Business Process Optimization for the Liberia Electricity Corporation — Liberia Electricity Sector Strengthening and Access Project (LESSAP) Phase 2 (Liberia)
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
Contract Award
Project: P180498-Liberia Electricity Sector Strengthening and Access Project (LESSAP) Phase 2
Loan/Credit/TF Info: IDA-76120
Bid/Contract Reference No: LR-LEC-497937-CS-QCBS
Procurement Method: QCBS-Quality And Cost-Based Selection
Scope of Contract:
Consultancy Services for the Business Process Optimization for the Liberia Electricity Corporation (LEC)
Notice Version No: 0
Date Notification of Award Issued
(YYYY/MM/DD) 2026/07/31
Duration of Contract
34 Week(s)
Minimum Qualifying Score
75
Awarded Firm(s):
MANITOBA HYDRO INTERNATIONAL LTD. (MHI (1028623)
211commerce Dr., Winnipeng, Mb, Canada, R3P, 1A3 1-204-4805200 Country: Canada
Beneficial Ownership Details
Form Date: 18-AUG-26
Summary of Reason
No beneficiary owner meeting the three conditions
Scores
Technical:
84.84
Consultant Specific Experience:
5
Methodology:
23.3
Key Personnel:
52.04
Transfer of Knowledge:
4.5
Participation by Nationals:
0
Financial:
100
Combined:
87.87
Rank:
1
Final Evaluation Price
USD 1218765.00
Signed Contract Price
USD 1218765.00
Price:
Currency:
Amount:
United States Dollars (United States Dollars)
1218765.00
Rejected Firm(s):
DELOITTE & TOUCHE - DELOITTE GHANA AND DELOITTE INDIA (1033297)
Country: Ghana
Final Evaluation Price
Reason for Rejection
Failure to meet minimum technical score
Price:
Currency:
Amount:
KPMG (466507)
Country: Ghana
Final Evaluation Price
Reason for Rejection
Failure to meet minimum technical score
Price:
Currency:
Amount:
Related documents
- Procurement of supply, Installation, testing and commissioning of equipment for the upgradation of 16 existing AWS of GMRC in UIB. — Tarbela Fourth Extension Hydropower Project (Pakistan)#1099861
- Fourniture et Mise en Exploitation des équipements dans le cadre de la poursuite du Programme de Protection des Revenus — Inclusive Development through Electricity Access (Togo)#782989
- The optimization of energy recovery device sizes and locations in municipal water distribution systems during extended-period simulation#313576
- Escuela Técnica Superior de Ingeniería Industrial de Béjar. Guía académica 2008-2009#185221
- The performance of traditional and non-traditional forms of infrastructure procurement options in Africa#220261
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive