ConceptioArchiveCode of Federal Regulations (eCFR)
Code of Federal Regulations (eCFR)public full text

30 CFR Part 740 — General Requirements for Surface Coal Mining and Reclamation Operations on Federal Lands

Office of the Federal Register (NARA) · Code of Federal Regulations (eCFR, Office of the Federal Register)
Code of Federal Regulations (eCFR) · Legal · License: Public Domain
Open Source ↗
departmentoftheinteriorresources
united states, us regulation, us federal regulation, code of federal regulations, cfr, federal regulation, 30, 740, part 740, 30 cfr 740, 30 cfr part 740, mineral, resources, office of surface mining reclamation and enforcement, department of the interior, federal lands program

PART 740—GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS Authority: 30 U.S.C. 1201 et seq. et seq. Source: 48 FR 6935, Feb. 16, 1983, unless otherwise noted. § 740.1 Scope and purpose. This part provides for the regulation of surface coal mining and reclamation operations on Federal lands. § 740.4 Responsibilities. (a) The Secretary is responsible for: (1) Approval, disapproval or conditional approval of mining plans with respect to lands containing leased Federal coal and of modifications thereto, in accordance with the Mineral Leasing Act of 1920, as amended, 30 U.S.C. 181 et seq.; (2) Execution, modification or termination of State-Federal cooperative agreements in accordance with part 745 of this chapter; (3) Designation of areas of Federal lands as unsuitable for all or certain types of surface coal mining and reclamation operations, or termination of such designations, in accordance with part 769 of this chapter; (4) Decisions on requests to determine whether a person possesses valid existing rights to conduct surface coal mining operations on Federal lands within the areas specified in § 761.11(a) and (b) of this chapter; and (5) Issuance of findings concerning whether there are significant recreational, timber, economic, or other values that may be incompatible with surface coal mining operations on Federal lands within a national forest, as specified in § 761.11(b) of this chapter. (b) OSM is responsible for: (1) Providing a decision document recommending to the Secretary approval, disapproval or conditional approval of mining plans and of modifications thereto; (2) Approval of experimental practices on Federal lands; (3) Inspection, enforcement and civil penalties with respect to surface coal mining and reclamation operations on Federal lands except as provided in paragraph (c)(5) of this section; (4) Processing citizen requests for Federal inspections on Federal lands in accordance with parts 842, 843 and 845 of this chapter; and (5) Overseeing the State regulatory authority's administration and enforcement of the State program on Federal lands pursuant to the terms of any cooperative agreement. (c) The following responsibilities of OSM may be delegated to a State regulatory authority under a cooperative agreement: (1) Review and approval, conditional approval of disapproval or permit applications for surface coal mining and reclamation operations on Federal lands, revisions or renewals thereof, and applications for the transfer, sale or assignment of such permits; (2) Consultation with and obtaining the consent, as necessary, of the Federal land management agency with respect to post-mining land use and to any special requirements necessary to protect non-coal resources of the areas affected by surface coal mining and reclamation operations; (3) Consultation with and obtaining the consent, as necessary, of the Bureau of Land Management with respect to requirements relating to the development, production and recovery of mineral resources on lands affected by surface coal mining and reclamation operations involving leased Federal coal pursuant to 43 CFR Group 3400; (4) Approval and release of performance bonds, liability insurance and, as applicable, Federal lessee protection bonds required for surface coal mining and reclamation operations on Federal lands. Approval and release of Federal lessee protection bonds requires the concurrence of the Federal land management agency; (5) Responsibilities of the regulatory authority with respect to inspection, enforcement and civil penalty activities for (i) exploration operations not subject to 43 CFR Group 3400, and (ii) surface coal mining and reclamation operations on Federal lands; (6) Review and approval of exploration operations not subject to the requirements of 43 CFR Group 3400; and (7) Preparation of documentation to comply with the requirements of the National Environmental Policy Act (42 U.S.C. 4321 et seq. (i) Determining the scope, content and format and ensuring the objectivity of NEPA compliance documents; (ii) Making the determination of whether or not the preparation of an environmental impact statement is required. (iii) Notifying and soliciting views of other State and Federal agencies, as appropriate, on the environmental effects of the proposed action; (iv) Publishing and distributing draft and final NEPA compliance documents; (v) Making policy responses to comments on draft NEPA compliance documents; (vi) Independently evaluating NEPA compliance documents; and (vii) Adopting NEPA compliance documents and determining Federal actions to be taken on alternatives presented in such documents. (d) The Bureau of Land Management is responsible for: (1) Receiving and approving exploration plans pursuant to 43 CFR Group 3400; (2) Inspection, enforcement and civil penalties with respect to the terms and conditions of coal exploration licenses issued pursuant to 43 CFR Group 3400; (3) Inspection, enforcement and civil penalties with respect to the terms and conditions of exploration operations subject to 43 CFR Group 3400; (4) Reviewing the resource recovery and protection plan and modifications thereto, as required by 43 CFR Group 3400 and recommending to the Secretary approval, disapproval or conditional approval of the resource recovery and protection plan; (5) Inspection, enforcement and civil penalties with respect to the recovery and protection of the coal resource as required by 43 CFR Group 3400; (6) Protecting mineral resources not included in the coal lease; (7) Issuance of exploration licenses for Federal coal subject to the requirements of 43 CFR Group 3400; (8) Issuance of leases and licenses to mine Federal coal subject to the requirements of 43 CFR Group 3400; and (9) Issuance, readjustment, modification, termination, cancellation, and approval of transfers of Federal coal leases pursuant to the Mineral Leasing Act and the Mineral Leasing Act for Acquired Lands of 1947, as amended, 30 U.S.C. 351 et seq. (e) The Federal land management agency is responsible for: (1) Determining post-mining land uses; (2) Protection of non-mineral resources; (3) Requiring such conditions as may be appropriate to regulate surface coal mining and reclamation operations under other provisions of law applicable to such lands under its jurisdiction; and (4) Where land containing leased Federal coal is under the surface jurisdiction of a Federal agency other than the Department, concur in the terms of the mining plan approval. [48 FR 6935, Feb. 16, 1983, as amended at 48 FR 44779, Sept. 30, 1983; 55 FR 9401, Mar. 13, 1990; 64 FR 70830, Dec. 17, 1999] § 740.5 Definitions. (a) As used in this subchapter, the term: Authorized officer Coal lease et seq. Cooperative agreement Federal land management agency Federal lease bond Federal lessee protection bond Lease terms, conditions and stipulations Leased Federal coal Mineral Leasing Act MLA et seq. Mining plan Permit application package Regulatory authority TVA-owned lands (b) The following terms shall have meanings as set forth in 43 CFR parts 3400: Exploration; exploration plan; maximum economic recovery; method of operation; mine; and resource recovery and protection plan. [48 FR 6935, Feb. 16, 1983, as amended at 48 FR 44779, Sept. 30, 1983] § 740.10 Information collection. (a) In accordance with 44 U.S.C. 3501 et seq., (b) OSM estimates that the public reporting burden for this part will average 26 hours per respondent, including time spent reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collection requirements, including suggestions for reducing the burden, to the Office of Surface Mining Reclamation and Enforcement, Information Collection Clearance Officer, 1951 Constitution Avenue, NW, Washington, DC 20240; and the Office of Management and Budget, Office of Information and Regulatory Affairs, Attention: Interior Desk Officer, 725 17th Street, N.W, Washington, DC 20503. Please refer to OMB Control Number 1029-0027 in any correspondence. [64 FR 70831, Dec. 17, 1999] § 740.11 Applicability. (a) Except as provided in paragraph (g) of this section, both this subchapter and the pertinent State or Federal regulatory program in subchapter T of this chapter apply to: (1) Coal exploration operations on Federal lands not subject to 43 CFR part 3400, and (2) Surface coal mining and reclamation operations taking place on any Federal lands as defined in § 700.5 of this chapter, and lands (except Indian lands) over leased or unleased Federal minerals. (b) Where OSM is the regulatory authority, references in the State program to the State or an agency or official of the State (with respect to functions of the State acting as regulatory authority) shall be construed as referring to OSM. (c) Where the Secretary and a State have entered into a cooperative agreement, the cooperative agreement shall delineate the responsibilities of the Secretary and the State with respect to the administration of the regulatory program and this subchapter. (d) Nothing in this subchapter shall affect in any way the authority of the Secretary or any Federal land management agency to include in any lease, license, permit, contract, or other instrument such conditions as may be appropriate to regulate surface coal mining and reclamation operations under provisions of law other than the Act on land under their jurisdiction. (e) This subchapter shall not apply to surface coal mining and reclamation operations within a State prior to approval or promulgation of a regulatory program for the State. (f) Where coal exploration or surface coal mining and reclamation operations within a State are on Federal lands and where no State or Federal program has been approved for the State, this subchapter shall apply in that State upon the effective date of these regulations. (g) The definition of valid existing rights in § 761.5 of this chapter applies to any decision on a request for a determination of valid existing rights to conduct surface coal mining operations on the lands specified in § 761.11(a) and (b) of this chapter. [48 FR 6935, Feb. 16, 1983; 48 FR 13985, Apr. 1, 1983, as amended at 48 FR 44779, Sept. 30, 1983; 55 FR 9402, Mar. 13, 1990; 64 FR 70831, Dec. 17, 1999; 75 FR 60275, Sept. 29, 2010] § 740.13 Permits. (a) General requirements. (2) Every person conducting surface coal mining and reclamation operations on lands subject to this part shall comply with the terms and conditions of the permit and the lease or license, the Act, this subchapter, the regulatory program and all other applicable State and Federal laws and regulations. (3) Surface coal mining operations authorized under the initial regulatory program or 43 CFR parts 3400, as applicable, may be conducted beyond the eight-month period prescribed in the applicable regulatory program if all of the following conditions are present: (i) A timely and administratively complete application for a permit to conduct those operations under this part has been made to the regulatory authority in accordance with the provisions of this part and the applicable regulatory program; (ii) The regulatory authority has not yet rendered a final decision with respect to the permit application; and (iii) Those operations are conducted in compliance with all terms and conditions of the initial regulatory program approval or permit, the requirements of the Act. 30 CFR chapter VII, subchapter B or 43 CFR parts 3400, as applicable, applicable State laws and regulations, and the requirements of the applicable lease or license. (b) Permit application package. (2) Unless specified otherwise by the regulatory authority, seven copies of the complete permit application package shall be filed with the regulatory authority. (3) Each permit application package shall include: (i) The information required for a permit application or for an application for revision or renewal of a permit under the applicable regulatory program; (ii) The resource recovery and protection plan required by 43 CFR parts 3400 for operations on lands containing leased Federal coal; and (iii) Where OSM is the regulatory authority or where the proposed operations are on lands containing leased Federal coal, the following supplemental information to ensure compliance with Federal laws and regulations other than the Act: (A) A description of the affected area of the proposed surface coal mining and reclamation operation with respect to: ( 1 2 (B) An evaluation of impacts to the scenic and aesthetic resources, including noise on the surrounding area, due to the proposed surface coal mining and reclamation operation. (C) A statement, including maps and ownership data as appropriate, of any cultural or historical sits listed on the National Register of Historic Places within the affected area of the proposed surface coal mining and reclamation operation. (D) A statement of the classes of properties of potential significance within the disturbed area, and a plan for the identification and treatment, in accordance with 36 CFR part 800, of properties significant and listed or eligible for listing on the National Register of Historic Places within the disturbed area of the proposed surface coal mining and reclamation operation. (E) A description of the probable changes in air quality resulting from the mining operation and any necessary measures to comply with prevention of significant deterioration limitations, State Implementation Plans, or other Federal or State laws for air quality protection. (F) A description of the location, acreage and condition of important habitats of selected indicator species located within the affected area of the proposed surface coal mining and reclamation operation. (G) A description of active and inactive nests and prey areas of any Bald or Golden eagles located within the affected area of the proposed surface coal mining and reclamation operations. (H) A description of all threatened and endangered species and their critical habitats located within the affected area of the proposed surface coal mining and reclamation operations. (4) Where the surface of the Federal lands is subject to a lease or permit issued by the Federal government to a person other than the applicant, the permit application package shall contain information sufficient to demonstrate compliance with the requirements of § 740.15(c)(1). This requirement shall not apply to TVA-owned lands. (c) Permit review and processing. (1) Permit terms and conditions. (2) Criteria for permit approval or denial. (3) Public participation in permit review process. (4) Permit review processing for operations on lands administered by a Federal land management agency. (5) Consultation with other Federal agencies. (6) Permit processing schedule. (7) Determination of operator compliance with the Act. (8) Administrative review of decisions on permit applications. (9) Bonds and insurance required for issuance of permits. (d) Review of permit revisions. (2) OSM shall review each permit revision in consultation with the Bureau of Land Management and the appropriate Federal land management agency to determine whether the permit revision constitutes a mining plan modification requiring the Secretary's approval under § 746.18 of this chapter. (3) The regulatory authority shall consult with the Federal land management agency to determine whether any permit revision will adversely affect Federal resources other than coal and whether the revision is consistent with that agency's land use plans for other Federal laws, regulations and executive orders for which it is responsible. (e) Transfer, assignment or sale of rights. (2) Approval of a transfer, assignment or sale of rights granted under a permit issued pursuant to this subchapter shall not be construed to constitute a transfer or assignment of leasehold interests. Leasehold interests may be transferred or assigned only in accordance with 43 CFR part 3453. (f) Suspension or revocation of permits. (2) If a permit to conduct surface coal mining and reclamation operations on lands containing leased Federal coal is suspended or revoked, the regulatory authority shall notify the Bureau of Land Management so that the Bureau of Land Management can determine whether action should be taken to cancel the Federal lease. This section does not release the Federal lessee from the diligent development or continued operation requirements of 43 CFR parts 3400. [48 FR 6935, Feb. 16, 1983, as amended at 48 FR 44779, Sept. 30, 1983; 54 FR 13822, Apr. 5, 1989] § 740.15 Bonds on Federal lands. (a) Federal lease bonds. (2) The authorized officer may release the liability for that portion of the Federal lease bond that covers reclamation requirements if: (i) The lessee has secured a suitable performance bond covering the permit area under this part; (ii) There are no pending actions or unresolved claims against existing bonds; and (iii) The authorized officer has received concurrence from OSM and the Bureau of Land Management. (b) Performance bonds. (c) Federal lessee protection bonds. (2) The bond shall be payable to the United States and, as applicable, the State for the use and benefit of the permittee or lessee of the surface lands involved. (3) The bond shall secure payment to the surface estate for any damage which the surface coal mining and reclamation operation causes to the crops or tangible improvements of the permittee or lessee of the surface lands. (4) The amount of the bond shall be determined either by the applicant and the Federal lessee or permittee or as determined in an action brought against the person conducting surface coal mining and reclamation operations or upon the bond in a court of competent jurisdiction. (d) Release of bonds. (2) A Federal lessee protection bond shall be released upon the written consent of the permittee or lessee. (3) Where surface coal mining and reclamation operations are subject to an approved mining plan, a performance bond shall be released by the State after the release is concurred in by OSM. [48 FR 6935, Feb. 16, 1983; 48 FR 13985, Apr. 1, 1983, as amended at 48 FR 44779, Sept. 30, 1983; 55 FR 9402, Mar. 13, 1990] § 740.17 Inspection, enforcement and civil penalties. (a) General requirements. (2) Where the State is the regulatory authority under a cooperative agreement, the State program shall govern inspection, enforcement and civil penalty activities by the regulatory authority with respect to surface coal mining and reclamation operations on Federal lands, while the requirements of part 842, 843 and 845 of this chapter shall govern OSM inspection, enforcement and civil penalty activities conducted in oversight of the State program. (3) The requirements of this section shall not apply to coal exploration on Federal lands subject to the requirements of 43 CFR parts 3400. (b) Right of entry. (2) Any authorized representative of the regulatory authority and, as applicable, the Bureau of Land Management may, at reasonable times and without delay, have access to and copy any records and inspect any monitoring equipment or method of operation required under the Act, this subchapter and the permit, lease, license or mining plan in accordance with paragraph (a) of this section. (3) No search warrant shall be required with respect to any activity under paragraph (a) or (b) of this section, except entry into a building without consent of the person in control of the building. (c) Inspections. [48 FR 6935, Feb. 16, 1983, as amended at 48 FR 44779, Sept. 30, 1983] § 740.19 Performance standards. (a) Operations and reclamation. (2) Surface coal mining and reclamation operations on lands containing leased Federal coal shall be conducted in accordance with the requirements of the terms, conditions and stipulations of the lease issued under the Mineral Leasing Act and its implementing regulations in 43 CFR parts 3400, as applicable, and the mining plan. (b) Completion of operations and abandonment. (2) Where there is a Federal lease bond: (i) Not less than 30 days prior to permanent cessation or abandonment of surface coal mining and reclamation operations, the person conducting those operations shall submit to OSM, in duplicate, a notice of intention to cease or abandon those operations, with a statement of the number of acres affected by the operations, the extent and kind of reclamation accomplished and the structures and other facilities that are to be removed from or remain on the permit area. (ii) Upon receipt of this notice, the Bureau of Land Management and the appropriate Federal land management agency shall promptly make joint inspections to determine whether all operations have been completed in accordance with the requirements of 43 CFR parts 3400, the lease or licenses and the mining plan. Where all of these requirements have been complied with, the liability under the lease bond of the person conducting surface coal mining and reclamation operations shall be terminated. (3) Where OSM is the regulatory authority, public hearings held with respect to final abandonment and releases of the performance bonds shall be in accordance with 5 U.S.C. 554 and 43 CFR part 4. [48 FR 6935, Feb. 16, 1983, as amended at 48 FR 44779, Sept. 30, 1983]

Related documents

Record · ID 508187 · SHA-256 18967a8891bfdd12
Retrieved via Conceptio — every document is proof-bundled with source, license, and retrieval metadata.