAD). (2) An Applicant and a RESP applicant can appeal any RUS decision that directly and adversely impacts it. Appeals will be conducted by USDA NAD and will be handled in accordance with 7 CFR part 11. (e) Federal Debt and Settlement of Debt. § 1719.12 Reporting. (a) General. (b) Frequency of reporting. (c) Reporting elements. (1) Number and amount of loans to qualified consumers. (2) Types of investments in EE measures and eligible activities. (3) EE Program portfolio performance. (4) Evidence of compliance with Multi-Tier Action Environmental Compliance Agreement. (5) Status and amount of Loan Loss Reserve (when applicable). § 1719.13 Auditing and accounting requirements. (a) Accounting requirements. (1) Existing RUS borrowers must continue recording and reporting transactions pursuant to the RUS Uniform Systems of Accounts—Electric, 7 CFR part 1767. Such borrowers will continue to follow the accounting and reporting requirements set forth in the previously executed loan documents for RUS outstanding loans. (2) New and RESP only borrowers must adopt and follow a GAAP based system of accounts acceptable to RUS, as well as compliance with the requirements of 2 CFR part 200 (for RESP Awardees, the term “grant recipient” in 2 CFR part 200 will also mean “loan recipient.”) (3) All RESP borrowers must promptly notify RUS should a state regulatory authority with jurisdiction over it require it to apply accounting methods or principles different from the ones specified in the loan documents. (4) RUS will consider borrowers' reasonable proposals to streamline reporting and accounting requirements only when such proposals afford RUS adequate mechanisms to ensure the full and timely repayment of the loan, as determined by RUS. (5) The Administrator may modify the accounting requirements for RESP borrowers if, in his or her judgement, it is necessary to satisfy the statutory purpose of the program, streamline procedures, or advance policy goals. (6) Nothing in this policy shall be construed as a limitation or waiver of any other federal statute or requirement or the Administrator's authority and discretion to implement the RESP in such a way that the Government's interest is adequately preserved. (b) Auditing requirements. (1) If the borrower is a for-profit entity, an electric or telecommunications cooperative, or any other entity not covered by the definition of “non-Federal entity” in 2 CFR 200.1, the borrower shall provide an independent audit report in accordance with 7 CFR part 1773 and the award agreement. The certified public accountant (CPA) is selected by the awardee and must be approved by RUS as set forth in 7 CFR 1773.5. (2) If the borrower is a non-Federal entity, as defined in 2 CFR 200.1, the borrower shall provide an audit in accordance with subpart F of 2 CFR part 200. (3) RESP borrowers must comply with all reasonable RUS requests to support ongoing monitoring efforts. The RESP borrowers must afford RUS, through their representatives, a reasonable opportunity, at all times during business hours and upon prior notice, to have access to and the right to inspect any or all books, records, accounts, invoices, contracts, leases, payrolls, timesheets, cancelled checks, statements, and other documents, electronic or paper of every kind belonging to or in possession of the RESP borrowers or in any way pertaining to its property or business, including its parents, affiliates, and subsidiaries, if any, and to make copies or extracts therefrom. (4) The Administrator may modify the audit requirements for RESP borrowers if, in his or her judgement, it is necessary to satisfy the statutory purpose of the program or advance policy goals. (5) Nothing in this policy shall be construed as a limitation or waiver of any other federal statute or requirement or the Administrator's authority and discretion to implement the RESP in such a way that the Government's interest is adequately preserved. [85 FR 18418, Apr. 2, 2020, as amended at 88 FR 7561, Feb. 6, 2023]

Related documents

Record · ID 504619 · SHA-256 fe0dd7b455a2166f
Retrieved via Conceptio — every document is proof-bundled with source, license, and retrieval metadata.