Technical & Financial Audit of ASPIRE Project — Phase 1 Advancing Sustainability in Performance, Infrastructure, and Reliability of the Energy Secto (West Bank and Gaza)
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
Contract Award
Project: P170928-Phase 1 Advancing Sustainability in Performance, Infrastructure, and Reliability of the Energy Sector in the West Bank and Gaza
Loan/Credit/TF Info: TF-B3036
Bid/Contract Reference No: GZ-PENRA-520943-CS-QCBS
Procurement Method: QCBS-Quality And Cost-Based Selection
Scope of Contract:
Auditing Assignment for ASPIRE Project
Notice Version No: 0
Date Notification of Award Issued
(YYYY/MM/DD) 2026/04/19
Duration of Contract
1 Year(s)
Minimum Qualifying Score
80
Awarded Firm(s):
MAZARS CHARTERED ACCOUNTANTS AND CONSULTANTS (520482)
Ramallah Country: West Bank and Gaza
Scores
Technical:
95.27
Consultant Specific Experience:
9.17
Methodology:
21.33
Key Personnel:
64.77
Financial:
100
Combined:
96.69
Rank:
1
Final Evaluation Price
USD 74400.00
Signed Contract Price
USD 86304.00
Price:
Currency:
Amount:
United States Dollars (United States Dollars)
86304.00
Evaluated Firm(s):
TALAL ABU GHAZALEH & CO. (520476)
Country: West Bank and Gaza
Final Evaluation Price
USD 213000.00
Price:
Currency:
Amount:
Rejected Firm(s):
SULEIMAN & CO. CERTIFIED PUBLIC ACCOUNTANTS (RSM INTERNATIONAL) (520484)
Country: West Bank and Gaza
Final Evaluation Price
Reason for Rejection
Non Responsive
Price:
Currency:
Amount:
Related documents
- Switzerland – Engineering services – Resilient and Efficient Utilities in North Macedonia — State Secretariat for Economic Affairs (SECO) (CHE)#606109
- Method for improving the efficiency and durability of electrical energy storage … — Northwestern University (US9945039B2)#607708
- Design and Development of Ministry Website — South Sudan Energy Sector Access and Institutional Strengthening Project (South Sudan)#606849
- The Grace Commission Report - Revealed IRS Front for Banking Dynasties in 1984#198714
- Infusing sustainability principles into manufacturing/mechanical engineering curricula#353496
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive