Contract Award
Project: P181341-Accelerating Sustainable and Clean Energy Access Transformation in SOMALIA
Loan/Credit/TF Info: IDA-E2680
Bid/Contract Reference No: SO-MOEWR-464597-CW-RFB
Procurement Method: RFB-Request for Bids
Scope of Contract:
Design, Supply, Installation, Testing, and Commissioning of 55MWp (AC) Solar PV Power Plant with 160MWh of Battery Energy Storage System for Beco at Jazeera Power Plant, Mogadishu, Somalia
Notice Version No: 0
Date Notification of Award Issued
(YYYY/MM/DD) 2026/07/29
Duration of Contract
18 Month(s)
Awarded Bidder(s):
RENEWVIA ENERGY CORPORATION (866537)
2951 Flowers Road, S Suite 217 Atlanta, GA 30341 Country: United States
ASUNIM RENEWABLE ENERGY JOINT STOCK COMPANY (967008)
Ankara, Turkey Country: Turkiye
CIVIL AND ELECTRICAL PROJECTS CONTRACTING COMPANY LIMITED (1010430)
Jeddah, Saudi Arabia Country: Saudi Arabia
Evaluation Scores
Bid Price at Opening USD
Evaluated Bid Price USD 45018820.23
Signed Contract price USD 45018820.23
Beneficial Ownership Details
RENEWVIA ENERGY CORPORATION (866537)
Form Date: 16-SEP-24
ASUNIM RENEWABLE ENERGY JOINT STOCK COMPANY (967008)
Form Date: 01-SEP-25
CIVIL AND ELECTRICAL PROJECTS CONTRACTING COMPANY LIMITED (1010430)
Form Date: 02-AUG-26
Evaluated Bidder(s):
CCC INTERNATIONAL ENGINEERING NIGERIA LIMITED (353954)
No 8 Takwa Crescent, Wuse 2, Abuja Country: Nigeria
GUANGXI YINGCHEN NEW ENERGY TECHNOLOGY CO., LTD (1001363)
No. 1606, Office Building B-3, Beibu Gulf Science Park, No.39, Zhuangjin Avenue, Nanning, Guangxi Province, China Country: China
Evaluation Scores
Bid Price at Opening USD
Evaluated Bid Price USD 43089553.38