HAL (France)open access
Integrating the Digital Twin into Elastic Cost Optimization for Legally Defensible Construction Schedule Management
0
This document is indexed with metadata only — full text is not available in the archive for this record.
Open the official source ↗
Related documents
Record · ID 614875
Conceptio Open Knowledge Archive — every document is proof-bundled with source, license, and retrieval metadata.