16 U.S.C. § 837e — Transmission lines for other electric energy; rates
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
Any capacity in Federal transmission lines connecting, either by themselves or with non-Federal lines, a generating plant in the Pacific Northwest or Canada with the other area or with any other area outside the Pacific Northwest , which is not required for the transmission of Federal energy or the energy described in section 837h of this title , shall be made available as a carrier for transmission of other electric energy between such areas. The transmission of other electric energy shall be at equitable rates determined by the Secretary, but such rates shall be subject to equitable adjustment at appropriate intervals not less frequently than once in every five years as agreed to by the parties. No contract for the transmission of non-Federal energy on a firm basis shall be affected by any increase, subsequent to the execution of such contract, in the requirements for transmission of Federal energy, the energy described in section 837h of this title , or other electric energy. ( Pub. L. 88–552, § 6 , Aug. 31, 1964 , 78 Stat. 758 .)
Related documents
- 16 U.S.C. § 824s — Transmission infrastructure investment#569604
- 16 U.S.C. § 450w — Transferred#571463
- 16 U.S.C. § 825s — Sale of electric power from reservoir projects; rate schedules; preference in sale; construction of transmission lines; disposition of moneys#569568
- 16 U.S.C. § 837 — Definitions#569433
- 16 U.S.C. § 838g — Schedules of rates and charges for sale of Federal power and transmission of non-Federal power; confirmation and approval; criteria for modification and establishment#569425
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive