Conceptio › Archive › US Code (LII)
US Code (LII)public full text

25 U.S.C. § 315 — Time for completion of road; forfeiture

United States Code · United States Code (via Cornell Legal Information Institute)
US Code (LII) · Legal · License: Public Domain
Open Source ↗
completionstatutetimeunited-statesus-law
united states, us law, united states code, usc, statute, us federal statute, 25, 315, 25 usc 315, 25 u.s.c. 315, time, for, completion, of, road, forfeiture

If any such company shall fail to construct and put in operation one-tenth of its entire line in one year, or to complete its road within three years after the approval of its map of location by the Secretary of the Interior, the right of way granted shall be deemed forfeited and abandoned ipso facto as to that portion of the road not then constructed and in operation: Provided, That the Secretary may, when he deems proper, extend, for a period not exceeding two years, the time for the completion of any road for which right of way has been granted and a part of which shall have been built. (Mar. 2, 1899, ch. 374, § 4, 30 Stat. 991 .)

Related documents

Record · ID 583313 · SHA-256 41cbd3f8e51d5df4
Retrieved via Conceptio — every document is proof-bundled with source, license, and retrieval metadata.