48 CFR Part 1348 — Value Engineering
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
PART 1348—VALUE ENGINEERING Authority: 41 U.S.C. 414; 48 CFR 1.301-1.304. Source: 75 FR 10570, Mar. 8, 2010, unless otherwise noted. Subpart 1348.1—Policies and Procedures 1348.102 Policies. (a) Contracting activities shall send contractor-submitted Value Engineering Change Proposals (VECPs) to the appropriate technical personnel for review. (b) Technical personnel shall conduct a comprehensive review of VECPs for technical feasibility, usefulness, and adequacy of the contractor's estimate of cost savings; make a written report; and recommend acceptance or rejection to the contracting officer. (c) The designee authorized to grant exemptions from value engineering provisions in appropriate supply, service, architect-engineer and construction contracts is set forth in CAM 1301.70. Subpart 1348.2—Contract Clauses 1348.201 Clauses for supply or service contracts. The designee authorized to grant exemptions from the requirements of FAR Part 48 for a contract or class of contracts is set forth in CAM 1301.70.
Related documents
- 48 CFR Part 2448 — Value Engineering#511541
- 23 CFR Part 627 — Value Engineering#507197
- 48 CFR Part 2848 — Value Engineering#511587
- 48 CFR Part 1448 — Value Engineering#511340
- 48 CFR Part 48 — Value Engineering#510905
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive