545737-2025 update-add 17 ORG-0001 Landsvirkjun Katrínartún 2 Reykjavík 105 IS001 ISL 4202691299 Procurement Department 5159000 [email protected] https://op.europa.eu ORG-0000 Publications Office of the European Union Luxembourg 2417 LU000 LUX PUBL +352 29291 [email protected] 00583611-2025 171/2025 2025-09-08+02:00 2.3 eforms-sdk-1.13 8a2e280e-8d66-447c-8356-00a70b21e08a 98dec83e-d5fc-4bd9-9a37-320174c4fff4 2025-09-04Z 14:54:01Z 01 32014L0025 cn-standard ENG electricity ORG-0001 ted-esen ORG-0000 epo-procurement-document open false 2025-28 Hydro Generators in Búrfell Power Plant Landsvirkjun (the Authority) is Iceland’s largest electricity generator, with 18 power stations all over Iceland. The Authority produces 70% of all electricity in Iceland, from 100% renewable energy resources: hydroelectric energy, geothermal energy, and wind energy. In operating power stations, emphasis is placed on a holistic vision, where prudence, reliability, and harmony of the operations with the environment and society are the guiding principles. The tender is for four (4) generators for Búrfell Hydropower Station. The Project involves design, manufacture, testing, delivery and erection including commissioning of the partial renewal of four (4) synchronous, hydraulic turbine driven generators and its sub systems for Búrfell Hydropower Station. Stators are to be renewed in four of the generators. Búrfell power plant is located about 70 km outside of Reykjavik. In addition, it also involves supervision of the installation Work performed by the Purchaser´s employees, as well as commissioning and site testing as further described in these Tender Documents no. 2025-28. supplies 42100000 31120000 31100000 IS002 ISL LOT-0001 true See tender documents _DEFAULT_VALUE_CHANGE_ME_ non-restricted-document https://in-tendhost.co.uk/landsvirkjun/aspx/Home See tender documents. epo-procurement-document false none no performance See tender documents not-allowed ORG-0001 https://in-tendhost.co.uk/landsvirkjun/aspx/Home 90 ORG-0001 ORG-0001 ENG ISL required true 2025-11-07Z 11:00:00Z 2025-10-28Z 16:00:00Z 2025-11-07Z 11:00:00Z false none none 2025-28 Hydro Generators in Búrfell Power Plant See procurement documents. supplies 42100000 31120000 31100000 Southern Iceland. anyw-cou ISL 2025-12-01Z 2030-11-28Z 0