ConceptioArchiveCode of Federal Regulations (eCFR)
Code of Federal Regulations (eCFR)public full text

18 CFR Part 250 — Forms

Office of the Federal Register (NARA) · Code of Federal Regulations (eCFR, Office of the Federal Register)
Code of Federal Regulations (eCFR) · Legal · License: Public Domain
Open Source ↗
conservationdepartmentofenergyfederalenergyregulatorycommissionpowerresourceswater
united states, us regulation, us federal regulation, code of federal regulations, cfr, federal regulation, 18, 250, part 250, 18 cfr 250, 18 cfr part 250, conservation, of, power, and, water, resources, federal energy regulatory commission, department of energy, approved forms, natural gas act

PART 250—FORMS Authority: 15 U.S.C. 717-717w, 3301-3432; 42 U.S.C. 7101-7352; 28 U.S.C. 2461 note. §§ 250.1-250.5 [Reserved] § 250.6 Form of application to be filed by distributor under section 7(a), seeking gas service of not more than 2,000 Mcf per day (3d year of operation) for a single community (see § 156.3(d) of this chapter). 1. Name of applicant (indicate whether individual, corporation or municipality). 2. Address. 3. Name, title, mailing address, and telephone number of person to be contacted concerning the application. 4. Name of natural gas company from whom service is desired. 5. Are you now rendering gas service? If so, briefly describe operations. 6. Nature of service sought, giving a brief description of proposal, including location of community, population, number of residences and kind of service sought and to be rendered, showing: (a) Is this an initial connection with the pipe line, or is it an extension or improvement of existing facilities? (b) Estimate of maximum day requirements for residential, commercial and industrial customers for each of the first three years of proposed operations (Mcf at 14.73 psia), and how the estimates were derived; (c) Estimate of annual requirements for residential, commercial and industrial customers for each of the first three years of proposed operations (Mcf at 14.73 psia), and how the estimates were derived. 7. Do you have or do you need a franchise to render the proposed service? If you have filed an application for such a franchise, with whom was it filed and what action has been taken on it? 8. Do you have or do you need a state certificate approving the proposed distribution system project? If you have filed an application for such a certificate, with whom was it filed and what action has been taken on it? 9. When do you propose to start construction and when do you estimate it will be completed? When do you propose to start selling gas? 10. How much are the facilities expected to cost? Show separately the estimated cost of the distribution system, the connecting supply lines, legal fees, financing fees and engineering fees, and briefly state how the estimates were derived. 11. Have you used the services of an engineering consultant? If so, the consultant should state his experience in the design of distribution systems, cost data of systems now in service compared with his initial estimates, and the actual rate at which new customers were attached in the new distribution systems. 12. How do you propose to finance the proposed facilities? Submit evidence that the money will be available. (This evidence need not be submitted if you have a state certificate for your project.) 13. For each of the first three years of operation of the proposed facilities, show (a) the estimated gross annual revenues for the natural gas estimated to be sold to residential, commercial and industrial customers as shown in item 6(c) and the rates you propose to charge, and (b) the cost of gas purchased by you (state the rate to be paid to the pipeline supplier and the pipeline's rate schedule under which you will purchase said gas), other operating and maintenance expenses and operating revenue deductions, and (c) the net operating revenues. If you have received a certificate of public convenience and necessity issued by a local regulatory commission, it may be submitted in lieu of this requirement. 14. Municipalities should submit a bond amortization and interest schedule for the life of the bond issue related to the project and computation of the average debt service coverage ratio over the life of the issue. State briefly how all estimates were derived. Exhibits to be furnished: Exhibit A. (a) Location, length and size of your transmission lines; (b) Location and size (related horsepower) of your transmission compressor stations (if any); (c) Location and designation of each point of connection of your proposed transmission facilities with proposed pipeline supplier; (d) And if known, location, length and size of facilities to be installed by the proposed supplier. Exhibit B. [Order 280, 29 FR 4879, Apr. 7, 1964] §§ 250.7-250.15 [Reserved] § 250.16 Format of compliance plan for transportation services and affiliate transactions. (a) Who must comply. (b) Tariff requirements. (1) The procedures used to address and resolve complaints by shippers and potential shippers including a provision that the pipeline will respond within 48 hours and in writing within 30 days to such complaints. (2) [Reserved] (c) Log of data used to allocate capacity. (2) The current log of allocation data for marketing affiliates must be posted on the pipeline's Internet Web site, operated pursuant to § 284.12 of this chapter. The posting must conform with the requirements of § 284.12 of this chapter and the pipeline's tariff requirements relating to Internet Web sites. Access to the information must be provided using the same protocols and procedures used for the pipeline's Internet Web site. (3) The log of affiliate and non-affiliate information must be provided to the Commission upon request and must be made available to the public under 18 CFR part 385, subpart D. When requested by the Commission, the information must be provided, within a reasonable time, according to the specifications and format contained in Form No. 592, which can be obtained on the Commission's website, https://www.ferc.gov. (d) Transportation Discount Information. (2) The discount information must be made available to the Commission upon request and to the public under 18 CFR part 385, subpart D. When requested by the Commission, the information must be provided, within a reasonable time, according to the specifications and format contained in Form No. 592, which can be obtained on the Commission's website, https://www.ferc.gov. (e) Penalty for failure to comply. (2) For purposes of this paragraph, in the case of a continuing violation, each day of the violation will constitute a separate violation. [Order 566, 59 FR 32898, June 27, 1994] Editorial Note: For Federal Register www.govinfo.gov.

Related documents

Record · ID 506399 · SHA-256 2f1192e03b0f6613
Retrieved via Conceptio — every document is proof-bundled with source, license, and retrieval metadata.