Prepared in cooperation with Missouri Department of Transportation
Bathymetric and Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, Missouri, May 19–26, 2021
Scientific Investigations Report 2024–5021
U.S. Department of the Interior U.S. Geological Survey
Cover: Structure A6288 on State Highway 19 at Hermann, Missouri. Photograph by Richard J. Huizinga, U.S. Geological Survey.
Bathymetric and Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, Missouri, May 19–26, 2021 By Richard J. Huizinga
Prepared in cooperation with Missouri Department of Transportation
Scientific Investigations Report 2024–5021
U.S. Department of the Interior U.S. Geological Survey
U.S. Geological Survey, Reston, Virginia: 2024
For more information on the USGS—the Federal source for science about the Earth, its natural and living resources, natural hazards, and the environment—visit https://www.usgs.gov or call 1–888–392–8545. For an overview of USGS information products, including maps, imagery, and publications, visit https://store.usgs.gov/ or contact the store at 1–888–275–8747. Any use of trade, firm, or product names is for descriptive purposes only and does not imply endorsement by the U.S. Government. Although this information product, for the most part, is in the public domain, it also may contain copyrighted materials as noted in the text. Permission to reproduce copyrighted items must be secured from the copyright owner. Suggested citation: Huizinga, R.J., 2024, Bathymetric and velocimetric surveys at highway bridges crossing the Missouri River between Kansas City and St. Louis, Missouri, May 19–26, 2021: U.S. Geological Survey Scientific Investigations Report 2024–5021, 101 p., https://doi.org/10.3133/sir20245021. Associated data for this publication: Huizinga, R.J., and Rivers, B.C., 2023, Bathymetry and velocity data from surveys at highway bridges crossing the Missouri River between Kansas City and St. Louis, Missouri, May 19–26, 2021 (ver. 2.0, August 2023): U.S. Geological Survey data release, https://doi.org/10.5066/P9ULGQ4W. U.S. Geological Survey, 2023, USGS water data for the Nation: U.S. Geological Survey National Water Information System database, https://doi.org/10.5066/F7P55KJN. ISSN 2328-0328 (online)
iii
Acknowledgments The author would like to acknowledge Dennis Heckmann (retired), Bryan Hartnagel, Travis Stump, and Jennifer Harper at the Missouri Department of Transportation for their role in funding and supporting the work of the project detailed in this report. The author also wishes to gratefully acknowledge Benjamin C. Rivers and Aaron L. Walsh of the U.S. Geological Survey for their assistance in collecting and processing the data for this project.
v
Contents Acknowledgments����������������������������������������������������������������������������������������������������������������������������������������iii Abstract�����������������������������������������������������������������������������������������������������������������������������������������������������������1 Introduction����������������������������������������������������������������������������������������������������������������������������������������������������1 Purpose and Scope������������������������������������������������������������������������������������������������������������������������������2 Description of Study Area�������������������������������������������������������������������������������������������������������������������5 Description of Streamflow Conditions����������������������������������������������������������������������������������������������5 Description of Equipment and Basic Processing����������������������������������������������������������������������������5 Basic Description of Methods������������������������������������������������������������������������������������������������������������8 Surveying Methods���������������������������������������������������������������������������������������������������������������������8 Survey Quality-Assurance Measures��������������������������������������������������������������������������������������8 Uncertainty Estimation��������������������������������������������������������������������������������������������������������������10 Results of Bathymetric and Velocimetric Surveys���������������������������������������������������������������������������������13 Structure A5664 on State Highway 13 at Lexington, Missouri����������������������������������������������������14 Structure A5910 on U.S. Highway 24 at Waverly, Missouri���������������������������������������������������������26 Structure K0999 on State Highway 41 at Miami, Missouri�����������������������������������������������������������34 Structure G0069 on State Highway 240 at Glasgow, Missouri����������������������������������������������������42 Structure A4574 on State Highway 5 at Boonville, Missouri�������������������������������������������������������50 Structure L0962 on Interstate 70 near Rocheport, Missouri��������������������������������������������������������58 Structures L0550 and A4497 on U.S. Highway 54 at Jefferson City, Missouri��������������������������66 Structure A6288 on State Highway 19 at Hermann, Missouri�����������������������������������������������������78 Summary and Conclusions�������������������������������������������������������������������������������������������������������������������������87 References Cited�����������������������������������������������������������������������������������������������������������������������������������������88 Glossary���������������������������������������������������������������������������������������������������������������������������������������������������������91 Appendix 1. Shaded Triangulated Irregular Network Images of the Channel and Side of Pier for Each Surveyed Pier���������������������������������������������������������������������������������������������������������93
Figures 1.
2. 3. 4. 5.
6. 7.
Map showing location of highway bridges crossing the Missouri and Mississippi Rivers in and into Missouri, and bathymetric surveys of the Missouri River channel, May 19–26, 2021���������������������������������������������������������������������������������3 Graphs showing hourly streamflow at selected streamgages in the study area on the Missouri River between Kansas City and St. Louis, Missouri�����������������������������������6 Photographs showing the multibeam echosounder���������������������������������������������������������������7 Diagrams showing generalized effects on data from a multibeam echosounder�����������10 Map showing uncertainty of gridded bathymetric data from the Mississippi River channel near structure G0069 on Missouri State Highway 240 at Glasgow, Missouri����������������������������������������������������������������������������������������������������������������������������������������12 Map showing bathymetric survey of the Missouri River channel near structure A5664 on State Highway 13 at Lexington, Missouri��������������������������������������������������������������16 Graph showing frequency distribution of bed elevations for bathymetric survey-grid cells in 1-foot elevation bins on the Missouri River near structure A5664 on State Highway 13 at Lexington, Missouri, on May 19, 2021, compared to previous surveys in 2011, 2013, and 2017���������������������������������������������������������������������������17
vi
8.
9.
10.
11.
12. 13.
14.
15.
16.
17.
18. 19. 20.
21.
22.
Diagram showing key features, substructural and superstructural details, and surveyed channel bed of structure A5664 on State Highway 13 crossing the Missouri River at Lexington, Missouri�������������������������������������������������������������������������������������19 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A5664 on State Highway 13 at Lexington, Missouri, on May 19, 2021, and May 23, 2017, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������20 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A5664 on State Highway 13 at Lexington, Missouri, on May 19, 2021, and April 24, 2013, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������24 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A5664 on State Highway 13 at Lexington, Missouri, on May 19, 2021, and July 20, 2011, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������25 Map showing bathymetric survey of the Missouri River channel near structure A5910 on U.S. Highway 24 at Waverly, Missouri�������������������������������������������������������������������27 Graph showing frequency distribution of bed elevations for bathymetric survey-grid cells in 1-foot elevation bins on the Missouri River near structure A5910 on U.S. Highway 24 at Waverly, Missouri, on May 20, 2021, compared to previous surveys in 2011, 2013, and 2017��������������������������������������������������������������������������������28 Diagram showing key features, substructural and superstructural details, and surveyed channel bed of structure A5910 on U.S. Highway 24 crossing the Missouri River at Waverly, Missouri���������������������������������������������������������������������������������������29 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A5910 on U.S. Highway 24 at Waverly, Missouri, on May 20, 2021, and May 23, 2017, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������30 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A5910 on U.S. Highway 24 at Waverly, Missouri, on May 20, 2021, and April 25, 2013, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������31 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A5910 on U.S. Highway 24 at Waverly, Missouri, on May 20, 2021, and July 21, 2011, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������32 Map showing bathymetry and vertically averaged velocities of the Missouri River channel near structure A5910 on U.S. Highway 24 at Waverly, Missouri���������������33 Map showing bathymetric survey of the Missouri River channel near structure K0999 on State Highway 41 at Miami, Missouri���������������������������������������������������������������������35 Graph showing frequency distribution of bed elevations for bathymetric survey-grid cells in 1-foot elevation bins on the Missouri River near dual bridge structure K0999 on State Highway 41 at Miami, Missouri, on May 20, 2021, compared to previous surveys in 2011, 2013, and 2017��������������������������������������������������������36 Diagram showing key features, substructural and superstructural details, and surveyed channel bed of structure K0999 on State Highway 41 crossing the Missouri River at Miami, Missouri�������������������������������������������������������������������������������������������37 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure K0999 on State Highway 41 at Miami, Missouri, on May 20, 2021, and May 24, 2017, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������38
vii
23.
24.
25. 26. 27.
28.
29.
30.
31.
32. 33. 34.
35.
36.
37.
Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure K0999 on State Highway 41 at Miami, Missouri, on May 20, 2021, and April 25, 2013, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������39 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure K0999 on State Highway 41 at Miami, Missouri, on May 20, 2021, and July 21, 2011, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������40 Map showing bathymetry and vertically averaged velocities of the Missouri River channel near structure K0999 on State Highway 41 at Miami, Missouri����������������41 Map showing bathymetric survey of the Missouri River channel near structure G0069 on State Highway 240 at Glasgow, Missouri��������������������������������������������������������������43 Graph showing frequency distribution of bed elevations for bathymetric survey-grid cells in 1-foot elevation bins on the Missouri River near structure G0069 on State Highway 240 at Glasgow, Missouri, on May 20, 2021, compared to previous surveys in 2011, 2013, and 2017���������������������������������������������������������������������������44 Diagram showing key features, substructural and superstructural details, and surveyed channel bed of structure A3292 on State Highway 240 crossing the Missouri River at Glasgow, Missouri���������������������������������������������������������������������������������������45 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure G0069 on State Highway 240 at Glasgow, Missouri, on May 20, 2021, and May 24, 2017, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������46 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure G0069 on State Highway 240 at Glasgow, Missouri, on May 20, 2021, and April 26, 2013, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������47 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure G0069 on State Highway 240 at Glasgow, Missouri, on May 20, 2021, and July 22, 2011, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������48 Map showing bathymetry and vertically averaged velocities of the Missouri River channel near structure G0069 on State Highway 240 at Glasgow, Missouri���������49 Map showing bathymetric survey of the Missouri River channel near structure A4574 on State Highway 5 at Boonville, Missouri�����������������������������������������������������������������51 Graph showing frequency distribution of bed elevations for bathymetric survey-grid cells in 1-foot elevation bins on the Missouri River near structure A4574 on State Highway 5 at Boonville, Missouri, on May 21, 2021, compared to previous surveys in 2011, 2013, and 2017��������������������������������������������������������������������������������52 Diagram showing key features, substructural and superstructural details, and surveyed channel bed of structure A4574 on State Highway 5 crossing the Missouri River at Boonville, Missouri�������������������������������������������������������������������������������������53 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A4574 on State Highway 5 at Boonville, Missouri, on May 21, 2021, and May 25, 2017, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������54 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A4574 on State Highway 5 at Boonville, Missouri, on May 21, 2021, and April 29, 2013, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������55
viii
38.
39. 40. 41.
42.
43.
44.
45.
46. 47. 48.
49.
50.
51.
Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A4574 on State Highway 5 at Boonville, Missouri, on May 21, 2021, and July 25, 2011, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������56 Map showing bathymetry and vertically averaged velocities of the Missouri River channel near structure A4574 on State Highway 5 at Boonville, Missouri������������57 Map showing bathymetric survey of the Missouri River channel near structure L0962 on Interstate 70 near Rocheport, Missouri������������������������������������������������������������������59 Graph showing frequency distribution of bed elevations for bathymetric survey-grid cells in 1-foot elevation bins on the Missouri River near structure L0962 on Interstate 70 near Rocheport, Missouri, on May 21, 2021, compared to previous surveys in 2011, 2013, and 2017��������������������������������������������������������������������������������60 Diagram showing key features, substructural and superstructural details, and surveyed channel bed of structure L0962 on Interstate 70 crossing the Missouri River near Rocheport, Missouri�����������������������������������������������������������������������������������������������61 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure L0962 on Interstate 70 near Rocheport, Missouri, on May 21, 2021, and May 25, 2017, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������62 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure L0962 on Interstate 70 near Rocheport, Missouri, on May 21, 2021, and April 29, 2013, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������63 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure L0962 on Interstate 70 near Rocheport, Missouri, on May 21, 2021, and July 26, 2011, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������64 Map showing bathymetry and vertically averaged velocities of the Missouri River channel near structure L0962 on Interstate 70 near Rocheport, Missouri�������������65 Map showing bathymetric survey of the Missouri River channel near structures L0550 and A4497 on U.S. Highway 54 at Jefferson City, Missouri��������������������������������������67 Graph showing frequency distribution of bed elevations for bathymetric survey-grid cells in 1-foot elevation bins on the Missouri River near structures L0550 and A4497 on U.S. Highway 54 at Jefferson City, Missouri, on May 26, 2021, compared to previous surveys in 2010, 2011, 2013, and 2017������������������������������������68 Diagram showing key features, substructural and superstructural details, and surveyed channel bed of upstream structure L0550 on U.S. Highway 54 crossing the Missouri River at Jefferson City, Missouri������������������������������������������������������69 Diagram showing key features, substructural and superstructural details, and surveyed channel bed of downstream structure A4497 on U.S. Highway 54 crossing the Missouri River at Jefferson City, Missouri������������������������������������������������������70 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structures L0550 and A4497 on U.S. Highway 54 at Jefferson City, Missouri, on May 26, 2021, and May 31, 2017, with probabilistic thresholding����������������������������������������������������������������������������������������������������������71
ix
52.
53.
54.
55.
56.
57. 58.
59.
60.
61.
62.
63.
Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structures L0550 and A4497 on U.S. Highway 54 at Jefferson City, Missouri, on May 26, 2021, and April 30, 2013, with probabilistic thresholding����������������������������������������������������������������������������������������������������������72 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structures L0550 and A4497 on U.S. Highway 54 at Jefferson City, Missouri, on May 26, 2021, and July 27, 2011, with probabilistic thresholding����������������������������������������������������������������������������������������������������������73 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structures L0550 and A4497 on U.S. Highway 54 at Jefferson City, Missouri, on May 26, 2021, and March 1, 2011, with probabilistic thresholding�������������������������������������������������������������������������������������������������75 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structures L0550 and A4497 on U.S. Highway 54 at Jefferson City, Missouri, on May 26, 2021, and January 26, 2010, with probabilistic thresholding�������������������������������������������������������������������������������������������������76 Map showing bathymetry and vertically averaged velocities of the Missouri River channel near structures L0550 and A4497 on U.S. Highway 54 at Jefferson City, Missouri�������������������������������������������������������������������������������������������������������������������������������77 Map showing bathymetric survey of the Missouri River channel near structure A6288 on State Highway 19 at Hermann, Missouri���������������������������������������������������������������79 Graph showing frequency distribution of bed elevations for bathymetric survey-grid cells in 1-foot elevation bins on the Missouri River near structure A6288 on State Highway 19 at Hermann, Missouri, on May 26, 2021, compared to previous surveys in 2011, 2013, and 2017���������������������������������������������������������������������������80 Diagram showing key features, substructural and superstructural details, and surveyed channel bed of structure A6288 on State Highway 19 crossing the Missouri River at Hermann, Missouri��������������������������������������������������������������������������������������81 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A6288 on State Highway 19 at Hermann, Missouri, on May 26, 2021, and May 31, 2017, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������82 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A6288 on State Highway 19 at Hermann, Missouri, on May 26, 2021, and May 2, 2013, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������83 Map showing difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A6288 on State Highway 19 at Hermann, Missouri, on May 26, 2021, and July 28, 2011, with probabilistic thresholding���������������������������������������������������������������������������������������������������������������������������������85 Map showing bathymetry and vertically averaged velocities of the Missouri River channel near structure A6288 on State Highway 19 at Hermann, Missouri�����������86
x
Tables 1. 2. 3. 4. 5.
6.
7. 8.
Routine periodic surveys of bridges crossing the Missouri and Mississippi Rivers in and into Missouri����������������������������������������������������������������������������������������������������������2 Highway bridges crossing the Missouri River between Kansas City and St. Louis, Missouri������������������������������������������������������������������������������������������������������������������������������4 Results of a beam angle check from two check lines over a reference surface at Lake of the Ozarks near Osage Beach, Missouri, on November 18, 2021����������������������9 Patch test results at two locations on May 4 and November 18, 2021������������������������������10 Total gridded uncertainty results for bathymetric data at a 1.64-foot grid spacing from surveys on the Missouri River between Kansas City and St. Louis, Missouri, May 19–26, 2021��������������������������������������������������������������������������������������������������������11 Bridge and survey information, and selected channel-bed elevations from surveys on the Missouri River between Kansas City and St. Louis, Missouri, August 19–26, 2021���������������������������������������������������������������������������������������������������������������������15 Results near piers and bents from surveys on the Missouri River between Kansas City and St. Louis, Missouri, May 19–26, 2021���������������������������������������������������������18 Summary information and bathymetric surface difference statistics from surveys on the Missouri River between Kansas City and St. Louis, Missouri, from May 19–26, 2021, and previous surveys�������������������������������������������������������������������������22
Conversion Factor
Multiply
By
To obtain
Length foot (ft)
0.3048
meter (m)
mile (mi)
1.609
kilometer (km)
Area square foot (ft2)
square meter (m2)
0.09290 Volume
cubic yard (yd3)
0.7646
cubic meter (m3)
Flow rate foot per second (ft/s)
0.3048
meter per second (m/s)
cubic foot per second (ft3/s)
0.02832
cubic meter per second (m3/s)
Datums Vertical coordinate information is referenced to the North American Vertical Datum of 1988 (NAVD 88). Horizontal coordinate information is referenced to the North American Datum of 1983 (NAD 83).
xi
Supplemental Information In this report, the words “left” and “right” refer to directions that would be reported by an observer facing downstream. Distance on the Missouri River is given in river miles (RM) upstream from river mile 0 at the confluence with the Mississippi River at St. Louis, Missouri, at river mile 195.2 of the Upper Mississippi River. Frequency is given in kilohertz (kHz). Data were collected, processed, and output in the International System of Units, and converted to U.S. customary units for presentation in the maps at the request and for the convenience of the cooperator.
Abbreviations ADCP
acoustic Doppler current profiler
AEP
annual exceedance probability
CUBE
Combined Uncertainty and Bathymetry Estimator
DEM
digital elevation model
DoD
digital elevation model of difference
GCD
Geomorphic Change Detection
GNSS
Global Navigation Satellite System
IHO
International Hydrographic Organization
IMU
inertial measurement unit
INS
inertial navigation system
MBES
multibeam echosounder
MBMS
multibeam echosounder mapping system
MMS
Mobile Mapping Suite
MoDOT
Missouri Department of Transportation
NAVD 88
North American Vertical Datum of 1988
POS MV
Position Orientation Solution for Marine Vessels
RM
river mile
RTK
real-time kinematic
SBET
smoothed best estimate of trajectory
TIN
triangulated irregular network
USACE
U.S. Army Corps of Engineers
USGS
U.S. Geological Survey
Bathymetric and Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, Missouri, May 19–26, 2021 By Richard J. Huizinga
Abstract Bathymetric and velocimetric data were collected by the U.S. Geological Survey, in cooperation with the Missouri Department of Transportation, near nine bridges at eight highway crossings of the Missouri River between Kansas City and St. Louis, Missouri, from May 19 to 26, 2021. A multibeam echosounder mapping system was used to obtain channel-bed elevations for river reaches about 1,640 to 1,840 feet (ft) longitudinally and generally extending laterally across the active channel from bank to bank during low to moderate flood-flow conditions. These surveys provided channel geometry and hydraulic conditions at the time of the surveys and provided characteristics of scour holes that may be useful in developing or verifying predictive guidelines or equations for computing potential scour depth. These data also may be useful to the Missouri Department of Transportation as a low to moderate flood-flow assessment of the bridges for stability and integrity issues with respect to bridge scour during floods. Bathymetric data were collected around every in-channel pier. Scour holes were present at most piers for which bathymetry could be obtained, except those on banks or surrounded by riprap. Occasionally, scour holes were minor and difficult to discern from nearby dunes and ripples. All the bridge sites in this study were previously surveyed and documented in previous studies. Comparisons between bathymetric surfaces from the previous surveys and those of the current (2021) study do not indicate any consistent correlation between channel-bed elevations and streamflow conditions. The average difference between the bathymetric surfaces varied from 1.59 ft higher to 0.95 ft lower in 2021 than 2017, which corresponds to a gain of 100,200 cubic yards and a loss of 55,800 cubic yards, respectively. The average difference between the bathymetric surfaces varied from 2.74 ft higher to 3.05 ft lower in 2021 than 2013, which corresponds to a gain of 111,500 cubic yards and a loss of 169,200 cubic yards, respectively. The average difference between the bathymetric surfaces varied from 4.52 ft higher to 1.38 ft lower in 2021 than 2011, which corresponds to a gain of 221,100 cubic yards and a loss of 90,300 cubic yards, respectively. The most substantial overall net gain was 221,100 cubic yards between 2011 and 2021 at structures
L0550 and A4497 at Jefferson City (site 20). The large net gain likely results from a combination of the mitigation of the scour holes near pier 4 of both bridges and the substantially lower flow in 2021 than in 2011. Alternatively, the most substantial overall net loss was 169,200 cubic yards between 2013 and 2021 at structure A6288 at Hermann (site 21), despite comparable streamflows. Pier size, nose shape, and skew to approach flow had a substantial effect on the size of the scour hole observed at a given pier. Larger and deeper scour holes were present at piers with wide or blunt noses caused by exposed footings or caissons. When a pier was skewed to primary approach flow, the scour hole was generally deeper and larger than at a similar pier without skew; furthermore, the shape of the scour hole near skewed piers in this study generally was longer and deeper on the side with impinging flow. At structure A6288 at Hermann (site 21), the scour hole near pier 5 was difficult to discern from nearby dunes and ripples, whereas the upstream edge of the footing was visible at pier 4, which likely contributes to the larger scour hole near that pier; the top of the footing may blunt the horseshoe vortex at pier 5, but the exposed front of the footing may exacerbate the vortex at pier 4.
Introduction Scour in alluvial channels is the removal of channel-bed and bank material by flowing water and is the leading cause of bridge failures in the United States (Arneson and others, 2012). Scour at a bridge site is caused by short- and long-term geomorphic processes and the local effects from elements of the structure in or next to the waterway (Huizinga and Rydlund, 2004; Arneson and others, 2012). Because the effects of scour can be severe and dangerous, bridges and other structures over waterways are routinely assessed and inspected. Scour processes can be exacerbated during high-flow conditions because velocity and depth increase with increased streamflow. The Missouri Department of Transportation (MoDOT) manages most of the transportation infrastructure within Missouri. A part of their responsibility is fulfilled through
2 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021 periodic inspections of highway structures, including bridges that span waterways. At most of these structures, all or most of the structure can be inspected from land or from personnel lift trucks deployed from the roadway of the structure; however, for structures over primary waterways, such as the Missouri and Mississippi Rivers, inspecting the submerged part of the bridge requires a different approach. The U.S. Geological Survey (USGS), in cooperation with MoDOT, began assessing scour at selected waterway crossings in Missouri in 1988 (Becker, 1994) and at waterway crossings throughout the State in 1991 (Huizinga and Rydlund, 2004). In 2007, the USGS, in cooperation with MoDOT, began monitoring scour at bridges using single-beam echosounders (Rydlund, 2009) and surveying channel bathymetry using a multibeam echosounder mapping system (MBMS; Huizinga and others, 2010; Huizinga, 2012, 2013; also refer to report references listed in table 1). The MBMS is a useful tool not only in surveying channel bathymetry but also in providing a medium- to high-resolution representation of submerged bridge structural elements. In 2010, the first round of periodic surveys at waterway crossings across the Missouri and Mississippi Rivers throughout Missouri began with bridges in the Kansas City, Missouri, area and were followed by bridges in the St. Louis, Mo., area, bridges on the Missouri River between Kansas City and St. Louis, and those on the periphery of Missouri (table 1). During high-flow conditions in June–August 2011, many of the highway bridges and several of the railroad bridges along the length of the Missouri River downstream from Montana were assessed (Densmore and others, 2013; Dietsch and others, 2014), including the 37 highway bridges (at 28 crossings) over the Missouri River in and into Missouri (Huizinga, 2012). These surveys help MoDOT fulfill the need for underwater inspection
of bridges over the Missouri and Mississippi Rivers and provide a valuable snapshot in time of the channel bed elevations and velocities in the area near the bridge crossings, which can be used for developing or modifying tools for predicting bridge scour and other geomorphologic processes. The study detailed in this report covers the surveys at the highway bridges across the Missouri River between Kansas City and St. Louis, Mo. (fig. 1), except for the new bridge over the Missouri River at Washington, Mo. (fig. 1, site number 22), which was under construction at the time of the previous surveys in that area (May 2017) and was surveyed with the St. Louis area bridges in August 2020 (tables 1 and 2). Therefore, this study details surveys at nine bridges at eight crossings (table 2).
Purpose and Scope The purpose of this report is to describe the equipment and methods used and to document results of bathymetric and velocimetric surveys completed on May 19–26, 2021, of the Missouri River channel near nine highway bridges at eight crossings between Kansas City and St. Louis, Mo. (fig. 1; table 2). The results obtained from the bathymetric and velocimetric surveys of the channels document the channel-bed geometry and velocity distribution at the time of the surveys and provide characteristics of scour holes that may be useful in developing or modifying predictive guidelines or equations for computing potential scour depth. These data also may be used by MoDOT as a low to moderate flood-flow comparison to help assess the bridges for stability and integrity issues with respect to bridge scour. Results are also compared to previous surveys at the sites (Huizinga, 2012, 2014, 2020a).
Table 1. Routine periodic surveys of bridges crossing the Missouri and Mississippi Rivers in and into Missouri. Dates of routine surveys
Report references
Data references
Special notes
Kansas City area March 2010
Huizinga (2010)
Huizinga (2020b)
Excluded L0734, A7650 not yet built.
June 2015
Huizinga (2016)
Huizinga (2020b)
Excluded K0456/A0450.
August 2019
Huizinga (2022a)
Huizinga (2021)
None.
St. Louis area October 2010
Huizinga (2011)
Huizinga (2017b)
A6500 not yet built.
May 2016
Huizinga (2017a)
Huizinga (2017b)
None.
August 2020
Huizinga (2023)
Huizinga (2022b)
Included new bridges A8141 at Washington and A8504 at Louisiana, Mo.
April–May 2013
Huizinga (2014)
Huizinga (2020c)
None.
May 2017
Huizinga (2020a)
Huizinga (2020c)
Excluded K0969, included A8340 in Kansas City.
Mid-Missouri
Periphery of Missouri June 2014
Huizinga (2015)
Huizinga (2020d)
None.
July–August 2018
Huizinga (2020e)
Huizinga (2020d)
Excluded K0932.
Introduction 3 95°
94°
93°
92°
91°
90°
89°
IOWA
A
SK 40°
Kirksville
Forest Lake
Rulo
Bayview Quincy Memorial
2 Atchison Leavenworth
Area A 4 (shown below) 5 71112 13 6
39°
31
Hannibal
St. Joseph
3
15
14 Lexington
8 910
16 Miami
Waverly 06895500
17
ILLINOIS
Glasgow 06906500
18
19
Boonville 06909000
Greater Kansas City area
Rocheport
38°
06934500
Osage Beach
Area B (shown below)
26
27 25 24 33
23
ri River 21 sou 20 Mis Hermann Jefferson City 06910450
Lake of the Ozarks
32
Louisiana
22
34 35
Washington Greater St. Louis area
Mi
ssi
ssi
pp
i
36
Chester
Ri
ve
r
io
37
R
Oh
Cape Girardeau
KANSAS
37°
KENTUCKY iver
A BR NE
1
Brownville
Cairo
OKLAHOMA
MISSOURI
ES
SE
E
ARKANSAS
TE
N
N
38
Caruthersville
36° Base from U.S. Geological Survey 1:100,000 Scale Digital Data, 1993 Universal Transverse Mercator projection, Zone 15 North Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83)
20 20
40
40
60
60 80
13
11 12
6
Greater Kansas City area
MISSOURI
KANSAS
10 8 9
0 0
5 5
14 06895500
Highway bridge location—Surveyed in this study U.S. Geological Survey streamgage and identifier
10 MILES 10 KILOMETERS
ip p M
i
Mi sso u
7
Highway bridge location—Numbering on the Missouri River from 2011 flood study (Huizinga, 2012); numbering on the Mississippi River based on sequencing of bridges maintained by Missouri Department of Transportation
Clark
27
ri 26
Chain of Rocks
25 23
B
er Riv
ss
1
5
100 MILES
er
is s
EXPLANATION
80
100 KILOMETERS
Riv
i
A
0 0
24 McKinley Martin Luther King
Greater St. Louis area
Eads
33 34
IS
IL
M
Figure 1. Location of highway bridges crossing the Missouri and Mississippi Rivers in and into Missouri, and bathymetric surveys of the Missouri River channel, May 19–26, 2021.
SO UR LI I NO IS
35
0 0
5 5
10 MILES 10 KILOMETERS
[Bridges are listed in downstream order. MO, State highway; --, not applicable; US, U.S. highway; IS, Interstate highway; S, southbound; N, northbound]
Site number (fig. 1)
Structure number
Local name
County, State
Route
River milea
Surveyed as part of this study
Remarks
Figures
14
A5664
Lexington
Ray, Mo.
MO 13
314.9
Yes
--
1, 6, 7, 8, 9, 10, 11, 1.1
15
A5910
Waverly
Lafayette, Mo.
US 24
293.2
Yes
--
1, 12, 13, 14, 15, 16, 17,18, 1.2
16
K0999
Miami
Carroll, Mo.
MO 41
262.6
Yes
--
1, 19, 20, 21, 22, 23, 24, 25, 1.3
17
G0069
Glasgow
Saline, Mo.
MO 240
226.3
Yes
--
1, 5, 26, 27, 28, 29, 30, 31, 32, 1.4
18
A4574
Boonville
Cooper, Mo.
MO 5
196.6
Yes
--
1, 33, 34, 35, 36, 37, 38, 39, 1.5
19
L0962
Rocheport
Boone, Mo.
IS 70
185.1
Yes
--
1, 40, 41, 42, 43, 44, 45, 46, 1.6
20
L0550
Jefferson City
Callaway, Mo.
US 54 S
143.9
Yes
Dual bridge crossing with A4497
Cole, Mo.
US 54 N
Yes
Dual bridge crossing with L0550
A4497
1, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 1.7
21
A6288
Hermann
Montgomery, Mo.
MO 19
97.9
Yes
--
22
K0969/ A8141
Washington
Franklin, Mo.
MO 47
67.6
No
Replaced in 2018, surveyed 1 in 2020
aRiver mile on the Missouri River is the distance upstream from the confluence of the Missouri River with the Mississippi River at St. Louis, Mo. (fig. 1).
1, 57, 58, 59, 60, 61, 62, 63, 1.8
4 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
Table 2. Highway bridges crossing the Missouri River between Kansas City and St. Louis, Missouri.
Introduction 5
Description of Study Area The study area for this report is the Missouri River between Kansas City and St. Louis, Mo., but excludes the new bridge at Washington, Mo., surveyed in 2020 (Huizinga, 2023; fig. 1). From Kansas City, the Missouri River flows generally eastward to the greater St. Louis area, joining the Mississippi River north of downtown St. Louis, Mo. (fig. 1). All the highway crossings on the Missouri River between Lexington and Hermann, Mo. (sites 14 through 21; nine bridges at eight crossings) were examined as part of this study. The site numbering sequence used in previous studies on the Missouri River (Huizinga, 2012, 2014) is used in this report for consistency and comparability.
Description of Streamflow Conditions Data from the selected streamflow-gaging stations (hereinafter referred to as “streamgages”) on the Missouri River at Waverly, Mo. (USGS station 06895500; hereafter referred to as the “Waverly streamgage”); Missouri River at Glasgow, Mo. (USGS station 06906500); Missouri River at Boonville, Mo. (USGS station 06909000); Missouri River at Jefferson City, Mo. (USGS station 06910450); and Missouri River at Hermann, Mo. (USGS station 06934500; hereinafter referred to as the “Hermann streamgage;” U.S. Geological Survey [USGS], 2023a; fig. 1), indicated the Missouri River was on or between minor to moderate flood rises when the sites on the Missouri River were surveyed on May 19–26, 2021 (fig. 2A); furthermore, this rise happened during generally higher latespring flows (fig. 2B). Streamflow on the Missouri River as measured at the Waverly streamgage was about 74,500 cubic feet per second (ft3/s) during the survey at the U.S. Highway 24 crossing at Waverly on May 20, 2021 (the lowest measured value), whereas streamflow on the Missouri River as measured at the Hermann streamgage was about 148,000 ft3/s during the survey at the Missouri State Highway 19 crossing at Hermann on May 26, 2021 (the highest measured value). The streamflow of 74,500 ft3/s at the Waverly streamgage has a daily exceedance probability of about 24 percent (the probability that the indicated streamflow value would be equaled or exceeded on any given day at that streamgage; USGS, 2023b) and is less than the 90-percent annual exceedance probability (AEP; the probability that the indicated streamflow value would be equaled or exceeded within a period of one year; also known as the 1-year recurrence interval) flood discharge of 93,200 ft3/s (U.S. Army Corps of Engineers [USACE], 2003, plate E–20). The streamflow of 148,000 ft3/s at the Hermann streamgage has a daily exceedance probability of about 15 percent (USGS, 2023c) and is greater than the 90-percent AEP (the 1-year recurrence interval) flood discharge of 134,000 ft3/s but less than the 50-percent AEP (the 2-year recurrence interval) flood discharge of 248,000 ft3/s (USACE, 2003, plate E–20).
Daily exceedance probabilities for the Waverly and Hermann streamgages were computed using daily streamflow from 1957 to 2022 (USGS, 2023b, c). Streamflow conditions during the dates of each survey were in the low to moderate flood-flow regime. In an analysis of real-time scour monitoring data at Jefferson City, Mo., Huizinga (2014) noted that substantial pier scour generally begins soon after the onset of hydrograph rise (substantial rise of 8 feet [ft] or more), although the scour often does not reach maximum depth until the peak stage is reached or sometime thereafter (refer to fig. 35 in Huizinga, 2014). Several peaks were observed earlier in the year (fig. 2B), and streamflow was substantially higher than base flow based on the daily exceedance values despite the lack of peak streamflow conditions during the study. Although the scour conditions captured in this study may not represent the maximum scour potential at the sites, the cumulative information gathered during multiple surveys from 2011 to 2021 remains useful for determining scour for a variety of flow conditions, particularly when combined with, or compared to, a scour scenario captured at high flood-flow conditions.
Description of Equipment and Basic Processing The bathymetry of the Missouri River at each of the bridges was determined using a high-resolution MBMS. The various components of the MBMS used for this study are described in previous studies on the Missouri and Mississippi Rivers in Missouri (refer to report references listed in table 1) and on the Missouri and Yellowstone Rivers in North Dakota (Densmore and others, 2013). MBMS survey methods and data quality checks were similar to these previous studies. A brief description of the equipment follows; a more-complete description of the various system components and methods used in this study are available in the previous reports by Huizinga (2010), Huizinga and others (2010), and Densmore and others (2013). An MBMS is an integration of several individual components: the multibeam echosounder (MBES), a soundvelocity probe, an inertial navigation system (INS), and a data-collection and data-processing computer. The MBES used in this study is the Norbit iWBMSh (fig. 3), operated at a frequency of 400 kilohertz (kHz). The iWBMSh is similar in operation to the MBES systems used in previous studies in the mid-Missouri area, except that it has a curved piezoceramic receiver array, which enables bathymetric data to be collected throughout a swath range of 210 degrees. Optimum data usually are collected in a swath of less than 160 degrees (80 degrees on each side of nadir, or straight down below the MBES); nevertheless, the swath can be electronically rotated to either side of nadir, enabling data collection along sloping banks up to a depth just below the water surface. The sound-velocity probe provides real-time measurements of the speed of sound at the MBES to accurately determine the depth readings of the MBES (Hughes Clarke and others, 1996). The
6 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021 300
A
200
21
16
100
14
90 80
18
20
17 19
15
70
EXPLANATION
Streamflow, in thousand cubic feet per second
60
06895500 Missouri River at Waverly, Missouri 06906500 Missouri River at Glasgow, Missouri
50
06909000 Missouri River at Boonville, Missouri 06910450 Missouri River at Jefferson City, Missouri 06934500 Missouri River at Hermann, Missouri
40
14 Approximate time of survey at indicated site number (fig. 1)
30 5/16
5/17
5/18
5/19
5/20
5/21
5/22
5/23
5/24
6/1
6/16
5/25
5/26
5/27
5/28
5/29
5/30
400
B 300
200
100 90 80 70 60
Date range shown in A above
50 40
30
3/1
3/16
4/1
4/16
5/1
5/16
7/1
7/16
8/1
8/16
9/1
Date
Figure 2. Hourly streamflow at selected streamgages in the study area on the Missouri River between Kansas City and St. Louis, Missouri (U.S. Geological Survey, 2023a). A, May 16–30, 2021. B, March 1–September 1, 2021.
Introduction 7
B
A
T-pole with Global Navigation Satellite System receivers
Sound velocity probe
Inertial measurement unit
Curved piezoceramic receiver array
Piezoceramic projector array
Stabilizer struts
Multibeam echosounder
Figure 3. The multibeam echosounder. Photographs by Richard J. Huizinga, U.S. Geological Survey (USGS). A, Viewed from the side. B, Mounted on the port side of the U.S. Geological Survey boat.
river environment tends to be well mixed, such that the sound velocity at the MBES is sufficiently representative of a soundvelocity profile of the full water column. The Norbit iWBMSh uses the Applanix Position Orientation Solution for Marine Vessels (POS MV) OceanMaster INS system, consisting of an inertial measurement unit (IMU) attached directly to the MBES mount in a “tightly coupled” configuration (fig. 3A) and two Global Navigation Satellite System (GNSS) antennae. The INS provides position in three-dimensional space and measures the attitude of the vessel (pitch, roll, yaw, and heading) to accurately position the data received by the MBES. Real-time kinematic (RTK) differential corrections for the INS came from cellular communication with the MoDOT GNSS real-time network for the navigation and tide solution during the 2021 surveys. Similar to all previous surveys after 2010 (refer to report references listed in table 1), the navigation information from the 2021 surveys was postprocessed using the POSPac Mobile Mapping Suite (MMS) software (version 8.0; Applanix Corporation, 2021) to mitigate the effects of degraded positional accuracy of the vessel while near or under a bridge resulting from GNSS outages. The POSPac MMS software provides tools to identify and compensate for sensor and environmental errors to compute an optimally blended navigation solution from the GNSS and raw IMU data. The blended navigation solution (called a “smoothed best estimate of trajectory” or “SBET” file) generated by postprocessing the navigation data was applied to the survey at a given bridge to minimize the effects of the GNSS outages. Because of advances in technology, surveys
before 2010 do not have an SBET file and are more likely to have artifacts resulting from minor positional variations between surveys. Data from the MBES and INS components were processed and integrated into a cohesive dataset for cleanup and visualization. A computer onboard the survey vessel ran the HYPACK/ HYSWEEP data acquisition software (version 2020; HYPACK, Inc., 2020) that was used to prepare for and do bathymetric surveys. After completing the surveys, the acquired depth data were further processed to remove data spikes and other spurious points in the multibeam swath trace, georeferenced using the navigation and position solution data from the SBET file and visualized in HYPACK/HYSWEEP as a gridded bathymetric surface or a point cloud. Information about the velocity of the river at various points throughout each study reach was collected using an acoustic Doppler current profiler (ADCP), similar to previous studies since 2011 by Huizinga (for example, refer to Huizinga, 2012, 2022a). A Teledyne RD Instruments Rio Grande ADCP operating at 600 kHz was used to obtain velocities at 1.64-ft increments, or “bins,” throughout the water column. The Rio Grande ADCP operates in depths from 2.3 to 230 ft to determine the velocity of water by measuring the Doppler shift of an acoustic signal reflected from various particles suspended in the water (Mueller and others, 2013). By measuring the Doppler shift in four different beam directions, the velocity of the water in each bin can be determined in three dimensions. The depth-averaged velocities from the two traverses of a given section line were computed using averaging algorithms from the Velocity Mapping Toolbox (version 4.09; Parsons and others, 2013).
