4500000 RES-0001 selec-w TEN-0001 4500000 tenders 7 CON-0001 LOT-0001 TEN-0001 no TPA-0001 LOT-0001 000173415 CON-0001 2026-07-01+01:00 2026-07-27+01:00 false 456947 TEN-0001 TPA-0001 ORG-0002 29 https://www.ucc.ie ORG-0001 University College Cork University College Cork, 6 Elderwood, College Road Cork T12 VH39 IE061 IRL IE0006286E +353 21 4903514 [email protected] small ORG-0002 Wm. Black and Sons Contracting Ltd Half Moon Lane, South Douglas Road Cork T12T2VK IE053 IRL 341309 00353214362355 [email protected] ORG-0003 The High Court of Ireland Four Courts, Inns Quay, Dublin 7 The High Court of Ireland Dublin D07 WDX8 IE061 IRL The High Court of Ireland +353 1 8886000 [email protected] ORG-0004 European Dynamics S.A. European Dynamics S.A. Athens 15125 EL301 GRC 002024901000 +30 2108094500 [email protected] 00596014-2026 166/2026 2026-08-28+02:00 2.3 eforms-sdk-1.13 83da6c54-a3ee-47de-8c54-4860f838391c 85deed45-2133-401a-9410-21161460547f 2026-08-26+01:00 17:41:34+01:00 01 32014L0024 can-standard ENG https://www.ucc.ie body-pl education ORG-0001 ted-esen ORG-0004 open 40bb536a-1517-4423-997c-df10bfd3a6d5-01 false Establishment of a Multi Supplier Framework of Specialist Contractors for HVAC Installations at UCC and Contract for UCC Boole Special Collections Chiller Upgrade. UCC hereby issues this information in accordance with the requirements of EC directive 2014/24/EU for Establishment of a Multi Supplier Framework of Specialist Contractors using the Open Procedure for HVAC Installations at UCC and Contract for UCC Boole Special Collections Chiller Upgrade. The initial contract comprise works to the Boole Library which is currently heated from the main campus district heating system. There are 2no. 300 kW chillers on the roof which were sized for comfort cooling via the library AHUs, however these are not used for that purpose. The Special Collections area in Q-1 houses rare and important books and artifacts, which need to be maintained at a certain temperature and humidity of approximately 18 degrees and 55 percent relative humidity. In order to dehumidify the large comfort cooling chillers are used and heating is supplied by 2no. 100kW boilers. Both the chillers and boilers, as well as the associated distribution pumps, are all enabled 24x7 to fulfil the required conditions in the space. The chillers are old and in poor condition, and one is currently not operational. The initial contract is for the installation of a small chiller system which is matched to the cooling load which will be more efficient and reliable, as well as being able to deliver the required CHW temperatures to achieve adequate dehumidification. The top six ranked tenders will be appointed to the Framework. works 4500000 4500000 45331000 45331200 45331210 45331220 45331230 45331231 45350000 45310000 The country subdivision only allows the selection of Dublin , the works will be undertaken in Cork IE061 IRL LOT-0001 false no-eu-funds 0.60 Weight Decimal exact cost 0.60 Cost at 60% quality Quality at 40% ORG-0001 ORG-0003 ORG-0003 true false none fa-w-rc 0 Establishment of a Multi Supplier Framework of Specialist Contractors for HVAC Installations at UCC and Contract for UCC Boole Special Collections Chiller Upgrade. UCC hereby issues this information in accordance with the requirements of EC directive 2014/24/EU for Establishment of a Multi Supplier Framework of Specialist Contractors using the Open Procedure for HVAC Installations at UCC and Contract for UCC Boole Special Collections Chiller Upgrade. The initial contract comprise works to the Boole Library which is currently heated from the main campus district heating system. There are 2no. 300 kW chillers on the roof which were sized for comfort cooling via the library AHUs, however these are not used for that purpose. The Special Collections area in Q-1 houses rare and important books and artifacts, which need to be maintained at a certain temperature and humidity of approximately 18 degrees and 55 percent relative humidity. In order to dehumidify the large comfort cooling chillers are used and heating is supplied by 2no. 100kW boilers. Both the chillers and boilers, as well as the associated distribution pumps, are all enabled 24x7 to fulfil the required conditions in the space. The chillers are old and in poor condition, and one is currently not operational. The initial contract is for the installation of a small chiller system which is matched to the cooling load which will be more efficient and reliable, as well as being able to deliver the required CHW temperatures to achieve adequate dehumidification. The top six ranked tenders will be appointed to the Framework. works The six number successful participants for this multi supplier framework are • Architectural Steel and Mechanical Services Ltd. • BMC Eirco Refrigeration Ltd • Dominic O Connor Ltd • Eirdata Environmental Services Ltd • Icon Engineering Ltd • Wm. Black and Sons Contracting Ltd none 4500000 4500000 45331000 45331200 45331210 45331220 45331230 45331231 45350000 45310000 The country subdivision only allows the selection of Dublin , the works will be undertaken in Cork IE061 IRL 48 2026-08-26+01:00