ConceptioArchiveUS Code (LII)
US Code (LII)public full text

43 U.S.C. § 852b — Survey of lands prior to transfer; time for survey; availability of funds; lands suitable for transfer

United States Code · United States Code (via Cornell Legal Information Institute)
US Code (LII) · Legal · License: Public Domain
Open Source ↗
availabilityfundslandspriorsurveytimetransfer
united states, us law, united states code, usc, statute, us federal statute, 43, 852b, 43 usc 852b, 43 u.s.c. 852b, survey, of, lands, prior, to, transfer, time, for, survey, availability, of, funds, lands, suitable, for, transfer

Prior to issuance of an instrument of transfer, lands must be surveyed. The Secretary of the Interior shall within five years, subject to the availability of funds, survey the exterior boundaries of lands approved as suitable for transfer to the State. ( Pub. L. 89–470, § 4 , June 24, 1966 , 80 Stat. 220 .)

Related documents

Record · ID 596209 · SHA-256 6cae2851be1a388e
Retrieved via Conceptio — every document is proof-bundled with source, license, and retrieval metadata.