43 U.S.C. § 390h-12p — Tooele Wastewater Treatment and Reuse Project
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
(a) Authorization The Secretary , in cooperation with Tooele City, Utah, is authorized to participate in the design, planning, and construction of the Tooele Wastewater Treatment and Reuse Project. (b) Cost share The Federal share of the cost of a project described in subsection (a) shall not exceed 25 percent of the total cost. (c) Limitation The Secretary shall not provide funds for the operation or maintenance of a project described in subsection (a). ( Pub. L. 102–575, title XVI, § 1630 , as added Pub. L. 104–266, § 2(a)(2) , Oct. 9, 1996 , 110 Stat. 3294 .) CFR Title Parts 10 903
Related documents
- Tertiary Wastewater Treatment Through MBBR Technology#982917
- Transfert heavy metal sewage sludge as fertilizer from soil to ray grass#652896
- Adsorbent modified constructed wetlands for advanced removal of bulk organics and heavy metals from municipal wastewater effluent#68439
- Nutrient Chemistry in the Elizabeth Lake Subwatershed: Effects of Onsite Wastewater Treatment Systems on Groundwater and Lake Water Quality, Los Angeles County, California#621810
- Algal Industry 5.0 for sustainable aquafeeds: integrating digital technologies and bioprocessing#355769
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive