ConceptioArchiveEU TED (Tenders Electronic Daily)
EU TED (Tenders Electronic Daily)open access

Germany – Education and training services – 81322602 - International Consultancy for the Development of off-grid Renewable Energy Projects - Lot 2 — Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH (DEU) · 1 EUR

Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH · EU Tenders Electronic Daily (TED)
EU TED (Tenders Electronic Daily) · Contracts · License: Open Access
Open Source ↗
deu
european union, public procurement, eu tender, ted, tenders electronic daily, 542331-2026, Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH, DEU, services, can-standard, 80000000, DEU

4eeed617-dc96-4aef-beef-7a7ba9f82b7e-01 Datum des Vertragsschlusses war der 10.07.2026 PROCEDURE cor-buy 1.00 RES-0001 1.00 1.00 selec-w TEN-0001 tenders 8 t-esubm 8 t-oth-eea 0 t-no-eea 2 t-verif-inad 3 t-verif-inad-low 0 CON-0001 false false false LOT-0001 TEN-0001 false 1.00 not-known TPA-0001 LOT-0001 5 - 92772 CON-0001 2026-07-10+02:00 Inensus GmbH, 38640 Gosslar 1 TEN-0001 TPA-0001 ORG-0003 29 https://www.giz.de ORG-0001 Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Dag-Hammarskjöld-Weg 1 - 5 Eschborn 65760 DE71A DEU 993-80072-52 +49 89 3581 6000 [email protected] https://www.bundeskartellamt.de ORG-0002 Vergabekammern des Bundes Kaiser-Friedrich-Straße 16 Bonn 53113 DEA22 DEU 022894990 +49 2289499-0 +49 2289499-163 [email protected] false UBO-0001 small ORG-0003 Inensus GmbH Am Stollen 19D Gosslar 38640 DE916 DEU 38640 [email protected] ORG-0004 Datenservice Öffentlicher Einkauf (in Verantwortung des Beschaffungsamts des BMI) Bonn 53119 DEA22 DEU 0204:994-DOEVD-83 +49228996100 [email protected] UBO-0001 DEU 00542331-2026 149/2026 2026-08-05+02:00 2.3 eforms-sdk-1.13 eforms-sdk-1.13 ded49fec-7cc9-41c2-a33d-ce29b2f66bcd bdac97f1-763f-45a5-a24b-cf3c23800378 2026-08-04+02:00 09:31:54+02:00 01 2026-08-04+02:00 32014L0024 can-standard DEU pub-undert-cga gen-pub ORG-0001 ted-esen ORG-0004 false false false eu-funds vgv According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as 1. the applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected, 2. complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice. 3. complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids, 4. more than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint. Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.

Textvorlage erstellen/auswählen/bearbeiten ORG-0002 open false false 81322602 81322602 - International Consultancy for the Development of off-grid Renewable Energy Projects - Lot 2 NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas.

Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilization of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition.

Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. Off-grid progress, particularly in mini-grids, is hindered by barriers such as limited forex access and technical capacity.

To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively.

Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component. 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents

Framework (Energy Transition Policy and State Electricity Market support) 1. New or improved laws, regulations or instruments to achieve the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy) 2. Support 5 states on their respective State Electricity Market through the development of policies, laws, or instruments to advance RE investment.

The procedure is divided into two lots. This is Lot 2. services #Bekanntmachungs-ID: CXTRYY6YTTJHCX2C#

All communication takes place in English via communication tool in the project area of the procurement portal. 80000000 - NGA LOT-0001 false false false eu-funds false poi-exa 30.00000000 price Price Consideration of the price through the valuation method "Bestangebots-Quotienten-Methode" poi-exa 70.00000000 quality Erreichte Gesamtpunktzahl nach fachlicher Wertung (inkl. Mindbed.) Erreichte Gesamtpunktzahl nach fachlicher Wertung (inkl. Mindbed.) min-score 500.00000000 quality Erreichte Gesamtpunktzahl nach fachlicher Wertung (inkl. Mindbed.) Erreichte Gesamtpunktzahl nach fachlicher Wertung (inkl. Mindbed.) ORG-0001 According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as 1. the applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected, 2. complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice. 3. complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids, 4. more than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint. Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.

Textvorlage erstellen/auswählen/bearbeiten ORG-0002 true false none none 81322602 81322602 - International Consultancy for the Development of off-grid Renewable Energy Projects - Lot 2 Short Project Description: Nigerian Energy Support Programme (NESP)

NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas.

Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world.

With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition.

Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW.

To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively.

Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment.

Tasks of the contractor:

Work package 1: Premium Grids (On-grid)

This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation.

The following activities are planned under this work package:

1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field.

Work Package 2: Framework and Policy Development Support

This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE.

The following activities are planned under this work package:

1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners. services env-imp See tender documents clim-mitig pollu-prev soc-obj See tender documents gen-eq 80000000 - NGA 19 GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference. 2 GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference. 2000-01-01Z

Related documents

Record · ID 606039 · SHA-256 79891cb9ccd4ca3e
Retrieved via Conceptio — every document is proof-bundled with source, license, and retrieval metadata.