8 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
Basic Description of Methods The methods used to acquire and ensure the collection of quality data were the same as those used in previous studies using the MBES (methods are detailed in Huizinga and others, 2010; Huizinga, 2010, 2012). A brief summary of—and any differences from—these methods are highlighted below.
Surveying Methods Generally, the surveyed area extended across the active channel from bank to bank, just like the previous studies on the Missouri and Mississippi Rivers (Huizinga and others, 2010; Huizinga, 2012; also refer to references listed in table 1). The survey extent ranged from 1,550 to 1,840 ft long in the longitudinal (streamwise) direction and was positioned so that the surveyed highway bridges were about one-third to one-half of the total length from the upstream extent, generally using the same upstream and downstream extents as were used in the 2011 flood study (Huizinga, 2012). The upstream and downstream boundaries of the surveyed areas were assumed to capture all the substantial hydraulic effects (wake vortices and shear flow) of the bridge structures. Like in previous studies, bathymetric data were obtained along longitudinal transect lines, and each survey was designed such that the survey swaths overlapped to attempt to ensure complete coverage of the channel bed and minimize sonic “shadows” (Huizinga and others, 2010). Many of the surveyed swaths had substantial overlap, except in shallow areas near the channel banks or spur dikes and near in-flow structures or debris rafts. Areas near bridge piers and along the banks also were surveyed in an upstream direction with the MBES swath electronically tilted to port or starboard to increase the acquisition of bathymetric data higher on the banks and sides of the piers. The electronically tilted swath generally was 120 to 160 degrees wide, extending from 10 degrees above horizontal on the bank-ward or pier-ward side of the survey vessel, and 20 to 60 degrees past nadir below the vessel. After completing the bathymetric survey at a given site, velocity data were obtained with the ADCP on seven transections spanning the channel within the study area. The position and speed of the boat was determined using a differential GNSS receiver mounted on a pole directly above the ADCP. The bottom-track reference method for determining boat speed was anticipated to be unusable because of moving channelbed material, so the boat velocity was determined using the GNSS essential fix data string (the NMEA–0183 GGA string [shorthand for the $GPGGA standard output format for GNSS essential fix data defined by the National Marine Electronics Association 0183 standard that includes information on the three-dimensional location and accuracy of the GNSS receiver; National Marine Electronics Association, 2002]) from the differential GNSS receiver. The distance between the velocity section lines generally was about 260 ft. Three sections were upstream, and four sections were downstream from
the bridge being surveyed. Each section line was traversed in each direction across the river, and the reported velocity values were the average from the two traverses of a given section line. Streamflow for a site was computed as the average of the streamflows from reciprocal pairs (two transects per section line) at the various sections in the reach. Generally, measured streamflow for an individual transect was within 5 percent of the average.
Survey Quality-Assurance Measures For the MBMS, the principal quality-assurance measures were assessed in real time during the survey. The MBMS operator assessed the quality of the collected data in real time by making visual observations of cross-track swath shape (such as convex, concave, or skewed bed returns in flat, smooth bottoms), noting data-quality flags and alarms from the MBES and the INS, and noting comparisons between adjacent overlapping swaths. In addition to the real-time quality-assurance assessments, beam angle checks and a suite of patch tests were done to ensure quality data were acquired from the MBMS for the 2021 surveys. An initial patch test was completed on May 5, 2021, at Forest Lake near Kirksville, Mo. (fig. 1). The beam angle check and an additional patch test were completed at Lake of the Ozarks near Osage Beach, Mo. (fig. 1) on November 18, 2021. The results of the beam angle check (table 3) were within the recommended performance standards used by the USACE for hydrographic surveys for all the representative angles below 70 degrees (USACE, 2013). Points acquired outside of the central 100–110 degrees of the swath generally had overlap with adjacent swaths, which increases the quality of the survey in the overlapped areas because of duplication. Patch tests are a series of dynamic calibration tests that are used to check for subtle variations in the orientation and timing of the MBES with respect to the INS and real-world coordinates (Huizinga, 2023), and primarily are used to determine angular offsets to roll, pitch, and yaw caused by the alignment of the transducer head relative to the INS (fig. 4). These offsets have been observed to be essentially constant for a given equipment configuration and survey season, barring an event that causes the mount to change such as striking a floating or submerged object (refer to report references listed in table 1; Huizinga and others, 2023; Rivers and others, 2023). Although the MBES had several minor strikes of floating or submerged debris at various times during the 2021 survey season, no changes to the roll or pitch angles were apparent from the beginning to the end of the river surveys in May (table 4). The tightly coupled configuration of the Norbit iWBMSh, wherein the IMU of the INS is mounted on the same mounting bracket as the MBES (fig. 3A) results in no measured timing offset and no measured angular offset for pitch (table 4). The yaw is a measure of the alignment of the GNSS receivers relative to the IMU of the INS on the echosounder head, and the measured offset for yaw changed
Introduction 9 Table 3. Results of a beam angle check from two check lines over a reference surface at Lake of the Ozarks near Osage Beach, Missouri, on November 18, 2021. [<, less than; --, no data]
Beam angle limit, in degrees
Maximum outlier, in feet
Mean difference, in feet
Standard deviation, in feet
95-percent confidence, in feet
0
0.24
−0.09
0.04
0.07
5
0.28
−0.09
0.03
0.07
10
0.23
−0.08
0.04
0.07
15
0.22
−0.08
0.04
0.07
20
0.23
−0.08
0.04
0.08
25
0.23
−0.07
0.04
0.08
30
0.27
−0.07
0.04
0.08
35
0.27
−0.07
0.05
0.09
40
0.23
−0.05
0.04
0.08
45
0.21
−0.04
0.04
0.09
50
0.22
−0.04
0.05
0.09
55
0.23
−0.03
0.05
0.10
60
0.21
−0.01
0.05
0.10
65
0.25
0.02
0.06
0.12
70
0.30
0.03
0.06
0.12
Performance standards1 Threshold
1.00
<0.20
--
<0.80
Result
Met
Met
--
Met
1Performance standard check values are from U.S. Army Corps of Engineers (2013, table 3-1) for soft sand/silt bottoms.
from –2.5 to –1.5 between the two patch tests (table 4). The variable angular offset for yaw observed in the 2021 surveys is believed to be the result of a combination of a loose connection on the T-pole on which the GNSS receivers were mounted (fig. 3B) and an incorrectly applied magnetic variation or grid convergence parameter in the post-processing of the survey data (Rivers and others, 2023). The measured angular offset for roll remained a constant −0.10 (table 4), which is different from previous results for this equipment configuration in other recent surveys (Huizinga, 2022a; Huizinga and others, 2023); however, the MBES had undergone calibration testing in January 2021, which is the likely source of the change. Furthermore, the roll offset of −0.10 is consistent with other data collected since the calibration testing in 2021 (Rivers and others, 2023). It was noted in the earliest work with the MBMS in Missouri (Huizinga, 2010) that a sensitivity analysis of the four offsets indicated that the ultimate position of surveyed points in three-dimensional space was least sensitive to the angular offset for yaw, whereas it was most sensitive to the angular offset for roll. Processing all the data for the bridge surveys detailed in this report with an angular offset of roll of
–0.10 degree, no angular offset for pitch, and an angular offset for yaw of –2.0 degrees generally yielded good results with no noticeable artifacts caused by incorrect offsets. Angular offsets were applied to the bathymetric data before removing data spikes and other spurious points in the multibeam swaths through the use of automatic filters and manual editing. The bathymetric data were then projected to a three-dimensional grid at a resolution of 1.64 ft using the Combined Uncertainty and Bathymetry Estimator (CUBE) method (Calder and Mayer, 2003), as implemented in the MBMax processing package of the HYPACK/HYSWEEP software (HYPACK, Inc., 2020) and used to generate a gridded raster surface of the channel bed (and associated uncertainty) near each bridge (hereinafter referred to as a “bathymetric surface”) using ArcMap (version 10.8.1; Esri, 2022). A quality-assurance plan has been established for streamflow and velocity measurements using ADCPs that includes several instrument diagnostics checks and calibrations. These standard operating procedures were followed when acquiring the velocity profile data for these surveys. For a detailed description of these procedures, refer to Mueller and others (2013).
10 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
A. Latency
B. Roll
∆t
α
α
C. Pitch
D. Yaw Object or feature of interest
β
δ
δ
β
EXPLANATION Actual bottom Measured bottom ∆t Timing offset for latency between the multibeam echosounder and Global Navigation Satellite System components of the inertial navigation system α Angular offset for roll of the transducer head along the longitudinal axis of the boat β Angular offset for pitch of the transducer head along the lateral axis of the boat δ Angular offset for yaw of the transducer head about the vertical axis
Figure 4. Generalized effects on data from a multibeam echosounder (from Huizinga, 2022a). A, Timing offset for latency. B, Angular offset for roll. C, Angular offset for pitch. D, Angular offset for yaw. Table 4. Patch test results at two locations on May 4 and November 18, 2021. Timing offset, in seconds
Angular offset for roll, in degrees
Angular offset for pitch, in degrees
Angular offset for yaw, in degrees
05/04/2021
0
−0.10
0.00
−2.50
Forest Lake near Kirksville, Missouri
11/18/2021
0
−0.10
0.00
−1.50
Lake of the Ozarks near Osage Beach, Missouri
Date of test
Uncertainty Estimation Similar to recent bathymetry studies in Missouri (refer to report references listed in table 1; Huizinga and others, 2023; Rivers and others, 2023), uncertainty in each survey was estimated by computing the uncertainty for each survey-grid cell in the bathymetric surface of the survey area using the CUBE method (Calder and Mayer, 2003). The gridded uncertainty is a measure of the variability of the individual points in the cell used to determine the CUBE-derived elevation for the cell. Statistics of gridded uncertainty for each of the survey areas are shown in table 5. An example of the spatial distribution of gridded uncertainty typically observed in the survey data at
Location (fig. 1)
structure G0069 on State Highway 240 is shown in figure 5. The uncertainty data were output and combined with the threedimensional bathymetry data and are included with metadata in the USGS data release associated with this study (Huizinga and Rivers, 2023). More than 99 percent of the uncertainty values at all the sites were less than 0.50 ft (table 5), which is within the specifications for a “Special Order” survey, the second-moststringent survey standard of the International Hydrographic Organization (IHO; International Hydrographic Organization, 2020). More than 97 percent of the uncertainty values were less than 0.25 ft, and more than 82 percent of the uncertainty values were less than 0.10 ft at all the sites (table 5). The
Introduction 11 Table 5. Total gridded uncertainty results for bathymetric data at a 1.64-foot grid spacing from surveys on the Missouri River between Kansas City and St. Louis, Missouri, May 19–26, 2021. [Data are summarized from Huizinga and Rivers (2023)]
Site number (fig. 1)
Percentage of bathymetry points with uncertainty value less than a given threshold
Uncertainty, in feet Structure number Maximum
Mean
Median
Standard deviation
1.00 foot
0.50 foot
0.25 foot
0.10 foot
14
A5664
2.89
0.07
0.07
0.08
99.9
99.2
97.5
91.6
15
A5910
3.25
0.07
0.07
0.07
99.9
99.5
98.2
91.1
16
K0999
3.02
0.07
0.07
0.07
99.9
99.5
97.8
90.4
17
G0069
3.25
0.09
0.10
0.06
100.0
99.7
98.5
83.3
18
A4574
3.25
0.08
0.07
0.06
99.9
99.6
98.6
87.6
19
L0962
3.18
0.09
0.07
0.08
99.9
99.3
97.2
83.6
20
L0550/A4497
1.12
0.08
0.07
0.04
100.0
100.0
99.6
91.5
21
A6288
1.44
0.09
0.07
0.05
100.0
99.9
99.0
82.2
tops of bridge substructural elements (pier footings and seal courses) typically had uncertainty values of less than 0.10 ft. Similar to previous surveys with this type of equipment (refer to, for example, Huizinga, 2012, 2016), the uncertainty values were larger near moderate-relief features (banks, spur dikes, rock riprap and outcrops, and scour holes near piers). The largest uncertainty in this group of surveys was 3.25 ft (table 5); however, as noted in previous studies, uncertainty values of this magnitude typically happened near high-relief features, such as the front or side of a pier footing. Occasionally, the uncertainty values also were larger (1.00 ft or greater) in the outermost beams of the multibeam swath where overlap existed with an adjacent swath, particularly when the MBES head was electronically tilted for the survey lines along the banks or near the piers. Overlapping adjacent swaths in the channel thalweg (the line of maximum depth in the channel) also can display larger uncertainty values because substantial bed movement can happen between survey passes (fig. 5). The uncertainty of the gridded data computed using the CUBE method has been decreasing with time compared to previous surveys (refer to table 4 in Huizinga, 2012, 2014, 2020a). The decrease in uncertainty primarily is the result of improvements in data-collection equipment and methods. The
tightly coupled configuration of the Norbit iWBMSh used in these surveys decreases some of the uncertainty by substantially reducing the lever arm length (and therefore the potential movement) between the MBES and IMU. The ability to electronically tilt the swath substantially reduces the time between when unrotated, down-looking data and rotated, side-looking data are collected, which reduces the uncertainty of the data in the swath overlap zone that might otherwise experience more substantial bed movement. The survey at structure G0069 on Missouri State Highway 240 at Glasgow had the highest maximum value (3.25 ft) and the highest median value (0.10 ft) of gridded uncertainty, as well as a lower percentage of bathymetry points with a gridded uncertainty of less than the various thresholds (table 5). The survey at this site was obtained with relatively smooth longitudinal swaths (fig. 5), which was the case at nearly all the sites surveyed in this study. The primary anomalies at this site were observed along the banks and near the piers, where the MBES was used in an electronically tilted configuration to extend the potential coverage in these areas, resulting in higher uncertainty values. Generally, the magnitude and distribution of uncertainty observed at this site are representative of those observed at all the sites.
Pier 1 Rock outcrop
Rock outcrop
Rock outcrop
Sto
ne
rev
etm
ent
Bo
at r
am
"
92°50'55
Railroad bridge pier
FLOW
Pier 2
Base of old railroad bridge pier
"
$
92°51'00
Railroad bridge pier
Pier 3
Spur dike
Spur dike
Base of old railroad bridge pier
Pier 4 Railroad bridge pier
"
92°51'05
p
Survey date May 20, 2021 Streamflow 102,000 cubic feet per second Average water-surface elevation 608.8 feet above the NAVD 88 Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
0 0
50
100 150 200 250 FEET 25
50
75 METERS
Figure 5. Uncertainty of gridded bathymetric data from the Mississippi River channel near structure G0069 on Missouri State Highway 240 at Glasgow, Missouri.
12 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
'10"
'15"
39°13
39°13
'20"
'25"
39°13
39°13
EXPLANATION Uncertainty of channel-bed elevation, in feet >1.0 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0
Results of Bathymetric and Velocimetric Surveys 13
Results of Bathymetric and Velocimetric Surveys The site-specific results for each bridge are discussed in the following sections, starting with the upstream-most bridge and progressing downstream on the Missouri River. The range of bed elevations, described as “the channel-bed elevations,” for each survey was based on statistical analyses of the bathymetric surface at each site and covers the 5th to 95th percentile range of the data. Because the surveys generally were limited to the active channel from bank-to-bank excluding overbank areas, this percentile range generally covered the channel bed but excluded the banks and localized high or low spots, such as spur dikes or scour holes near piers or spur dikes. All elevation data were referenced to the North American Vertical Datum of 1988 (NAVD 88). For consistency with earlier studies, dune sizes are described in general terms for each of the bridge sites using the categories set by Huizinga (2012) for the discussion of bathymetry during the 2011 flood. In this report, small dunes and ripples are those that are less than 5 ft high from crest to trough, medium dunes are those that are 5 to 10 ft high, large dunes are those that are 10 to 15 ft high, and very large dunes are those that are 15 ft or more in height. All the bridge sites in this study were previously surveyed (Huizinga, 2012, 2014, 2020a), and bathymetry data from earlier surveys at all eight crossings are included with metadata in Huizinga (2020c). A map showing the difference in channel-bed elevation for the area common to the comparison surveys is included for each site, and data from previous surveys are included in the cross-section plot for that bridge. The difference maps were created using the Geomorphic Change Detection (GCD; version 7) add-in tool for ArcGIS available through the Riverscapes Consortium (2022). The GCD program computes elevation difference and volumetric change in storage between two gridded raster surfaces (each as a digital elevation model [DEM] of the surface) derived from repeat topographic or bathymetric surveys. The GCD program provides a suite of tools to associate the uncertainties for points in the various surveys (using the uncertainty values associated with each point, or an average uncertainty of the survey when point-specific uncertainty data were not available [survey data from 2011 or before]) and propagates those uncertainties through the DEM of difference (DoD) map. The GCD program also provides a way to segregate the best estimates of change using threshold masks. A threshold mask of 95-percent confidence was used for comparisons in the current
study, and summary statistics (maximum, minimum, and average) of the DoD maps were determined. Sediment volumes for cut (scour) and fill (deposition) between the 2021 survey and any previous surveys between 2011 and 2017 also were determined. The surveys are broadly compared based on their timing and the streamflow at the time of the survey. Additionally, shaded triangulated irregular network (TIN) images of the channel and side of pier were prepared for each surveyed pier. These visualizations are shown in figures 1.1 to 1.8. Although the configuration of the channel bed and the underlying sediment transport conditions at a site are associated with an instantaneous streamflow in the discussions that follow, a given bathymetric surface actually reflects more than those instantaneous transport conditions. A wide variety of factors affect the channel-bed configuration of a reach for a specific streamflow, including magnitude of flow velocities and velocity distribution; the number, size, and timing of previous flood rises; whether the stage currently is rising or falling; and other local hydraulic conditions (Gilbert and Murphy, 1914; Simons and Richardson, 1966). Furthermore, the channel-bed configuration at a site is affected by upstream and local sediment conditions (size and spatial distribution) and contributions, as well as water temperature and other seasonal variations (Simon, Li and Associates, 1985). Because of the myriad number and interactions between factors affecting sediment transport conditions and the resulting bed conditions, it was assumed that the configuration and size of bed forms observed during the current (2021) surveys in the mid-Missouri area depended on more than the instantaneous streamflow at a given site. Although it is beyond the scope of the current (2021) study to examine all the antecedent conditions that created the observed channel-bed configuration, the comparisons with previous surveys under different streamflow conditions nevertheless contributes to understanding the many complexities of sediment transport and resulting channel-bed net conditions. As in recent previous studies (refer to report references listed in table 1), when discussing the vertically averaged velocity values obtained during the surveys in the sections that follow, neighboring vectors having random variations in direction and magnitude were taken as an indication of nonuniform flow in the section resulting from shear and wake vortices. Conversely, neighboring vectors having gradual and systematic variations were assumed to indicate uniform flow in the section. The Missouri River is highly turbulent even in the absence of structures that generate strong shear or wakes, but in the interest of conciseness, nonuniform flow is loosely described as “turbulent” in the following sections.
14 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
Structure A5664 on State Highway 13 at Lexington, Missouri Structure A5664 (site 14; table 2) on State Highway 13 crosses the Missouri River at river mile (RM) 314.9 at Lexington, Mo., east of and downstream from Kansas City, Mo. (fig. 1). The site was surveyed on May 19, 2021, and the average water-surface elevation of the river in the survey area, determined by the RTK GNSS tide solution, was 681.3 ft (table 6; fig. 6). Streamflow on the Missouri River was about 82,200 ft3/s, as determined from the rated streamflow measured at Waverly (streamgage 06895500) 6 hours after the survey (table 6, especially note “e”). Velocity data were not collected at this site owing to a faulty ADCP unit. The survey area was about 1,640 ft long and about 1,000 ft wide, extending across the active channel from bank to bank (fig. 6). The survey area extended about 670 ft upstream from the centerline of structure A5664, and piers 21 and 22 were in the water and away from the banks (fig. 6). The channel-bed elevations ranged from about 653 to 668 ft for most of the surveyed area (5th to 95th percentile range of the bathymetric data; fig. 7), except near the spur dikes on the right (south) bank (fig. 6; table 6). The channel bed between the left (north) bank and the spur dikes was filled with medium dune features, and small dunes and ripples were present in the area between the spur dikes on the right (south) side of the channel (fig. 6). Localized scour holes were present downstream from and off the ends of the spur dikes on the right (south) side (fig. 6). As in previous surveys (Huizinga, 2012, 2014, 2022a), stone revetment was present on the left (north) bank throughout the reach, and spur dikes were present on the right (south) bank (fig. 6). The minor scour holes near main channel piers 21 and 22 were difficult to discern from nearby dunes and ripples (figs. 6 and 1.1). Information from bridge plans indicates that piers 21 and 22 are founded on shafts drilled 28 to 50 ft into bedrock, having about 52 ft of bed material between the channel bottom and bedrock at pier 21 and about 27 ft of material at pier 22 (fig. 8; difference between “Approximate minimum elevation in scour hole near pier/bent” and “Approximate elevation of bedrock near pier/bent” in table 7). The surveyed bed generally was similar to the previous multibeam surveys in 2013 and 2017, except on the left side of pier 21 (fig. 8). The scour hole near pier 21 appears to penetrate to the top of the pier footing (figs. 6, 8, 1.1A, 1.1B), which might provide some mitigation to the scour hole at this pier as the downward flow of the horseshoe vortex at the pier column face is blunted by the footing (Arneson and others, 2012). The computed difference between the survey DEMs with a probabilistic threshold mask of 95-percent confidence based on uncertainty (hereinafter referred to simply as “the difference”) from the survey on May 19, 2021, and the previous survey on May 23, 2017 (fig. 9), indicates about 92 percent of the joint area of interest had change greater than the 95-percent confidence interval of uncertainty (hereinafter referred to as “detectable change”), which means about 8 percent of
the differences in the joint area of interest are equivocal and within the 95-percent confidence bounds of uncertainty of detectable change (hereinafter referred to as “within the bounds of uncertainty”; table 8). Bed variation seemed about equal between scour and deposition in most of the channel from 2017 to 2021 in the DoD (fig. 9); however, deposition is dominant in the thalweg along the left (north) bank throughout the reach, whereas substantial scour is apparent downstream from the spur dikes on the right (south) bank (fig. 9). The average difference between the bathymetric surfaces (the statistical mean value of the gridded raster surface [fig. 9] created from the thresholded difference between the 2021 and 2017 gridded raster bathymetric surfaces) was –0.52 ft (table 8), indicating minor to moderate channel degradation between the 2017 and 2021 surveys. The net volume of cut in the reach from 2017 to 2021 was about 89,700 cubic yards (yd3), and the net volume of fill was about 61,200 yd3, resulting in a net loss of about 28,500 yd3 of sediment between 2017 and 2021 (table 8). The cross sections from the two surveys along the upstream face of the bridge are not substantially different from one another for most of the section, except on the left side of pier 21 where the 2017 section is 5 to 10 ft lower than the 2021 section (fig. 8). The frequency distribution of bed elevations in 2021 also was similar to 2017 (fig. 7). The stone revetement on the left (north) bank showed areas of minor scour and deposition, and the spur dike on the right (south) bank downstream from the bridge showed minor erosion on one side and deposition on the other (fig. 9); however, deposition or scour apparent on opposing faces of a feature likely results from minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section). The difference between the survey on May 19, 2021, and the survey on Aril 24, 2013, (fig. 10), indicates about 61 percent of the joint area of interest had detectable change, which means about 39 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Scour and deposition are roughly balanced throughout most of the reach between 2013 and 2021 in the DoD, except along the right (south) bank, particularly downstream from the spur dikes (fig. 10). The average difference between the bathymetric surfaces was –1.14 ft (table 8), indicating moderate channel degradation between the 2013 and 2021 surveys. However, the net loss of sediment between 2013 and 2021 was about 32,100 yd3, which is similar to the net loss of sediment between 2017 and 2021 (table 8). The cross-section from the 2021 survey along is very similar to the 2013 section (fig. 8), and the frequency distribution of bed elevations in 2021appears very similar to 2013 (fig. 7). The stone revetment on the left (north) bank is within the bounds of uncertainty (fig. 10). A substantial part of the channel on the right (south) side was not surveyed in 2013 because of generally lower flows (table 8) and shallow depths in that area. As with the previous DoD, deposition or scour apparent on opposing faces of a feature (such as a pier or spur dike) likely results from minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section).
Table 6. Bridge and survey information, and selected channel-bed elevations from surveys on the Missouri River between Kansas City and St. Louis, Missouri, August 19–26, 2021. [Data are summarized from Huizinga and Rivers (2023). Sites are shown on figure 1. Dates are given in month/day/year. All elevations are in feet above the North American Vertical Datum of 1988. ADCP, acoustic Doppler current profiler; MO, State highway; US, U.S. highway; IS, Interstate highway]
Site number (fig. 1) 14
Structure number
A5664
Survey date 05/19/21
Route
MO 13
River milea
Streamflow from ADCP measurements,b in cubic feet per second
Average water-surface elevation near the bridge, in feet
Average channel-bed elevation,c in feet
5th percentile
95th percentile
Approximate local minimum channel elevation,d in feet
314.9
82,200e
681.3
660.2
652.8
668.1
637
Approximate elevation of the indicated percentile of the bathymetric data, in feet
15
A5910
05/20/21
US 24
293.2
75,500
661.7
642.4
634.9
651.7
618
16
K0999
05/20/21
MO 41
262.6
79,800
634.5
618.4
607.0
626.4
595
17
G0069
05/20/21
MO 240
226.3
102,000
605.1
582.9
575.4
592.7
562
18
A4574
05/21/21
MO 5
196.6
112,000
580.9
561.3
554.7
566.8
548f
19
L0962
05/21/21
IS 70
185.1
110,000
571.1
549.0
541.1
559.2
515
20
L0550/A4497
05/26/21
US 54
143.9
95,700
534.2
511.3
504.3
520.9
499
21
A6288
05/26/21
MO 19
97.9
132,000
497.7
472.1
462.8
484.1
442
aRiver mile is the distance upstream on the Lower Missouri River, starting at the confluence with the Mississippi River at St. Louis, Mo. (fig. 1), at river mile 195.2 of the Upper Mississippi River. bThe average streamflow obtained while making the various velocity transects. The reported value is the streamflow computed using Global Navigation Satellite System (GNSS) essential fix data string as the reference, as described in the “Surveying Methods” section of the text. cThe statistical average of the gridded raster surface of channel-bed elevations.
eVelocity data were not collected at this site owing to a faulty ADCP unit. Streamflow value is from the streamgage at Waverly (streamgage 06895500) 6 hours after the time of the survey to account for the time of travel between Lexington and Waverly. fThe minimum channel-bed elevation is in a scour hole near a substructural element at this site.
Results of Bathymetric and Velocimetric Surveys 15
dThe minimum channel-bed elevation of the gridded raster surface, not necessarily in any scour holes near the bridge.
0"
93° 51'4 0"
12'4
93° 51'4 5"
39°
93° 51'5 0"
93° 52'0 0"
93° 51'5 5"
16 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
39°
12'4
5"
A 39°
12'3
5"
EXPLANATION
Stone revetment
Channel-bed elevation, in feet above the North American Vertical Datum of 1988
Stone revetment
685 680
93° 52'0 0"
675 670 665 660 655 Pier 21
FLOW
650 645
39°
12'3
640
0"
Scour hole
635
Scour hole
e Spu
r dik
Pier 22
Spur dik
e (upstr
eam fro
m surve
y area)
Spur dike
$
Cross section shown A' in figure 8
0
50
100 25
Figure 6. Bathymetric survey of the Missouri River channel near structure A5664 on State Highway 13 at Lexington, Missouri.
150 50
200
250 FEET 75 METERS
51'3
0
93°
Base from National Agriculture Imagery Program, 2020 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
5"
93°
51'5
5"
Survey date May 19, 2021 Streamflow 82,200 cubic feet per second Average water-surface elevation 681.3 feet above NAVD 88
20
100
18
90
16
80
14
70
12
60
10
50
8
40
6
30
4
20
2
10
0 640
645
650
655
660
665
670
675
680
685
0 690
Cumulative percentage of survey-grid cells lower than indicated elevation
Percentage of total survey-grid cells
Results of Bathymetric and Velocimetric Surveys 17
Elevation, in feet above the North American Vertical Datum of 1988 EXPLANATION
[ft3/s, cubic foot per second] Cumulative percentage
Frequency distribution 2021 survey data; 82,200 ft 3/s
2021 survey data; 82,200 ft 3/s
3
2017 survey data; 160,000 ft /s
2017 survey data; 160,000 ft 3/s
2013 survey data; 41,100 ft3/s
2013 survey data; 41,100 ft3/s
2011 survey data; 211,000 ft3/s
2011 survey data; 211,000 ft3/s
Figure 7. Frequency distribution of bed elevations for bathymetric survey-grid cells in 1-foot elevation bins on the Missouri River near structure A5664 on State Highway 13 at Lexington, Missouri, on May 19, 2021, compared to previous surveys in 2011, 2013, and 2017 (Huizinga, 2012, 2014, and 2020a, respectively).
The difference between the survey on May 19, 2021, and the earliest survey during flooding on July 20, 2011 (fig. 11), indicates about 88 percent of the joint area of interest had detectable change, which means about 12 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Deposition is dominant throughout most of the reach between 2011 and 2021 in the DoD, except along the right (south) bank, and near the spur dikes near the right bank (fig. 11). The average difference between the bathymetric surfaces was +3.22 ft (table 8), indicating substantial channel aggradation between the 2011 and 2021 surveys. The net gain of sediment in the reach between 2011 and 2021 was about 167,600 yd3, which is the secondlargest net gain shown in table 8. The cross section from the
2011 survey along the upstream face of the bridge varies from 5 to 15 ft below the other survey sections, except near the banks (fig. 8). The frequency distribution of bed elevations in 2011 is unique compared to the other distributions at this site, with a substantially higher percentage of cells at lower channel-bed elevations (fig. 7). The stone revetment on the left (north) bank showed signs of localized substantial deposition, whereas the spur dikes on the right (south) bank showed minor scour (fig. 11). As with the previous DoD, deposition or scour apparent on opposing faces of a feature (such as a pier or spur dike) likely results from minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section).
[Data are summarized from Huizinga and Rivers (2023). Sites are shown on figure 1. All elevations are in feet above the North American Vertical Datum of 1988. MoDOT, Missouri Department of Transportation; --, not known/applicable]
Foundation Information Site number (fig. 1)
Structure number
14
A5664
15
A5910
16
K0999
17
18
19
20 21
G0069
A4574
L0962
MoDOT pier/bent number
Approximate Approximate minimum elevation of elevation in scour hole at scour hole upstream pier/ near pier/bent,a bent face, in feet in feet
Approximate elevation of bedrock near pier/bent, in feet
Approximate distance between bottom of scour hole and bedrock, in feet
Depth of scour hole from average upstream channel bed, in feet
Type
Width, in feet
Penetration into bedrock, in feet
Bottom of seal course elevation, in feet
21
Drilled shaft
49.2
28
631.55
656
656
604
52
4
22
Drilled shaft
31.2
50
634.83
659
659
632
27
4
10
Drilled shaft
32
30
628.00
646
648
605
41
2
11
Drilled shaft
32
42
614.00
635
635
600
35
5
6
Caisson
16.5
0
--
617
617
574
43
9
5
Caisson
16.5
0
--
597
597
588
9
20
4
Footing
12
6
--
623
623
620
3
0
2
Footing
19.5
1
--
576
579
576
0b
4b
3
Caisson
19.5
1
--
566
566
562
4
12b
4
Caisson
19.5
1
--
579
579
557
22
9b
8
Drilled shaft
32
26
527.00
548
548
506
42
2c
7
Drilled shaft
32
39
533.00
556
556
513
43
2
6
Footing
30
2
--
563
563
551
12
3
5
Footing
29
2
--
559c
559
560
0c
0c
16
Footing
12
2
--
538
538
536
2
5
519
19c
(c)
(c)
15
Caisson
18
3
--
538
14
Caisson
24
1
--
531
531
498
33
17
503d
459
44
0d
L0550
4
Caisson
24
1
--
503d
A4497
4
Drilled shaft
29.9
11
493.50
509d
509d
459
50
0d
A6288
6
Drilled shaft
32
27
442.00
469
469
401
68
7
5
Drilled shaft
32
26
444.50
464
467
413
51
3
4
Drilled shaft
32
25
451.50
460
460
443
17
10
aThe point of lowest elevation in the scour hole near the bridge pier/bent, not necessarily at the upstream face. bScour hole at this pier/bent is substantially affected by upstream pier/bent. cScour hole is substantially affected by adjacent spur dike. dScour hole mitigated by riprap blanket around pier(s).
18 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
Table 7. Results near piers and bents from surveys on the Missouri River between Kansas City and St. Louis, Missouri, May 19–26, 2021.
A
A'
700
Pier 22 Pier 21
725
Cap
Average water surface During 2021 survey (681.3 feet above NAVD 88) During 2017 survey (687.8 feet above NAVD 88) During 2013 survey (675.4 feet above NAVD 88) During 2011 survey (693.9 feet above NAVD 88)
Column
Pier 23
Cap
750 Pier 20
Elevation, in feet above North American Vertical Datum of 1988 (NAVD 88)
775
Cap
Cap Column Column
Column
Footing Seal course
675 Footing Seal course
650
625
Footing
Channel bed From 2021 survey From 2017 survey From 2013 survey From 2011 survey
Drilled shafts
Approximate ground line from 1999 bridge plans
Footing
Seal course
Seal course
Drilled shafts
Drilled shafts
Drilled shafts
Approximate top of bedrock (from core logs)
600
575
Survey is along cross-section line shown in figure 6, facing downstream. 2,500
2,600
2,700
2,800
2,900
3,000
3,100
Distance from fill face of left (north) abutment, in feet
3,200
3,300
3,400
3,500
3,600
Substructural and superstructural details, approximate ground line, and top of bedrock line from 1999 bridge plans (Missouri Department of Transportation, written commun., 2011).
Part of bridge shown above
Figure 8. Key features, substructural and superstructural details, and surveyed channel bed of structure A5664 on State Highway 13 crossing the Missouri River at Lexington, Missouri.
Results of Bathymetric and Velocimetric Surveys 19
550 2,400
0"
93° 51'4 0"
12'4
93° 51'4 5"
39°
93° 51'5 0"
93° 52'0 0"
93° 51'5 5"
20 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
39°
12'4
5"
A 39°
12'3
5"
EXPLANATION
Stone revetment
Change in channel-bed elevation, in feet
Stone revetment
30 20
10 93° 52'0 0"
7 5
DEPOSITION
15
3 1 −1 −3 −5
−10
Pier 21
FLOW
−15
SCOUR
−7
−20 39°
−30
12'3
0"
−45 Scour hole
Scour hole
$ e Spu
r dik
Pier 22
Spur dik
e (upstr
eam fro
m surve
y area)
Spur dike
No data, or outside 95-percent confidence interval
0
50
100 25
150 50
200
250 FEET 75 METERS
51'3
0
93°
Base from National Agriculture Imagery Program, 2020 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
5"
93°
51'5
5"
Cross section shown A' in figure 8
Figure 9. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A5664 on State Highway 13 at Lexington, Missouri, on May 19, 2021, and May 23, 2017, with probabilistic thresholding.
Results of Bathymetric and Velocimetric Surveys 21
Preparing for a survey with the multibeam echosounder mapping system. Photograph by Richard J. Huizinga, U.S. Geological Survey.
22 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021 Table 8. Summary information and bathymetric surface difference statistics from surveys on the Missouri River between Kansas City and St. Louis, Missouri, from May 19–26, 2021, and previous surveys (Huizinga, 2012, 2014, 2020a). [Dates are shown as month/day/year. All elevations are referenced to the North American Vertical Datum of 1988. MoDOT, Missouri Department of Transportation; Min, minimum; Max, maximum; A, Huizinga (2012); B, Huizinga (2014); C, Huizinga (2020a)]
Difference between 2021 survey and previous surveya
Previous survey Site number (fig. 1)
14
15
16
17
18
19
20
21
MoDOT structure number
A5664
A5910
K0999
G0069
A4574
L0962
L0550/ A4497
A6288
Source of data A
Date
Streamflow, in cubic feet per second
Surveyed area, in 1×106 square feet
Average water-surface elevation, in feet
Streamflow, in cubic feet per second
Surveyed area, in 1×106 square feet
Average watersurface elevation, in feet
07/20/11
211,000
1.630
693.9
−128,800
0.003
−12.6
B
04/24/13
41,100
1.263
675.4
41,100
0.370
5.8
C
05/23/17
160,000
1.683
687.8
−77,800
−0.050
−6.5
A
07/21/11
213,000
1.700
674.3
−137,500
−2.484
−12.6
B
04/25/13
41,100
1.185
657.0
34,400
0.498
4.7
C
05/23/17
160,000
1.754
668.8
−84,500
−0.071
−7.1
A
07/21/11
213,000
1.890
648.3
−133,200
0.001
−13.8
B
04/25/13
44,600
1.131
630.3
35,200
0.760
4.2
C
05/24/17
152,000
1.930
641.9
−72,200
−0.039
−7.4
A
07/22/11
214,000
1.570
615.7
−112,000
0.034
−10.6
B
04/26/13
71,000
1.524
602.0
31,000
0.080
3.1
C
05/24/17
167,000
1.635
610.8
−65,000
−0.031
−5.7
A
07/25/11
219,000
2.034
590.9
−107,000
0.031
−10.0
B
04/29/13
58,700
1.889
576.0
53,300
0.176
4.9
C
05/25/17
153,000
2.088
584.7
−41,000
−0.023
−3.8
A
07/26/11
219,000
1.851
580.9
−109,000
0.124
−9.8
B
04/29/13
63,400
1.527
566.5
46,600
0.448
4.6
C
05/25/17
155,000
1.868
574.7
−45,000
0.107
−3.6
A
01/26/10
155,000
1.526
540.1
−59,300
0.091
−5.9
A
03/01/11
145,000
1.537
540.0
−49,300
0.080
−5.8
A
07/27/11
219,000
1.651
544.7
−123,300
−0.034
−10.5
B
04/30/13
62,500
1.578
530.3
33,200
0.039
3.9
C
05/31/17
125,000
1.673
537.0
−29,300
−0.056
−2.8
A
07/28/11
215,000
2.475
504.2
−83,000
0.003
−6.5
B
05/02/13
108,000
2.145
494.6
24,000
0.333
3.1
C
05/31/17
192,000
2.545
501.1
−60,000
−0.067
−3.4
Results of Bathymetric and Velocimetric Surveys 23 Table 8. Summary information and bathymetric surface difference statistics from surveys on the Missouri River between Kansas City and St. Louis, Missouri, from May 19–26, 2021, and previous surveys (Huizinga, 2012, 2014, 2020a).—Continued [Dates are shown as month/day/year. All elevations are referenced to the North American Vertical Datum of 1988. MoDOT, Missouri Department of Transportation; Min, minimum; Max, maximum; A, Huizinga (2012); B, Huizinga (2014); C, Huizinga (2020a)]
Statistics of differences between 2021 and previous bathymetric survey surfaces, in feet Site number (fig. 1)
Minb,c
Maxb,c
Averagec
Standard deviation
14
−17.8
20.3
3.22
4.63
15
16
17
18
19
20
21
Joint area of Max difference interest with near upstream detectable pier face(s),c,d change, in feet in percent 3.0
88
Net volume of cut, in cubic yards
Net volume of fill, in cubic yards
Net change in sediment volume, in cubic yards
43,400
211,000
167,600
−15.8
14.3
−1.14
2.51
1.1
61
49,000
16,900
−32,100
−25.1
14.6
−0.52
3.42
4.2
92
89,700
61,200
−28,500
−33.9
19.5
0.44
6.00
1.9
86
104,000
127,000
23,000
−22.5
13.0
−1.55
3.31
−3.7
64
63,200
20,200
−43,000
−25.4
15.9
−0.33
3.85
2.8
91
95,900
77,600
−18,300
−28.1
36.6
−0.09
4.79
11.9
73
94,500
90,100
−4,400
−18.9
20.8
−0.70
2.71
−4.8
58
37,800
20,900
−16,900
−26.0
13.0
−0.95
2.88
11.8
85
97,800
42,000
−55,800
−21.7
16.0
1.84
4.95
8.8
76
51,200
131,000
79,800
−27.9
16.5
0.66
4.12
5.3
71
55,800
81,900
26,100
−36.4
20.8
−0.09
3.24
7.8
87
64,400
59,900
−4,500
−21.7
17.8
−0.53
3.18
5.8
76
91,900
62,200
−29,700
−16.1
16.1
−0.54
2.79
−3.8
64
67,900
44,100
−23,800
−25.2
12.3
−0.44
2.34
5.2
85
77,500
48,800
−28,700
−34.9
38.6
2.47
5.88
8.2
82
72,200
209,400
137,200
−27.2
26.5
2.74
4.00
4.1
72
28,900
140,400
111,500
−33.3
38.4
1.59
5.00
11.3
91
77,300
177,500
100,200
−12.8
35.4
−1.21
4.65
32.5
73
94,200
49,000
−45,200
−16.4
39.5
1.27
5.10
39.5
72
46,700
92,100
45,400
−12.4
47.0
4.52
5.37
47.0
83
25,700
246,800
221,100
−12.9
33.8
0.49
4.68
24.2
62
57,900
75,300
17,400
−21.9
16.8
−0.35
2.34
−7.8
77
50,400
34,300
−16,100
−20.4
23.4
−1.38
3.82
−9.9
73
146,700
56,400
−90,300
−26.2
20.4
−3.05
2.11
−11.0
71
177,700
8,500
−169,200
−26.7
26.4
−0.39
2.69
−10.1
76
85,500
58,100
−27,400
aA positive value of difference means the 2021 value was larger than previous value, whereas a negative value means the 2021 value was smaller than the previous value. bThe maximum or minimum value of change likely is near a vertical pier face and affected by minor positional variances. cA positive value represents deposition, and a negative value represents scour. dThe maximum difference near the upstream pier face was taken near the location of the “approximate elevation of scour hole at upstream pier face” in table 7.
0"
93° 51'4 0"
12'4
93° 51'4 5"
39°
93° 51'5 0"
93° 52'0 0"
93° 51'5 5"
24 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
39°
12'4
5"
A 39°
12'3
5"
EXPLANATION
Stone revetment
Change in channel-bed elevation, in feet
Stone revetment
30 20
93° 52'0 0"
7 5
DEPOSITION
15 10
3 1 −1 −3 −5
−10
Pier 21
FLOW
−15
SCOUR
−7
−20 39°
−30
12'3
0"
−45 Scour hole
Scour hole
e Area not surveyed in 2013
Area not surveyed in 2013
r dik
Pier 22
Area not surveyed in 2013
Spu
Spur dik
e (upstr
eam fro
m surve
y area)
Spur dike
No data, or outside 95-percent confidence interval
0
50
100 25
150 50
200
250 FEET 75 METERS
51'3
0
93°
Base from National Agriculture Imagery Program, 2020 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
5"
93°
51'5
5"
Cross section shown A' in figure 8
Figure 10. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A5664 on State Highway 13 at Lexington, Missouri, on May 19, 2021, and April 24, 2013, with probabilistic thresholding.
$
0"
93° 51'4 0"
12'4
93° 51'4 5"
39°
93° 51'5 0"
93° 52'0 0"
93° 51'5 5"
Results of Bathymetric and Velocimetric Surveys 25
39°
12'4
5"
A 39°
12'3
5"
EXPLANATION
Stone revetment
Change in channel-bed elevation, in feet
Stone revetment
30 20
10 93° 52'0 0"
7 5
DEPOSITION
15
3 1 −1 −3 −5
−10
Pier 21
FLOW
−15
SCOUR
−7
−20 39°
−30
12'3
0"
−45 Scour hole
Scour hole
$ e Spu r dik
Pier 22
Spur dik
e (upstr
eam fro
m surve
y area)
Spur dike
No data, or outside 95-percent confidence interval
0
50
100 25
150 50
200
250 FEET 75 METERS
51'3
0
93°
Base from National Agriculture Imagery Program, 2020 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
5"
93°
51'5
5"
Cross section shown A' in figure 8
Figure 11. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A5664 on State Highway 13 at Lexington, Missouri, on May 19, 2021, and July 20, 2011, with probabilistic thresholding.
26 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
Structure A5910 on U.S. Highway 24 at Waverly, Missouri Structure A5910 (site 15; table 2) on U.S. Highway 24 crosses the Missouri River at RM 293.2 at Waverly, Mo., east of Lexington and Kansas City, Mo. (fig. 1). The site was surveyed on May 20, 2021, when the average water-surface elevation of the river in the survey area, determined by the RTK GNSS tide solution, was 661.7 ft (table 6; fig. 12) and streamflow was about 75,500 ft3/s during the survey (table 6). The survey area was about 1,640 ft long and about 1,090 ft wide, extending from bank to bank in the main channel (fig. 12). The survey area extended about 650 ft upstream from the centerline of structure A5910 (fig. 12). The channel-bed elevations ranged from about 635 to 652 ft throughout the survey area (5th to 95th percentile range of the bathymetric data; fig. 13), except downstream from the spur dikes on the left (north) bank and in the channel thalweg along the toe of the right (south) bank (fig. 12; table 6). The thalweg was about 10 to 15 ft deeper than the channel bed in the middle of the channel (fig. 12). A line of small to medium dune features was observed in the middle of the channel through the survey reach, and numerous smaller dunes and ripples were present throughout the channel reach (fig. 12). A localized deep scour hole downstream from the downstream spur dike on the left bank had a minimum channel-bed elevation of about 618 ft (table 6; fig. 12). As in previous surveys (Huizinga, 2012, 2014, 2022a), a rock outcrop was evident on the right (south) bank at the upstream end of the reach, and the stone revetment and a longitudinal spur dike also were present on the right bank throughout the reach (fig. 12). The minor scour holes near piers 10 and 11 were difficult to discern from nearby dunes and ripples (figs. 12, 1.2). Information from bridge plans indicates that piers 10 and 11 are founded on shafts drilled 30 to 42 ft into bedrock, and the thickness of bed material between the bottom of the scour hole and bedrock at pier 11 is 35 ft (table 7; fig. 14). Along the upstream bridge face, the surveyed bed from 2021 generally falls within the fluctuating range of elevations seen in previous multibeam surveys (fig. 14). The difference between the survey on May 20, 2021, and the previous survey on May 23, 2017 (fig. 15), indicates about 91 percent of the joint area of interest had detectable change, which means about 9 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Deposition appears dominant in the thalweg along the right (south) bank throughout the reach between 2017 and 2021 in the DoD, whereas scour is evident in the area along a line between the southern tips of the spur dikes (fig. 15). The average difference between the bathymetric surfaces was –0.33 ft (table 8), indicating minor channel degradation between the 2017 and 2021 surveys. The net volume of cut in the reach from 2017 to 2021 was about 95,900 yd3, and the net volume of fill was about 77,600 yd3, resulting in a net loss of about 18,300 yd3 of sediment between 2017 and 2021 (table 8). The cross section from the 2021 survey along the
upstream face of the bridge is similar to the 2017 survey section between the left bank and pier 10, is 5 to 12 ft below the 2017 survey section between piers 10 and 11 and is 5 to 12 ft above the 2017 survey section between pier 11 and the right bank (fig. 14). The frequency distribution of bed elevations in 2021 is similar to the 2017 distribution above an elevation of 644 ft, but the 2017 distribution has a higher percentage of cells at a lower channel-bed elevation than 2021 (fig. 13). The rock outcrop, stone revetment, and longitudinal spur dike on the right (south) bank showed localized signs of minor scour and deposition, and the various spur dikes throughout the channel showed minor scour on one face and deposition on the other (fig. 15). As with previous DoDs, deposition or scour apparent on opposing faces of a feature likely results from minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section). The difference between the survey on May 20, 2021, and the survey on April 25, 2013 (fig. 16), indicates about 64 percent of the joint area of interest had detectable change, which means about 36 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Minor erosion and deposition appear nearly balanced throughout the reach between 2013 and 2021 in the DoD, with scour slightly more dominant and with localized substantial erosion and deposition downstream from the spur dikes (fig. 16). However, the average difference between the bathymetric surfaces was –1.55 ft (table 8), indicating moderate channel degradation between the 2013 and 2021 surveys, and the net loss of sediment between 2013 and 2021 was about 43,000 yd3, which is more than double the net loss of sediment between 2017 and 2021 (table 8). The cross section from the 2021 survey along the upstream face of bridge is roughly similar to the 2013 survey section, varying 5 to 10 ft above and below the 2013 section (fig. 14). The frequency distribution of bed elevations in 2021 appears similar in shape to 2013, but with a lower percentage of cells in the middle range of channel-bed elevations (fig. 13). The rock outcrop, stone revetment, and longitudinal spur dike on the right (south) bank are within the bounds of uncertainty (fig. 16). A substantial part of the channel on the left (north) side was not surveyed in 2013 because of generally lower flows (table 8) and shallow depths in that area. As with previous DoDs, deposition or scour apparent on opposing faces of a feature likely results from minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section). The difference between the survey on May 20, 2021, and the earliest survey during flooding on July 21, 2011 (fig. 17), indicates about 86 percent of the joint area of interest had detectable change, which means about 14 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Deposition is dominant in the thalweg along the right (south) bank between 2011 and 2021 in the DoD, and substantial deposition is balanced with moderate to substantial erosion downstream from the upstream spur dike, whereas the scour hole downstream from the downstream spur dike is substantially larger in 2021 than
A
39°13
'00"
" 93°30'30
" 93°30'35
" 93°30'40
" 93°30'45
93°30'55
93°30'50
"
"
Results of Bathymetric and Velocimetric Surveys 27
Survey date May 20, 2021 Streamflow 75,500 cubic feet per second Average water-surface elevation 661.7 feet above NAVD 88
EXPLANATION Channel-bed elevation, in feet above the North American Vertical Datum of 1988 665 660 655
Pier 10
Spur dike
Spur dike
650 Scour hole
645 640 635
39°12
'55"
FLOW
630 625 620 615
Pier 11
$ 39°12
'50"
Rock outcrop Longitudinal spur dike
Stone revetment
Stone revetment
Cross section shown in figure 14 A' Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
0 0
50
100 25
Figure 12. Bathymetric survey of the Missouri River channel near structure A5910 on U.S. Highway 24 at Waverly, Missouri.
150 50
200
250 FEET 75 METERS
28 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021 14
90 12
Percentage of total survey-grid cells
80 10
70 60
8
50 6
40 30
4
20 2 10 0 620
625
630
635
640
645
650
655
660
665
0 670
Cumulative percentage of survey-grid cells lower than indicated elevation
100
Elevation, in feet above the North American Vertical Datum of 1988 EXPLANATION
[ft3/s, cubic foot per second] Cumulative percentage
Frequency distribution 2021 survey data; 75,500 ft 3/s
2021 survey data; 75,500 ft 3/s
3
2017 survey data; 160,000 ft /s
2017 survey data; 160,000 ft 3/s
2013 survey data; 41,100 ft3/s
2013 survey data; 41,100 ft3/s
2011 survey data; 213,000 ft3/s
2011 survey data; 213,000 ft3/s
Figure 13. Frequency distribution of bed elevations for bathymetric survey-grid cells in 1-foot elevation bins on the Missouri River near structure A5910 on U.S. Highway 24 at Waverly, Missouri, on May 20, 2021, compared to previous surveys in 2011, 2013, and 2017 (Huizinga, 2012, 2014, and 2020a, respectively).
2011 (fig. 17). The average difference between the bathymetric surfaces was +0.44 ft (table 8), indicating minor to moderate deposition between the 2011 and 2021 surveys, with a net gain of sediment of about 23,000 yd3 (table 8). The frequency distribution of bed elevations in 2011 was wider and lower than 2021, with a lower percentage of cells at a wider range of channel-bed elevations (fig. 13). The rock outcrop, stone revetment, and longitudinal spur dike on the right (south) bank showed localized signs of minor scour and deposition, and the various spur dikes throughout the channel showed minor scour on one face and deposition on the other (fig. 17). As with previous DoDs, deposition or scour apparent on opposing faces of
a feature likely results from minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section). The vertically averaged velocity vectors indicate mostly uniform flow in the middle of the channel, with velocities ranging from about 3 to 9 feet per second (ft/s; fig. 18). Local lower velocities and turbulence were observed downstream from the various spur dikes on the left (north) bank (fig. 18). The wake vortices downstream from the main channel piers were not pronounced and seemed to be no greater than the general nonuniformity of flow observed in the channel (fig. 18). Minor localized turbulence was present in all the sections (fig. 18).
A
A'
700
Cap
Cap
Column
675
650
Column
Average water surface During 2021 survey (661.7 feet above NAVD 88) During 2017 survey (668.8 feet above NAVD 88) During 2013 survey (657.0 feet above NAVD 88) During 2011 survey (674.3 feet above NAVD 88)
Cap
Cap
Column
Column
Pedestal
Pedestal
Footing Seal course
Pedestal Footing
Footing
Seal course
Channel bed From 2021 survey From 2017 survey From 2013 survey From 2011 survey
Seal course
625
Pier 12
Pier 11
Pier 10
725
Pier 9
Elevation, in feet above North American Vertical Datum of 1988 (NAVD 88)
750
Piles
Drilled shafts
Footing Seal course
Approximate ground line from 1999 bridge plans Drilled shafts
Approximate top of bedrock (from core logs)
600 Drilled shafts
575
Survey is along cross-section line shown in figure 12, facing downstream. 1,000
1,100
1,200
1,300
1,400
1,500
1,600
Distance from fill face of left (north) abutment, in feet
1,700
1,800
1,900
2,000
2,100
Substructural and superstructural details, approximate ground line, and top of bedrock line from 1999 bridge plans (Missouri Department of Transportation, written commun., 2011).
Part of bridge shown above
Figure 14. Key features, substructural and superstructural details, and surveyed channel bed of structure A5910 on U.S. Highway 24 crossing the Missouri River at Waverly, Missouri.
Results of Bathymetric and Velocimetric Surveys 29
550 900
" 93°30'30
" 93°30'35
" 93°30'40
" 93°30'45
93°30'55
93°30'50
"
"
30 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
A
39°13
'00"
EXPLANATION Change in channel-bed elevation, in feet 30 20
10 7 Pier 10
Spur dike
Spur dike
5
DEPOSITION
15
3
Scour hole
1 −1 −3 −5
'55"
−10 −15
SCOUR
39°12
−7
FLOW
−20 −30 −45 Pier 11
$ 39°12
'50"
Rock outcrop Longitudinal spur dike
Stone revetment
Stone revetment
Cross section shown in figure 14 A' Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
0 0
50
100 25
150 50
200
250 FEET 75 METERS
Figure 15. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A5910 on U.S. Highway 24 at Waverly, Missouri, on May 20, 2021, and May 23, 2017, with probabilistic thresholding.
No data, or outside 95-percent confidence interval
" 93°30'30
" 93°30'35
" 93°30'40
" 93°30'45
93°30'55
93°30'50
"
"
Results of Bathymetric and Velocimetric Surveys 31
A
39°13
'00"
EXPLANATION Change in channel-bed elevation, in feet 30 20
10
Area not surveyed in 2013
7
Area not surveyed in 2013
Pier 10
5
Spur dike
Spur dike
Area not surveyed in 2013
DEPOSITION
15
3
Scour hole
1 −1 −3 −5
'55"
−10 −15
SCOUR
39°12
−7
FLOW
−20 −30 −45 Pier 11
$ 39°12
'50"
Rock outcrop Longitudinal spur dike
Stone revetment
Stone revetment
Cross section shown in figure 14 A' Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
0 0
50
100 25
150 50
200
250 FEET 75 METERS
Figure 16. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A5910 on U.S. Highway 24 at Waverly, Missouri, on May 20, 2021, and April 25, 2013, with probabilistic thresholding.
No data, or outside 95-percent confidence interval
" 93°30'30
" 93°30'35
" 93°30'40
" 93°30'45
93°30'55
93°30'50
"
"
32 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
A
39°13
'00"
EXPLANATION Change in channel-bed elevation, in feet 30 20
10 7 Pier 10
Spur dike
Spur dike
5
DEPOSITION
15
3
Scour hole
1 −1 −3 −5
'55"
−10 −15
SCOUR
39°12
−7
FLOW
−20 −30 −45 Pier 11
$ 39°12
'50"
Rock outcrop Longitudinal spur dike
Stone revetment
Stone revetment
Cross section shown in figure 14 A' Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
0 0
50
100 25
150 50
200
250 FEET 75 METERS
Figure 17. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A5910 on U.S. Highway 24 at Waverly, Missouri, on May 20, 2021, and July 21, 2011, with probabilistic thresholding.
No data, or outside 95-percent confidence interval
A
39°13
'00"
" 93°30'30
" 93°30'35
" 93°30'40
" 93°30'45
93°30'55
93°30'50
"
"
Results of Bathymetric and Velocimetric Surveys 33
EXPLANATION
Survey date May 20, 2021 Streamflow 75,500 cubic feet per second Average water-surface elevation 661.7 feet above NAVD 88
Channel-bed elevation, in feet above the North American Vertical Datum of 1988 665 660 655
Pier 10
Spur dike
Spur dike
650 Scour hole
645 640 635
39°12
'55"
630
FLOW
625 620 615 Pier 11
$ Vertically averaged velocity, in feet per second
39°12
'50"
Rock outcrop Longitudinal spur dike
Stone revetment
Stone revetment
Cross section shown in figure 14 A' Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
0 0
50
100 25
150 50
200
250 FEET 75 METERS
Figure 18. Bathymetry and vertically averaged velocities of the Missouri River channel near structure A5910 on U.S. Highway 24 at Waverly, Missouri.
0 to 1 >1 to 2 >2 to 3 >3 to 4 >4 to 5 >5 to 6 >6 to 7 >7 to 8 >8 to 9 >9 to 10 >10 to 11 >11 to 12
34 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
Structure K0999 on State Highway 41 at Miami, Missouri Structure K0999 (site 16; table 2) on State Highway 41 crosses the Missouri River at RM 262.6 at Miami, Mo., east of Waverly and Kansas City, Mo. (fig. 1). The site was surveyed on May 20, 2021, when the average water-surface elevation near the bridge, determined by the RTK GNSS tide solution, was 634.5 ft (table 6; fig. 19) and streamflow was measured at about 79,800 ft3/s during the survey (table 6). The survey area was about 1,640 ft long and varied from about 1,380 ft wide at the upstream end to about 1,050 ft wide near the downstream end, extending from bank to bank in the main channel (fig. 19). The survey area extended about 625 ft upstream from the centerline of structure K0999 (fig. 19). The approximate channel-bed elevations ranged from about 607 to 626 ft for most of the surveyed area (5th to 95th percentile range of the bathymetric data; table 6; fig. 20) except near pier 5, in the scour hole downstream from the spur dike on the left (north) bank, and in the troughs of the medium dune features in the thalweg along the toe of the rock outcrop along the right (south) side of the channel (fig. 19; table 6). The thalweg was along the outside of the river bend on the right (south) bank and was about 10 to 15 ft deeper than the bed in the middle of the channel (fig. 19). Numerous superimposed small to medium dunes and ripples were present throughout the channel (fig. 19). As in previous surveys (Huizinga, 2012, 2014, 2020a), a rock outcrop was present on the right (south) bank throughout the reach (fig. 19). A substantial scour hole was observed near pier 5 of structure K0999 (figs. 19, 1.3C, 1.3D), and was about 20 ft below the average channel-bed elevation upstream from the scour hole (table 7). Information from bridge plans indicates that piers 5 and 6 are caissons founded on bedrock, with about 43 ft of bed material between the bottom of the scour hole and bedrock at pier 6 but only about 9 ft of bed material between the bottom of the scour hole and bedrock at pier 5 (table 7; fig. 21). Pier 4 is founded on a footing on bedrock according to bridge plans (fig. 21), and no scour hole was observed near the pier (fig. 19; table 7). The surveyed bed along the cross section generally was similar to previous multibeam surveys (fig. 21), but as much as 15 ft higher than previous surveys between the left bank and pier 6. The approximate top-of-bedrock line from bridge plans confirms that the fluvial material near the right bank has washed away, exposing the bedrock along the thalweg, as in previous surveys (fig. 21). In modern construction, bridge substructural elements usually are pinned or socketed to bedrock (Brown and others, 2018; American Association of State Highway Transportation Officials, 2020), but full exposure of usually buried substructural elements warrants special consideration and observation. The difference between the survey on May 20, 2021, and the previous survey on May 24, 2017 (fig. 22), indicates about 85 percent of the joint area of interest had detectable change, which means about 15 percent of the differences in the joint area of interest are equivocal and within the bounds
of uncertainty (table 8). Scour appears dominant throughout most of the reach between 2017 and 2021 in the DoD, except downstream from the spur dike on the left (north) bank and in the troughs of the medium dunes near the thalweg (fig. 22). The average difference between the bathymetric surfaces was –0.95 ft (table 8), indicating moderate channel degradation between the 2017 and 2021 surveys. The net volume of cut in the reach from 2017 to 2021 was about 97,800 yd3, and the net volume of fill was about 42,000 yd3, resulting in a net loss of about 55,800 yd3 of sediment between 2017 and 2021 (table 8). The cross section from the 2021 survey along the upstream face of the bridge generally varies above and below the 2017 survey section (fig. 21). The frequency distribution of bed elevations in 2021 appears similar in shape to 2017, but with a slightly higher percentage of cells at a lower channelbed elevations (fig. 20). The rock outcrop on the right (south) bank showed localized signs of minor deposition and scour, but most of the rock outcrop indicated changes within 1 ft of the 2017 elevation, or changes outside the 95-percent confidence interval (fig. 22). The difference between the survey on May 20, 2021, and the survey on April 25, 2013 (fig. 23), indicates about 58 percent of the joint area of interest had detectable change, which means about 42 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). A substantial part of the channel on the left (north) side was not surveyed in 2013 because of generally lower flows (table 8) and shallow depths in that area. Erosion again appears dominant throughout most of the joint reach between 2013 and 2021 in the DoD, except localized minor deposition throughout the downstream channel thalweg (fig. 23). The average difference between the bathymetric surfaces was –0.70 ft (table 8), again indicating moderate channel degradation between the 2013 and 2021 surveys, but the net loss of sediment between 2013 and 2021 was about 16,900 yd3, which is less than the net loss of sediment between 2017 and 2021 (table 8). The cross section from the 2021 survey along the upstream face of bridge generally is similar to but 5 to 10 ft lower than the 2013 survey section (fig. 21). The frequency distribution of bed elevations in 2013 has a substantially higher percentage of cells at lower channel-bed elevations than 2021 (fig. 20). The difference in the distribution may be the result of the substantially narrower survey area in 2013, and general lack of bank information (fig. 23). The rock outcrop on the right (south) bank showed localized signs of minor scour (fig. 23); however, the differences of most of the channel near the rock outcrop were equivocal. As with previous DoDs, deposition or scour apparent on opposing faces of a feature likely results from minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section). The difference between the survey on May 20, 2021, and the earliest survey during flooding on July 21, 2011 (fig. 24), indicates about 73 percent of the joint area of interest had detectable change, which means about 27 percent of the differences in the joint area of interest are equivocal and within the
Results of Bathymetric and Velocimetric Surveys 35
"
"
'25
'30
°1 3
5"
93
°1 3
9'5
°1 3
" '35
" '40
°1
93
9'4
0"
39
93
°1
9'5
°1 3
°1 3
°1
93
'45
"
39
93
39
5"
39
°2
0'0
0"
EXPLANATION
Survey date May 20, 2021 Streamflow 79,800 cubic feet per second Average water-surface elevation 634.5 feet above NAVD 88
A
Channel-bed elevation, in feet above the North American Vertical Datum of 1988 640 635 630
r Spu
625
d ike
620 Pier 6
93
°1
3'4
5"
615
39
°1
610
9'4
0"
605
FLOW
600 595 590
$
93 °1
3'4 0
"
Pier 5
Rock outcrop
9'3
5"
Rock outcrop
Rock outcrop Pier 4
0
50
100 25
Figure 19. Bathymetric survey of the Missouri River channel near structure K0999 on State Highway 41 at Miami, Missouri.
150 50
200
250 FEET 75 METERS
93 °1 3'1
0
0"
A' 3'1 5"
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
Longitudinal spur dike
93 °1
Cross section shown in figure 21
e
l spur dik
a Longitudin
13 '20 "
°1
93 °
39
36 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021 12
90 10
Percentage of total survey-grid cells
80 70
8
60 6
50 40
4 30 20
2
10 0 600
605
610
615
620
625
630
635
0 640
Cumulative percentage of survey-grid cells lower than indicated elevation
100
Elevation, in feet above the North American Vertical Datum of 1988 EXPLANATION
[ft3/s, cubic foot per second] Cumulative percentage
Frequency distribution 2021 survey data; 79,800 ft 3/s
2021 survey data; 79,800 ft 3/s
3
2017 survey data; 152,000 ft /s
2017 survey data; 152,000 ft 3/s
2013 survey data; 44,600 ft3/s
2013 survey data; 44,600 ft3/s
2011 survey data; 213,000 ft3/s
2011 survey data; 213,000 ft3/s
Figure 20. Frequency distribution of bed elevations for bathymetric survey-grid cells in 1-foot elevation bins on the Missouri River near dual bridge structure K0999 on State Highway 41 at Miami, Missouri, on May 20, 2021, compared to previous surveys in 2011, 2013, and 2017 (Huizinga, 2012, 2014, and 2020a, respectively).
bounds of uncertainty (table 8). Scour and deposition appear approximately balanced throughout the reach between 2011 and 2021 in the DoD, with substantial scour near the spur dike on the left (north) bank balanced with deposition downstream, and alternating scour and deposition in the thalweg (fig. 24). The average difference between the bathymetric surfaces was –0.09 ft (table 8), indicating a rough balance between aggradation and degradation between the 2011 and 2021 surveys. There was a net loss of sediment between 2011 and 2021 of only 4,400 yd3 (table 8). The frequency distribution of bed elevations in 2011 is remarkably similar to 2021 (fig. 20). The rock outcrop on the right (south) bank showed localized signs of minor scour, particularly higher on the bank (fig. 24); however, the differences of most of the channel near the rock
outcrop were equivocal. As with the previous DoDs, deposition or scour apparent on opposing faces of a feature likely results from minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section). The vertically averaged velocity vectors indicate mostly uniform flow in the middle of the channel, with velocities ranging from about 2 to 8 ft/s (fig. 25). Lower velocities and turbulence were observed downstream from the spur dike on the left (north) side of the channel (fig. 25). The wake vortices downstream from piers 5 and 6 were not pronounced and seemed to be no greater than the general nonuniformity of flow observed in the channel (fig. 25). Minor localized turbulence again was present in all the sections (fig. 25).
A
A'
Cap
Cap
Pier 4
Pier 5
700
Column
Average water surface During 2021 survey (634.5 feet above NAVD 88) During 2017 survey (641.9 feet above NAVD 88) During 2013 survey (630.3 feet above NAVD 88) During 2011 survey (648.3 feet above NAVD 88)
675 Column
Cap
Cap
Column Pedestal
Column
650
Footing Pedestal
Pedestal
625
Pedestal
Approximate ground line from 1938 bridge plans
600
Footing
Channel bed From 2021 survey From 2017 survey From 2013 survey From 2011 survey
Caisson
575
Caisson
Approximate top of bedrock (from core logs)
Survey is along cross-section line shown in figure 19, facing downstream. 800
900
1,000
1,100
1,200
1,300
1,400
1,500
Distance from fill face of left (north) abutment, in feet
1,600
1,700
1,800
1,900
2,000
Substructural and superstructural details, approximate ground line, and top of bedrock line from 1938 bridge plans (Missouri Department of Transportation, written commun., 2002; 2011).
Part of bridge shown above
Figure 21. Key features, substructural and superstructural details, and surveyed channel bed of structure K0999 on State Highway 41 crossing the Missouri River at Miami, Missouri.
Results of Bathymetric and Velocimetric Surveys 37
550 700
Bent 3
725
Pier 6
Elevation, in feet above North American Vertical Datum of 1988 (NAVD 88)
750
38 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
"
"
'25
'30
9'5
5"
°1 3
°1 3
39
°2
93
°1 3
°1
93
"
39
'35
" '40 0"
93
9'4
9'5
°1 3
°1
93
'45
"
39
°1 3
°1
93
39
0'0
0"
5"
EXPLANATION Change in channel-bed elevation, in feet
A
45 30
15 r Spu
10
d ike
7 5 3
Pier 6
°1 93
3'4
5"
1 −1
39
−3
9'4
0"
−5 −7
FLOW
−10 −15
SCOUR
°1
DEPOSITION
20
−20 −30 −45 Pier 5
93 °1
3'4 0
"
$ Rock outcrop
9'3
5"
Rock outcrop
Rock outcrop Pier 4
25
50
200
250 FEET 75 METERS
Figure 22. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure K0999 on State Highway 41 at Miami, Missouri, on May 20, 2021, and May 24, 2017, with probabilistic thresholding.
"
150
13 '10
100
93 °
0
50
3'1 5"
0
93 °1
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
Longitudinal spur dike
A' "
Cross section shown in figure 21
e
l spur dik
a Longitudin
3'2 0
°1
93 °1
39
No data, or outside 95-percent confidence interval
Results of Bathymetric and Velocimetric Surveys 39
"
" 5"
°1 3
°1 3
9'5
'25
'30
39
93
°1
°1 3
'40
'35
"
"
39
93
9'4
0"
93
°1
9'5
°1 3
°1 3
°1
93
'45
"
39
93
39
°2
0'0
0"
5"
EXPLANATION Change in channel-bed elevation, in feet
A
45 30
15 r Spu
10 7
d ike
Area not surveyed in 2013
5 3
Area not surveyed in 2013
Pier 6
1
3'4
5"
Area not surveyed in 2013
°1
−1
93 °1
−3
9'4
0"
−5 −7
FLOW
−10 −15
SCOUR
39
DEPOSITION
20
−20 −30 −45 Pier 5
93 °1
3'4 0"
$ Rock outcrop
9'3
5"
Rock outcrop
Rock outcrop Pier 4
Area not surveyed in 2013
0
50
100 25
150 50
200
250 FEET 75 METERS
Figure 23. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure K0999 on State Highway 41 at Miami, Missouri, on May 20, 2021, and April 25, 2013, with probabilistic thresholding.
93 °1 3'1
0
0"
A' 3'1 5"
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
Longitudinal spur dike
93 °1
Cross section shown in figure 21
e
al spur dik
Longitudin
13 '20 "
°1
93 °
39
No data, or outside 95-percent confidence interval
40 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
"
"
'25
'30
°1 3
5"
39
°2
93
°1 3
9'5
°1 3
" '35
" '40
°1
93
9'4
0"
39
93
°1
9'5
°1 3
°1 3
°1
93
'45
"
39
93
39
0'0
0"
5"
EXPLANATION Change in channel-bed elevation, in feet
A
45 30
15 r Spu
10
d ike
7 5 3
Pier 6 3'4
5"
1
°1
−1
93 °1
−3
9'4
0"
−5 −7
FLOW
−10 −15
SCOUR
39
DEPOSITION
20
−20 −30 −45 Pier 5
93 °1
3'4 0
"
$ Rock outcrop
9'3
5"
Rock outcrop
Rock outcrop Pier 4
0
50
100 25
150 50
200
250 FEET 75 METERS
Figure 24. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure K0999 on State Highway 41 at Miami, Missouri, on May 20, 2021, and July 21, 2011, with probabilistic thresholding.
93 °1 3'1
0
0"
A' 3'1 5"
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
Longitudinal spur dike
93 °1
Cross section shown in figure 21
e
l spur dik
a Longitudin
13 '20 "
°1
93 °
39
No data, or outside 95-percent confidence interval
Results of Bathymetric and Velocimetric Surveys 41
"
"
'25
'30
°1 3
5"
93
°1 3
9'5
°1 3
" '35
" '40
°1
93
9'4
0"
39
93
°1
9'5
°1 3
°1 3
°1
93
'45
"
39
93
39
5"
39
°2
0'0
0"
EXPLANATION
Survey date May 20, 2021 Streamflow 79,800 cubic feet per second Average water-surface elevation 634.5 feet above NAVD 88
A
Channel-bed elevation, in feet above the North American Vertical Datum of 1988 640 635 630
r Spu
625
d ike
620 Pier 6
93
°1
3'4
5"
615
39
°1
610
9'4
0"
605
FLOW
600 595 590
$
Pier 5
Vertically averaged velocity, in feet per second 93 °1
3'4 0
"
0 to 1 >1 to 2 >2 to 3 >3 to 4 >4 to 5 >5 to 6 >6 to 7 >7 to 8 >8 to 9 >9 to 10 >10 to 11 >11 to 12
Rock outcrop
9'3
5"
Rock outcrop
Rock outcrop Pier 4
0
50
100 25
150 50
200
250 FEET 75 METERS
Figure 25. Bathymetry and vertically averaged velocities of the Missouri River channel near structure K0999 on State Highway 41 at Miami, Missouri.
93 °1
0
3'1 0"
A' 3'1 5"
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
Longitudinal spur dike
93 °1
Cross section shown in figure 21
e
l spur dik
a Longitudin
3'2 0"
°1
93 °1
39
42 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
Structure G0069 on State Highway 240 at Glasgow, Missouri Structure G0069 (site 17; table 2) on State Highway 240 crosses the Missouri River at RM 226.3 at Glasgow, Mo., southeast of Miami and about halfway between Kansas City and St. Louis, Mo. (fig. 1). The site was surveyed on May 20, 2021, when the average water-surface elevation of the river in the survey area, determined by the RTK GNSS tide solution, was 605.1 ft (table 6; fig. 26) and streamflow on the Missouri River was about 102,000 ft3/s during the survey (table 6). The survey area was about 1,640 ft long and varied from about 940 ft wide at the upstream end to about 1,160 ft wide near the downstream end, extending from bank to bank in the main channel (fig. 26). The upstream end of the survey area was about 590 ft upstream from the centerline of structure G0069, and piers 2, 3, and 4 were in the water and away from the banks (fig. 26). The channel-bed elevations ranged from about 575 to 593 ft for most of the surveyed area (5th to 95th percentile range of the bathymetric data; table 6; fig. 27), except near the piers and downstream from the spur dike on the downstream right (west) bank (fig. 26; table 6). A poorly defined thalweg was present along the left (east) bank and deepened in the downstream reach (fig. 26). The thalweg was about 13 to 15 ft deeper than the channel bed in the middle of the downstream reach (fig. 26). Two spur dikes, and a sunken barge observed during the previous surveys, were present on the right (west) bank (fig. 26). A series of medium to large dunes were present in the middle of the channel throughout the reach, and numerous small dunes and ripples were present throughout the rest of the channel (fig. 26). A small scour hole was observed near pier 2 (fig. 26), which is founded on a footing on bedrock according to bridge plans (fig. 28; table 6). The ground line from the bathymetric survey indicated that the right side of the footing seemed to be undermined in previous surveys in 2011 and 2013 but was partially buried in bed sediments in the 2017 and 2021 surveys (figs. 28, 1.4B, 1.4C). The details of the footing of pier 2 in the bridge plans for structure G0069 are not sufficient to tell if it was entrenched in the bedrock in any way, particularly if the top of the bedrock was not level, as indicated by previous surveys (Huizinga, 2014; fig. 28). In modern construction, bridge substructural elements usually are pinned or socketed to bedrock (Brown and others, 2018; American Association of State Highway Transportation Officials, 2020), but full exposure of usually buried substructural elements warrants special consideration and observation, particularly at an older bridge such as structure G0069 (built in 1922). A substantial scour hole was observed near main channel pier 3 (figs. 26, 1.4D, 1.4E), and a smaller scour hole was observed near pier 4 (fig. 26). Near pier 3, the scour hole had a minimum channel-bed elevation of about 566 ft (table 7), which is about 12 ft below the average channel bed immediately upstream from the pier (figs. 26, 28; table 7). Near pier 4, the scour hole had a minimum channel-bed elevation of about 579 ft (figs. 26, 28; table 7). Information from bridge plans
indicates that piers 3 and 4 are caissons founded on bedrock, and there is about 4 ft of bed material between the bottom of the scour hole and bedrock at pier 3 and about 22 ft at pier 4 (fig. 28; table 7). The scour observed near all the highway bridge piers was substantially affected by the upstream railroad bridge piers (fig. 26). The 2021 surveyed bed generally was most similar to the 2011 multibeam survey (fig. 28). The approximate top of bedrock confirmed in the previous multibeam surveys seems to have a thin layer of fluvial material near the left bank in the 2021 survey (fig. 28), with further evidence from small dunes and ripples in that area (fig. 26). The difference between the survey on May 20, 2021, and the previous survey on May 24, 2017 (fig. 29), indicates about 87 percent of the joint area of interest had detectable change, which means about 13 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Scour and deposition appear roughly balanced throughout the reach between 2017 and 2021 in the DoD, with scour and deposition alternating in the troughs of the medium to large dune features in the middle of the channel and lengthwise throughout the right (west) side of the reach (fig. 29). The average difference between the bathymetric surfaces was –0.09 ft (table 8), indicating a rough balance between aggradation and degradation between the 2017 and 2021 surveys. The net volume of cut in the reach from 2017 to 2021 was about 64,400 yd3, and the net volume of fill was about 59,900 yd3, resulting in a net loss of only about 4,500 yd3 of sediment between 2017 and 2021 (table 8). The scour holes near piers 3 and 4 were narrower and shallower in 2021 and in 2017 (fig. 28). The frequency distribution of bed elevations in 2021 appears similar in shape to 2017, with a slightly higher percentage of cells in the middle range of channel-bed elevations than 2017 (fig. 27). The rock outcrop and stone revetment along the left (east) bank showed localized signs of minor to moderate scour, but most of the rock outcrop indicated changes within 1 ft of the 2017 elevation, or changes outside the 95-percent confidence interval (fig. 29). The difference between the survey on May 20, 2021, and the survey on April 26, 2013 (fig. 30), indicates about 71 percent of the joint area of interest had detectable change, which means about 29 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Deposition appears dominant throughout most of the reach between 2013 and 2021 in the DoD, except for localized erosion in the troughs of the medium to large dunes in the middle of the channel, and erosion along the upstream right (west) bank and downstream left (east) bank (fig. 30). The average difference between the bathymetric surfaces was +0.66 ft (table 8), indicating moderate channel aggradation between the 2013 and 2021 surveys, and the net gain of sediment between 2013 and 2021 was about 26,100 yd3 (table 8). The scour holes near piers 3 and 4 are nearly identical in 2013 and 2021 (fig. 28). However, the frequency distribution of bed elevations in 2013 has a substantially higher percentage of cells at lower channel-bed elevations than 2021 (fig. 27). The stone revetment along the right (southeast) bank showed
Results of Bathymetric and Velocimetric Surveys 43
'10"
'15"
3 9 °1 3
3 9 °1 3
'20"
'25"
3 9 °1 3
3 9 °1 3
EXPLANATION
A Pier 1
Rock outcrop
Rock outcrop
Sto
Channel-bed elevation, in feet above the North American Vertical Datum of 1988 ne
rev
etm
ent
Rock outcrop
Bo
605
at r
am
p
600 595
"
92°50'55
Thalweg
Thalweg Railroad bridge pier
590
Pier 2
585 580 575 570
FLOW Medium to large dunes Medium to large dunes
565 560
"
92°51'00
Pier 3
555
$
Railroad bridge pier
Railroad bridge pier
Pier 4
Spur dike
Spur dike
Base of old railroad bridge pier Sunken barge
"
92°51'05
Survey date May 20, 2021 Streamflow 102,000 cubic feet per second Average water-surface elevation 605.1 feet above NAVD 88 Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
Cross section shown in figure 28 A'
0 0
50
100 25
Figure 26. Bathymetric survey of the Missouri River channel near structure G0069 on State Highway 240 at Glasgow, Missouri.
150 50
200
250 FEET 75 METERS
44 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021 12
90 10
Percentage of total survey-grid cells
80 70
8
60 6
50 40
4 30 20
2
10 0 560
565
570
575
580
585
590
595
600
605
0 610
Cumulative percentage of survey-grid cells lower than indicated elevation
100
Elevation, in feet above the North American Vertical Datum of 1988 EXPLANATION
[ft3/s, cubic foot per second] Cumulative percentage
Frequency distribution 2021 survey data; 102,000 ft 3/s 3
2021 survey data; 102,000 ft 3/s
2017 survey data; 167,000 ft /s
2017 survey data; 167,000 ft 3/s
2013 survey data; 71,000 ft3/s
2013 survey data; 71,000 ft3/s
2011 survey data; 214,000 ft3/s
2011 survey data; 214,000 ft3/s
Figure 27. Frequency distribution of bed elevations for bathymetric survey-grid cells in 1-foot elevation bins on the Missouri River near structure G0069 on State Highway 240 at Glasgow, Missouri, on May 20, 2021, compared to previous surveys in 2011, 2013, and 2017 (Huizinga, 2012, 2014, and 2020a, respectively).
localized signs of scour and deposition downstream from the bridge and moderate deposition upstream from the bridges (fig. 30). The bedrock outcrop and stone revetment along the left (east) bank showed localized signs of minor to moderate scour (fig. 30); however, the differences of most of the channel near the rock outcrop were equivocal. As with previous DoDs, deposition or scour apparent on opposing faces of a feature likely results from minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section). The difference between the survey on May 20, 2021, and the earliest survey during flooding on July 22, 2011 (fig. 31), indicates about 76 percent of the joint area of interest had detectable change, which means about 24 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Deposition appears dominant throughout the reach between 2011 and 2021 in the DoD, with substantial localized erosion in the troughs of the medium to large dunes in the middle of the channel and downstream from
the spur dike on the downstream right (west) bank (fig. 31). The average difference between the bathymetric surfaces was +1.84 ft, and a net gain of sediment between 2011 and 2021 of about 79,800 yd3 further indicates substantial deposition in the reach between 2011 and 2021 (table 8). Nevertheless, the frequency distribution of bed elevations in 2021 appears similar in shape to 2011 above 585 ft; however, below about 585 ft, the 2011 distribution has a substantially higher percentage of cells for a given elevation (fig. 27). The vertically averaged velocity vectors indicate mostly uniform flow throughout the reach, ranging from about 4 to 9 ft/s, except downstream from the spur dikes on the right (west) bank and the boat ramp on the left (east) bank (fig. 32). The wake vortices downstream from piers 2 and 3 were not pronounced and seemed to be no greater than the general nonuniformity of flow observed in the channel (fig. 32). Minor localized turbulence again was present in all the sections (fig. 32).
A
A'
650
Column
625
600
Column
Column
Footing
Footing
Average water surface During 2021 survey (605.1 feet above NAVD 88) During 2017 survey (610.8 feet above NAVD 88) During 2013 survey (602.0 feet above NAVD 88) During 2011 survey (615.7 feet above NAVD 88)
Pier 4
Pier 3
Cap
Cap
Pier 2
Cap
Pier 1
675
Pier C
Elevation, in feet above North American Vertical Datum of 1988 (NAVD 88)
700
Cap
Column
Cap
Column
Lower column Footing Piles
Caisson
575
Caisson
Channel bed From 2021 survey From 2017 survey From 2013 survey From 2011 survey
550
200
Survey is along cross-section line shown in figure 26, facing downstream. 300
400
500
600
700
800
900
Distance from fill face of left (east) abutment, in feet
1,000
1,100
1,200
1,300
1,400
Substructural and superstructural details, approximate ground line, and top of bedrock line from 1922 bridge plans (Missouri Department of Transportation, written commun., 2002; 2011).
Part of bridge shown above
Figure 28. Key features, substructural and superstructural details, and surveyed channel bed of structure A3292 on State Highway 240 crossing the Missouri River at Glasgow, Missouri.
Results of Bathymetric and Velocimetric Surveys 45
525
Approximate ground line from 1922 bridge plans Approximate top of bedrock (from core logs)
46 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
'10"
'15"
3 9 °1 3
3 9 °1 3
'20"
Change in channel-bed elevation, in feet
Pier 1
Rock outcrop
Rock outcrop Rock outcrop
Sto
ne
rev
45
etm
ent
Bo
at r
am
p
30 20 15
"
92°50'55
10 7
Thalweg Railroad bridge pier
Pier 2
DEPOSITION
'25"
3 9 °1 3
3 9 °1 3
EXPLANATION
A
5 3 1 −1 −3 −5
FLOW
−10 −15
SCOUR
−7 Base of old railroad bridge pier
−20
"
92°51'00
Pier 3
−30
Railroad bridge pier
−45
$
No data, or outside 95-percent confidence interval
Railroad bridge pier
Pier 4
Spur dike
Spur dike
Base of old railroad bridge pier Sunken barge
"
92°51'05
Cross section shown in figure 28 A'
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
0 0
50
100 25
150 50
200
250 FEET 75 METERS
Figure 29. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure G0069 on State Highway 240 at Glasgow, Missouri, on May 20, 2021, and May 24, 2017, with probabilistic thresholding.
Results of Bathymetric and Velocimetric Surveys 47
'10"
'15"
3 9 °1 3
3 9 °1 3
'20"
Change in channel-bed elevation, in feet
Pier 1
Rock outcrop
Rock outcrop Rock outcrop
Sto
ne
rev
45
etm
ent
Bo
at r
am
p
30 20 15
"
92°50'55
10 7
Thalweg Railroad bridge pier
Pier 2
DEPOSITION
'25"
3 9 °1 3
3 9 °1 3
EXPLANATION
A
5 3 1 −1 −3 −5
FLOW
−10 −15
SCOUR
−7
−20
"
92°51'00
Pier 3
−30
Railroad bridge pier
−45
$
No data, or outside 95-percent confidence interval
Railroad bridge pier
Pier 4
Spur dike
Spur dike
Base of old railroad bridge pier Sunken barge
"
92°51'05
Cross section shown in figure 28 A'
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
0 0
50
100 25
150 50
200
250 FEET 75 METERS
Figure 30. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure G0069 on State Highway 240 at Glasgow, Missouri, on May 20, 2021, and April 26, 2013, with probabilistic thresholding.
48 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
'10"
'15"
3 9 °1 3
3 9 °1 3
'20"
Change in channel-bed elevation, in feet
Pier 1
Rock outcrop
Rock outcrop Rock outcrop
Sto
ne
rev
45
etm
ent
Bo
at r
am
p
30 20 15
"
92°50'55
10 7
Thalweg Railroad bridge pier
Pier 2
DEPOSITION
'25"
3 9 °1 3
3 9 °1 3
EXPLANATION
A
5 3 1 −1 −3 −5
FLOW
−10 −15
SCOUR
−7
−20
"
92°51'00
Pier 3
−30
Railroad bridge pier
−45
$
No data, or outside 95-percent confidence interval
Railroad bridge pier
Pier 4
Spur dike
Spur dike
Base of old railroad bridge pier Sunken barge
"
92°51'05
Cross section shown in figure 28 A'
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
0 0
50
100 25
150 50
200
250 FEET 75 METERS
Figure 31. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure G0069 on State Highway 240 at Glasgow, Missouri, on May 20, 2021, and July 22, 2011, with probabilistic thresholding.
Results of Bathymetric and Velocimetric Surveys 49
'10"
'15"
3 9 °1 3
3 9 °1 3
'20"
'25"
3 9 °1 3
3 9 °1 3
EXPLANATION
A Pier 1
Rock outcrop
Rock outcrop
Sto
Channel-bed elevation, in feet above the North American Vertical Datum of 1988 ne
rev
etm
ent
Rock outcrop
605
Bo
at r
am
p
600 595
"
92°50'55
Thalweg
Thalweg Railroad bridge pier
590
Pier 2
585 580 575 570
FLOW Medium to large dunes Medium to large dunes
565 560
"
92°51'00
Pier 3
555
$
Railroad bridge pier
Railroad bridge pier
Pier 4
Spur dike
Spur dike
Vertically averaged velocity, in feet per second
Base of old railroad bridge pier Sunken barge
"
92°51'05
Survey date May 20, 2021 Streamflow 102,000 cubic feet per second Average water-surface elevation 605.1 feet above NAVD 88 Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
Cross section shown in figure 28 A'
0 0
50
100 25
150 50
200
250 FEET 75 METERS
Figure 32. Bathymetry and vertically averaged velocities of the Missouri River channel near structure G0069 on State Highway 240 at Glasgow, Missouri.
0 to 1 >1 to 2 >2 to 3 >3 to 4 >4 to 5 >5 to 6 >6 to 7 >7 to 8 >8 to 9 >9 to 10 >10 to 11 >11 to 12
50 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
Structure A4574 on State Highway 5 at Boonville, Missouri Structure A4574 (site 18; table 2) on State Highway 5 crosses the Missouri River at RM 196.6 at Boonville, Mo., south of Glasgow and about halfway between Kansas City and St. Louis, Mo. (fig. 1). The site was surveyed on May 21, 2021, when the average water-surface elevation near the bridge, determined by the RTK GNSS tide solution, was 580.9 ft (table 6; fig. 33) and streamflow on the Missouri River was about 112,000 ft3/s during the survey (table 6). The survey area was about 1,640 ft long and about 1,300 ft wide, extending from bank to bank in the main channel (fig. 33). The upstream end of the survey area was about 620 ft upstream from the centerline of structure A4574, and piers 5 through 8 were in the water, although piers 5 and 8 were on the extreme edges of the surveyed area (fig. 33). The approximate channel-bed elevations ranged from about 555 to 567 ft for most of the surveyed area (5th to 95th percentile range of the bathymetric data; table 6; fig. 34) reaching a minimum elevation of 548 ft in the channel thalweg along the toe of the left (north) bank (fig. 33; table 6). The well-defined thalweg was present along the left (north) bank throughout the surveyed area and was about 8 to 10 ft deeper than the channel bed in the middle of the channel. Small to medium dune features with superimposed small dunes and ripples were present throughout the channel (fig. 33). The minor scour holes near piers 6 and 7 were difficult to discern from nearby dunes and ripples (figs. 33, 1.5B, 1.5C, 1.5D, 1.5E). Near pier 7, the scour hole had a minimum channel-bed elevation of about 556 ft (table 7), about 23 ft above the elevation of the bottom of the pier seal course of 533.00 ft and about 43 ft above the level of bedrock near that pier (fig. 35; table 7). The minor scour hole near pier 6 had a minimum channel-bed elevation of about 563 ft (table 7). Information from bridge plans indicates that pier 7 is founded on shafts drilled 39 ft into bedrock (fig. 35; table 7), whereas pier 6 is founded on a footing on bedrock, having about 12 ft of bed material between the bottom of the scour hole and bedrock (fig. 35; table 7). The surveyed bed was similar to the previous multibeam surveys in 2011, 2013, and 2017, with the 2021 bed oscillating between the bed in the previous surveys except between piers 7 and 8 where the bed was 5 to 7 ft lower in 2021 than in the previous surveys (fig. 35). The scour hole near pier 7 appears to penetrate to the top of the pier footing (figs. 33 and 35), which might provide some mitigation to the scour hole at this pier as the downward flow of the horseshoe vortex at the pier column face is blunted by the footing (Arneson and others, 2012). The difference between the survey on May 21, 2021, and the previous survey on May 25, 2017 (fig. 36), indicates about 85 percent of the joint area of interest had detectable change, which means about 15 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Deposition and erosion appear roughly balanced throughout the reach between 2017 and 2021 in
the DoD, except near the right (south) bank where erosion is more dominant (fig. 36). The average difference between the bathymetric surfaces was –0.44 ft (table 8), indicating minor channel degradation between the 2017 and 2021 surveys. The net volume of cut in the reach from 2017 to 2021 was about 77,500 yd3, and the net volume of fill was about 48,800 yd3, resulting in a net loss of about 28,700 yd3 of sediment between 2017 and 2021 (table 8). As indicated in the previous paragraph, the cross section from the 2021 survey along the upstream face of the bridge generally varies above and below the 2017 survey section (fig. 35). The frequency distribution of bed elevations in 2021 is remarkably similar in shape to all the previous surveys, with a slightly higher percentage of cells in the mid-range of channel-bed elevations (fig. 34). The stone revetment on the left (north) bank showed localized areas of erosion and deposition, but nearly all the indicated changes are within 1 ft of the 2017 elevation, or outside the 95-percent confidence interval (fig. 36). The difference between the survey on May 21, 2021, and the survey on April 29, 2013 (fig. 37), indicates only 64 percent of the joint area of interest had detectable change, which means about 36 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Areas of moderate deposition are balanced with areas of moderate erosion throughout most of the reach between 2013 and 2021 in the DoD, with erosion dominant on the right (south) side and deposition dominant near the tip of the upstream spur dike and in the downstream left (north) side of the channel (fig. 37). The average difference between the bathymetric surfaces was –0.54 ft (table 8), again indicating minor to moderate channel degradation between the 2013 and 2021 surveys, and the net loss of sediment between 2013 and 2021 was about 23,800 yd3, which is less than but consistent with the net loss of sediment between 2017 and 2021 (table 8). As mentioned in the previous paragraph, the frequency distribution of bed elevations in 2021 is remarkably similar in shape to the other surveys, but the 2013 survey distribution is spread over a slightly larger range of channel-bed elevations (fig. 34). The stone revetment on the left (north) bank showed localized areas of erosion and deposition (fig. 37); however, most of the area was equivocal, and the moderate apparent deposition likely results from minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section). The difference between the survey on May 21, 2021, and the earliest survey during flooding on July 25, 2011 (fig. 38), indicates about 76 percent of the joint area of interest had detectable change, which means about 24 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). As with the other comparisons, scour and deposition appear approximately balanced throughout the reach between 2011 and 2021 in the DoD, with more scour in the upstream part of the reach, and deposition in the downstream part of the reach (fig. 38). The average difference between the bathymetric surfaces was –0.53 ft (table 8), again indicating minor degradation between the 2011 and
A
Longitudinal spur dike
Stone revetment
Pier 8
4'30"
4'35"
92°4
"
92°4
4'40"
9'00
92°4
4'45"
38°5
92°4
4'50" 92°4
"
92°4
8'55
92°4
38°5
4'55"
5'00"
Results of Bathymetric and Velocimetric Surveys 51
EXPLANATION
Survey date May 21, 2021 Streamflow 112,000 cubic feet per second Average water-surface elevation 580.9 feet above NAVD 88
Channel-bed elevation, in feet above the North American Vertical Datum of 1988 585 580
5'00"
575 92°4
570
38°5
565
8'50
"
560
Pier 7
555 550
FLOW
545
38°5
area)
540
Spur
dike (
upstr eam f
rom s
"
$
Pier 6
urvey
8'45
Pier 5
Stone revetmen
t
Cross section shown in figure 35
0 0
50
100 25
Figure 33. Bathymetric survey of the Missouri River channel near structure A4574 on State Highway 5 at Boonville, Missouri.
150 50
200
250 FEET 75 METERS
92°4
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
4'25"
A'
52 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021 12
90 10
Percentage of total survey-grid cells
80 70
8
60 6
50 40
4 30 20
2
10 0 545
550
555
560
565
570
575
580
0 585
Cumulative percentage of survey-grid cells lower than indicated elevation
100
Elevation, in feet above the North American Vertical Datum of 1988 EXPLANATION
[ft3/s, cubic foot per second] Cumulative percentage
Frequency distribution 2021 survey data; 112,000 ft 3/s 3
2021 survey data; 112,000 ft 3/s
2017 survey data; 153,000 ft /s
2017 survey data; 153,000 ft 3/s
2013 survey data; 58,700 ft3/s
2013 survey data; 58,700 ft3/s
2011 survey data; 219,000 ft3/s
2011 survey data; 219,000 ft3/s
Figure 34. Frequency distribution of bed elevations for bathymetric survey-grid cells in 1-foot elevation bins on the Missouri River near structure A4574 on State Highway 5 at Boonville, Missouri, on May 21, 2021, compared to previous surveys in 2011, 2013, and 2017 (Huizinga, 2012, 2014, 2020a, respectively).
2021 surveys. There was a net loss of sediment between 2011 and 2021 of about 29,700 yd3 (table 8). The stone revetment and longitudinal spur dike on the left (north) bank showed substantial deposition (fig. 38), which may be the result of these features being repaired or otherwise built up after the 2011 flood. As with several previous DoDs, some of this apparent deposition may result from minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section).
The vertically averaged velocity vectors indicate mostly uniform flow with localized moderate turbulence throughout most of the reach, ranging from about 3 to 9 ft/s (fig. 39). Other exceptions to uniform conditions include variable velocities and flow reversal on the right (south) bank downstream from the upstream spur dike (fig. 39). All the piers were aligned with flow, as indicated by little to no turbulence observed downstream that can be directly attributed to the piers (fig. 39).
A
A'
625
Average water surface During 2021 survey (580.9 feet above NAVD 88) During 2017 survey (584.7 feet above NAVD 88) During 2013 survey (576.0 feet above NAVD 88) During 2011 survey (590.9 feet above NAVD 88)
Column
600
Column
Column
Cap
Pier 4
Cap
Pier 5
Cap
Pier 6
Cap
Pier 7
650 Pier 8
Elevation, in feet above North American Vertical Datum of 1988 (NAVD 88)
675
Column
Pedestal
575
Pedestal
Pedestal
550
Seal course
525 Drilled shafts
Approximate ground line from 1998 bridge plans
Footing
Channel bed From 2021 survey From 2017 survey From 2013 survey From 2011 survey
Footing
Pedestal
Footing
Footing
Seal course
Drilled shafts
500
Approximate top of bedrock (from core logs)
475
Survey is along cross-section line shown in figure 33, facing downstream. 800
900
1,000
1,100
1,200
1,300
1,400
1,500
1,600
Distance from fill face of left (north) abutment, in feet
1,700
1,800
1,900
2,000
2,100
2,200
Substructural and superstructural details, approximate ground line, and top of bedrock line from 1998 bridge plans (Missouri Department of Transportation, written commun., 2011).
Part of bridge shown above
Figure 35. Key features, substructural and superstructural details, and surveyed channel bed of structure A4574 on State Highway 5 crossing the Missouri River at Boonville, Missouri.
Results of Bathymetric and Velocimetric Surveys 53
450 700
4'30"
4'35"
92°4
"
92°4
4'40"
9'00
92°4
4'45"
38°5
92°4
4'50" 92°4
"
92°4
8'55
92°4
38°5
4'55"
5'00"
54 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
A
EXPLANATION Change in channel-bed elevation, in feet
Longitudinal spur dike
30
Stone revetment
Pier 8
20
10 7 92°4
5'00"
5
DEPOSITION
15
3 1
38°5
8'50
−1
"
−3 Pier 7
−5
−10
FLOW
−15
SCOUR
−7
−20 −30
38°5
area)
−45
Spur
dike (
upstr eam f
rom s
"
$
Pier 6
urvey
8'45
Pier 5
Stone revetmen
t
Cross section shown in figure 35
0 0
50
100 25
150 50
200
250 FEET 75 METERS
92°4
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
4'25"
A'
Figure 36. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A4574 on State Highway 5 at Boonville, Missouri, on May 21, 2021, and May 25, 2017, with probabilistic thresholding.
No data, or outside 95-percent confidence interval
4'30"
4'35"
92°4
"
92°4
4'40"
9'00
92°4
4'45"
38°5
92°4
4'50" 92°4
"
92°4
8'55
92°4
38°5
4'55"
5'00"
Results of Bathymetric and Velocimetric Surveys 55
A
EXPLANATION Change in channel-bed elevation, in feet
Longitudinal spur dike
30
Stone revetment
Pier 8
20
10 7 92°4
5'00"
5
DEPOSITION
15
3 1
38°5
8'50
−1
"
−3 Pier 7
−5
−10
FLOW
−15
SCOUR
−7
−20 −30
8'45
Spur dike ( u
pstre
am fr
om su
"
$
Pier 6
rvey a
38°5
rea)
−45
Pier 5
Stone revetmen
t
Cross section shown in figure 35
0 0
50
100 25
150 50
200
250 FEET 75 METERS
92°4
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
4'25"
A'
Figure 37. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A4574 on State Highway 5 at Boonville, Missouri, on May 21, 2021, and April 29, 2013, with probabilistic thresholding.
No data, or outside 95-percent confidence interval
4'30"
4'35"
92°4
"
92°4
4'40"
9'00
92°4
4'45"
38°5
92°4
4'50" 92°4
"
92°4
8'55
92°4
38°5
4'55"
5'00"
56 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
A
EXPLANATION Change in channel-bed elevation, in feet
Longitudinal spur dike
30
Stone revetment
Pier 8
20
10 7 92°4
5'00"
5
DEPOSITION
15
3 1
38°5
8'50
−1
"
−3 Pier 7
−5
−10
FLOW
−15
SCOUR
−7
−20 −30
8'45
Spur d
ike (u
pstre
am fr
om su
"
$
Pier 6
rvey a
38°5
rea)
−45
Pier 5
Stone revetmen
t
Cross section shown in figure 35
A'
0
50
100 25
150 50
200
250 FEET 75 METERS
4'25"
0
92°4
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
Figure 38. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A4574 on State Highway 5 at Boonville, Missouri, on May 21, 2021, and July 25, 2011, with probabilistic thresholding.
No data, or outside 95-percent confidence interval
A
Longitudinal spur dike
Stone revetment
Pier 8
4'30"
4'35"
92°4
"
92°4
4'40"
9'00
92°4
4'45"
38°5
92°4
4'50" 92°4
"
92°4
8'55
92°4
38°5
4'55"
5'00"
Results of Bathymetric and Velocimetric Surveys 57
EXPLANATION
Survey date May 21, 2021 Streamflow 112,000 cubic feet per second Average water-surface elevation 580.9 feet above NAVD 88
Channel-bed elevation, in feet above the North American Vertical Datum of 1988 585 580
92°4
5'00"
575
38°5
570 565
8'50
"
560
Pier 7
555
FLOW
550 545
38°5
area)
540
rom s
"
$
Pier 6
urvey
8'45
upstr eam f
Vertically averaged velocity, in feet per second
Spur
dike (
0 to 1 >1 to 2 >2 to 3 >3 to 4 >4 to 5 >5 to 6 >6 to 7 >7 to 8 >8 to 9 >9 to 10 >10 to 11 >11 to 12
Pier 5
Stone revetmen
t
Cross section shown in figure 35
0 0
50
100 25
150 50
200
250 FEET 75 METERS
Figure 39. Bathymetry and vertically averaged velocities of the Missouri River channel near structure A4574 on State Highway 5 at Boonville, Missouri.
92°4
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
4'25"
A'
58 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
Structure L0962 on Interstate 70 near Rocheport, Missouri Structure L0962 (site 19; table 2) on Interstate 70 crosses the Missouri River at RM 185.1 near Rocheport, Mo., east of Boonville and west of St. Louis, Mo. (fig. 1). The site was surveyed on May 21, 2021, when the average water-surface elevation of the river in the survey area, determined by the RTK GNSS tide solution, was 571.1 ft (table 6; fig. 40) and streamflow on the Missouri River was about 110,000 ft3/s during the survey (table 6). The survey area was about 1,640 ft long and about 1,200 ft wide, extending essentially from bank to bank in the main channel (fig. 40). The upstream end of the survey area was about 580 ft upstream from the centerline of structure L0962 (fig. 40), and piers 13 and 14 as well as bent 16 were in the water. The channel-bed elevations ranged from about 541 to 559 ft for most of the surveyed area (5th to 95th percentile range of the bathymetric data; fig. 41; table 6). A poorly defined thalweg was present along the left (northeast) bank, and a series of medium dunes were detected along the middle of the channel, with numerous small dunes and ripples throughout the rest of the channel (fig. 40). The persistent debris raft near bent 16 in previous surveys was not present in 2021, which permitted bathymetric data to be collected near that bent (fig. 40). A moderate scour hole near pier 14 had a minimum channel-bed elevation of about 531 ft (fig. 40; table 7), which is about 17 ft below the average channel-bed elevation upstream from the bridge (figs. 42, 1.6E, 1.6F; table 7). Information from bridge plans indicates that pier 14 is founded on a caisson on bedrock, having about 33 ft of bed material between the bottom of the scour hole and bedrock (fig. 42; table 7). The surveyed bed in 2021 generally was similar to the previous multibeam surveys between pier 14 and the right (southwest) bank, but there was substantial erosion between the left (northeast) bank and pier 15, and substantial deposition of as much as 20 ft between piers 14 and 15 (fig. 42). Pier 15 is embedded in the longitudinal spur dike, and the minimum channel elevation at the toe of the dike near the pier was about 538 ft (figs. 42, 1.6C, 1.6D; table 7). Pier 15 also is founded on a caisson on bedrock, having about 19 ft of material between the minimum channel-bed elevation and bedrock (fig. 42; table 7); however, the rock of the spur dike will limit or prevent a local scour hole near pier 15. Near bent 16, the minimum channel-bed elevation also was about 538 ft (figs. 42, 1.6B; table 7), about 5 ft below the average channel bed upstream from the scour hole, and only about 2 ft above the elevation of bedrock near that bent (fig. 42; table 7). Information from bridge plans indicates that bent 16 is founded on a footing on bedrock (fig. 42; table 7). In modern construction, bridge substructural elements usually are pinned or socketed to bedrock (Brown and others, 2018; American Association of State Highway Transportation Officials, 2020), but full exposure of usually buried substructural elements warrants special consideration and observation.
The difference between the survey on May 21, 2021, and the previous survey on May 25, 2017 (fig. 43), indicates about 91 percent of the joint area of interest had detectable change, which means only about 9 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Deposition appears dominant throughout most of the reach between 2017 and 2021 in the DoD, except in localized troughs in the medium dune features in the upstream part of the reach and downstream from the spur dikes on both banks (fig. 43). Substantial erosion of as much as 45 ft was observed near pier 15 and bent 16 (fig. 43). The average difference between the bathymetric surfaces was +1.59 ft (table 8), indicating moderate channel aggradation between the 2017 and 2021 surveys. The net volume of cut in the reach from 2017 to 2021 was about 77,300 yd3, and the net volume of fill was about 177,500 yd3, resulting in a net gain of about 100,200 yd3 of sediment between 2017 and 2021 (table 8). The frequency distribution of bed elevations in 2021 is somewhat unique (fig. 41); similar in overall shape to 2017 (and the others), but with a 3–5-ft shift towards higher elevations at the centroid of the elevation distribution. The longitudinal spur dikes along the left (northeast) bank showed minor to moderate scour on one side and deposition on the other (fig. 43); however, deposition or scour apparent on opposing faces of a feature likely results from minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section). The difference between the survey on May 21, 2021, and the survey on April 29, 2013 (fig. 44), indicates about 72 percent of the joint area of interest had detectable change, which means about 28 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Deposition again appears dominant throughout most of the reach between 2013 and 2021 in the DoD, except for localized substantial erosion downstream from the longitudinal spur dikes on the left (northeast) bank and in the troughs in the medium dune features along the upstream middle of the channel (fig. 44). The average difference between the bathymetric surfaces was +2.74 ft (table 8), indicating moderate to substantial channel aggradation between the 2013 and 2021 surveys with a net gain of sediment between 2013 and 2021 of about 111,500 yd3 (table 8). As with 2017, the frequency distribution of bed elevations in 2021 has an almost 5-ft shift towards higher elevations at the centroid of the elevation distribution compared to 2013 (fig. 41). The difference in the distribution likely is the result of the substantially narrower survey area in 2013, and general lack of bank information (fig. 44). The longitudinal spur dikes along the left (northeast) bank showed minor scour on the side that could be surveyed in 2013, but much of the difference is equivocal, and substantial areas behind the spur dikes were not surveyed in 2013 (fig. 44). The difference between the survey on May 21, 2021, and the earliest survey during flooding on July 26, 2011 (fig. 45), indicates about 82 percent of the joint area of interest had detectable change, which means about 18 percent of the differences in the joint area of interest are equivocal and within the
°3
92
°3
2'4
0"
92
°3
2'3
5"
92
38 °57 '30 "
92
38 °57 '35 "
Results of Bathymetric and Velocimetric Surveys 59
2'3
0"
°3
2'2
5"
Survey date May 21, 2021 Streamflow 110,000 cubic feet per second Average water-surface elevation 571.1 feet above NAVD 88
A
EXPLANATION Channel-bed elevation, in feet above the North American Vertical Datum of 1988 580
Bent 16 2'4
Pier 15
38 °57 '45 "
Longitudinal spur dike
570 565
dike
dike
5"
r Spu
°3
r Spu
92
575
560
Longitudinal spur dike Longitudinal spur dike
555 550 545 540 535 530
FLOW 92
°3
525 520
2'5
0"
515 510
2'5
38
°57
5"
"
°3
'40
92
Spur dike
$
Pier 14
Cross section shown in figure 42
Figure 40. Bathymetric survey of the Missouri River channel near structure L0962 on Interstate 70 near Rocheport, Missouri.
50
75 METERS
"
250 FEET
'20
200
°57
25
150
'25
100
38
0
50
°57
0
38
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
"
A'
60 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021 12
90 10
Percentage of total survey-grid cells
80 70
8
60 6
50 40
4 30 20
2
10 0 515
520
525
530
535
540
545
550
555
560
565
570
0 575
Cumulative percentage of survey-grid cells lower than indicated elevation
100
Elevation, in feet above the North American Vertical Datum of 1988 EXPLANATION
[ft3/s, cubic foot per second] Cumulative percentage
Frequency distribution 2021 survey data; 110,000 ft 3/s 3
2021 survey data; 110,000 ft 3/s
2017 survey data; 155,000 ft /s
2017 survey data; 155,000 ft 3/s
2013 survey data; 63,400 ft3/s
2013 survey data; 63,400 ft3/s
2011 survey data; 219,000 ft3/s
2011 survey data; 219,000 ft3/s
Figure 41. Frequency distribution of bed elevations for bathymetric survey-grid cells in 1-foot elevation bins on the Missouri River near structure L0962 on Interstate 70 near Rocheport, Missouri, on May 21, 2021, compared to previous surveys in 2011, 2013, and 2017 (Huizinga, 2012, 2014, 2020a, respectively).
bounds of uncertainty (table 8). Scour and deposition appear approximately balanced in the reach between 2011 and 2021 in the DoD (fig. 45), with substantial deposition in the thalweg and some areas downstream from the spur dikes on both banks balanced by substantial erosion in the upstream middles of the channel and near pier 15 and bent 16. However, the average difference between the 2011 and 2021 bathymetric surfaces was +2.47 ft (table 8), indicating moderate to substantial channel aggradation with a net gain of sediment between 2011 and 2021 of about 137,200 yd3 (table 8). The frequency distribution of bed elevations in 2021 is most similar to the 2011 distribution above 547 ft, but the 2011 distribution has a higher percentage of cells at a lower channel-bed elevation, particularly below about 545 ft (fig. 41). The longitudinal spur dikes along the left (northeast) bank again showed minor to
moderate scour on one side and deposition on the other, as does pier 14 (fig. 45); however, deposition or scour apparent on opposing faces of a feature likely results from minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section). The vertically averaged velocity vectors indicate mostly uniform flow throughout the channel, ranging from about 3 to 10 ft/s (fig. 46), with locally lower velocities and flow reversal along the banks, particularly downstream from the various spur dikes in the reach. Pier 14 was mostly aligned with flow, causing minimal turbulence downstream (fig. 46); however, flow approached pier 14 from the left side (fig. 46), causing an asymmetric scour hole that is longer and slightly deeper on the left side, similar to observations from previous surveys (fig. 40).
A
A'
600
Column
Cap
Column
Cap
Average water surface During 2021 survey (571.1 feet above NAVD 88) During 2017 survey (574.7 feet above NAVD 88) During 2013 survey (566.5 feet above NAVD 88) During 2011 survey (580.9 feet above NAVD 88)
Column
Cap
Pier 13
625
Pier 14
Cap
Pier 15
Bent 16
Bent 17
Elevation, in feet above North American Vertical Datum of 1988 (NAVD 88)
650
Column
Approximate ground line 2002 survey
Cap
Column
575 Pedestal
Pedestal
Pedestal
550
Approximate ground line from 1957 bridge plans
Footing
Footing
Channel bed From 2021 survey From 2017 survey From 2013 survey From 2011 survey
Caisson
525
Caisson
500
Caisson
Approximate top of bedrock (from core logs)
200
300
400
500
600
700
800
900
1,000
Distance from fill face of left (northeast) abutment, in feet
1,100
1,200
1,300
1,400
1,500
1,600
Substructural and superstructural details, approximate ground line, and top of bedrock line from 1957 bridge plans (Missouri Department of Transportation, written commun., 2002).
Part of bridge shown above
Figure 42. Key features, substructural and superstructural details, and surveyed channel bed of structure L0962 on Interstate 70 crossing the Missouri River near Rocheport, Missouri.
Results of Bathymetric and Velocimetric Surveys 61
Survey is along cross-section line shown in figure 40, facing downstream. 475 100
°3
92
°3
2'4
0"
92
°3
2'3
5"
92
38 °57 '30 "
92
38 °57 '35 "
62 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
2'3
0"
°3
2'2
5"
A
EXPLANATION Change in channel-bed elevation, in feet 45 30
Bent 16 2'4
Pier 15
38 °57 '45 "
Longitudinal spur dike
15 10
dike
dike
5"
Longitudinal spur dike
7 Longitudinal spur dike
DEPOSITION
20 r Spu
°3
r Spu
92
5 3 1 −1 −3 −5
92
°3
−10 −15
2'5
0"
SCOUR
−7
FLOW
−20 −30 Pier 14
−45
2'5
38
°57
5"
"
°3
'40
92
Spur dike
$
No data, or outside 95-percent confidence interval
Cross section shown in figure 42
50
75 METERS
"
250 FEET
'20
200
°57
25
150
'25
100
38
0
50
°57
0
38
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
"
A'
Figure 43. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure L0962 on Interstate 70 near Rocheport, Missouri, on May 21, 2021, and May 25, 2017, with probabilistic thresholding.
°3
92
°3
2'4
0"
92
°3
2'3
5"
92
38 °57 '30 "
92
38 °57 '35 "
Results of Bathymetric and Velocimetric Surveys 63
2'3
0"
°3
2'2
5"
A
EXPLANATION Change in channel-bed elevation, in feet 45
2'4
Pier 15
38 °57 '45 "
Longitudinal spur dike
30
15
20
10
dike
dike
5"
Area not surveyed in 2013
Longitudinal spur dike
7 Longitudinal spur dike
DEPOSITION
°3
r Spu
92
Bent 16
r Spu
Area not surveyed in 2013
Area not surveyed in 2013
5 3 1 −1 −3 −5
92
°3
−10 −15
2'5
0"
SCOUR
−7
FLOW
−20 −30 Pier 14
−45
2'5
38
°57
5"
"
°3
'40
92
Spur dike
$
No data, or outside 95-percent confidence interval
Area not surveyed in 2013
Cross section shown in figure 42
50
75 METERS
"
250 FEET
'20
200
°57
25
150
'25
100
38
0
50
°57
0
38
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
"
A'
Figure 44. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure L0962 on Interstate 70 near Rocheport, Missouri, on May 21, 2021, and April 29, 2013, with probabilistic thresholding.
°3
92
°3
2'4
0"
92
°3
2'3
5"
92
38 °57 '30 "
92
38 °57 '35 "
64 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
2'3
0"
°3
2'2
5"
A
EXPLANATION Change in channel-bed elevation, in feet 45 30
Bent 16 2'4
Pier 15
38 °57 '45 "
Longitudinal spur dike
15 10
dike
dike
5"
Longitudinal spur dike
7 Longitudinal spur dike
DEPOSITION
20 r Spu
°3
r Spu
92
5 3 1 −1 −3 −5
92
°3
−10 −15
2'5
0"
SCOUR
−7
FLOW
−20 −30 Pier 14
−45
2'5
38
°57
5"
"
°3
'40
92
Spur dike
$
No data, or outside 95-percent confidence interval
Cross section shown in figure 42
50
75 METERS
"
250 FEET
'20
200
°57
25
150
'25
100
38
0
50
°57
0
38
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
"
A'
Figure 45. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure L0962 on Interstate 70 near Rocheport, Missouri, on May 21, 2021, and July 26, 2011, with probabilistic thresholding.
°3
92
°3
2'4
0"
92
°3
2'3
5"
92
38 °57 '30 "
92
38 °57 '35 "
Results of Bathymetric and Velocimetric Surveys 65
2'3
0"
°3
2'2
5"
Survey date May 21, 2021 Streamflow 110,000 cubic feet per second Average water-surface elevation 571.1 feet above NAVD 88
A
EXPLANATION Channel-bed elevation, in feet above the North American Vertical Datum of 1988 580
Bent 16 2'4
Pier 15
38 °57 '45 "
Longitudinal spur dike
570 565
dike
dike
5"
r Spu
°3
r Spu
92
575
560
Longitudinal spur dike Longitudinal spur dike
555 550 545 540 535 530
FLOW 92
°3
525 520
2'5
0"
515 510
$
Pier 14
Spur dike 2'5
38
°57
5"
"
°3
0 to 1 >1 to 2 >2 to 3 >3 to 4 >4 to 5 >5 to 6 >6 to 7 >7 to 8 >8 to 9 >9 to 10 >10 to 11 >11 to 12
'40
92
Vertically averaged velocity, in feet per second
Cross section shown in figure 42
50
75 METERS
Figure 46. Bathymetry and vertically averaged velocities of the Missouri River channel near structure L0962 on Interstate 70 near Rocheport, Missouri.
"
250 FEET
'20
200
°57
25
150
'25
100
38
0
50
°57
0
38
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
"
A'
66 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
Structures L0550 and A4497 on U.S. Highway 54 at Jefferson City, Missouri Structures L0550 and A4497 (site 20; table 2) are dual bridges on U.S. Highway 54 crossing the Missouri River at RM 143.9 at Jefferson City, Mo., southeast of Rocheport and west of St. Louis, Mo. (fig. 1). The site was surveyed on May 26, 2021, when the average water-surface elevation of the river in the survey area, determined by the RTK GNSS tide solution, was 534.2 ft (table 6; fig. 47) and streamflow on the Missouri River was about 95,700 ft3/s during the survey (table 6). This site has been the subject of several multibeam surveys (Huizinga, 2014) that provide bathymetry at a variety of flow conditions for comparison. Furthermore, scour countermeasures in the form of a riprap blanket were placed around pier 4 of structures L0550 and A4497 in 2015, and the site near the piers was surveyed before and after the installation of these countermeasures (Huizinga, 2020a). The survey area was about 1,640 ft long and about 970 ft wide from bank to bank in the main channel (fig. 47). The upstream end of the survey area was about 630 ft upstream from the centerline between structures L0550 and A4497, and piers 3 and 4 of both structures were in the water, although pier 3 was on the extreme edge of the surveyed area on the right (south) bank (fig. 47). The channel-bed elevations ranged from about 504 to 521 ft for most of the surveyed area (5th to 95th percentile range of the bathymetric data; fig. 48; table 6), except along the toe of the right (south) bank, on the upper banks, and near the spur dikes on the left and right sides of the channel (fig. 47; table 6). A shallow thalweg was present along the right (south) bank throughout the reach and was about 5 to 8 ft deeper than the channel bed in the middle of the channel (fig. 47). Small dunes and ripples were present throughout the survey reach (fig. 47). As in previous surveys (Huizinga, 2012, 2014, 2022a), stone revetment was present on the right (south) bank throughout the reach (fig. 47). The scour holes that historically had been observed near pier 4 of both structures before 2015 (refer to fig. 31 in Huizinga, 2014) were conspicuously absent in the 2021 survey, having been effectively mitigated by the scour countermeasures installed around the piers in 2015 (figs. 47, 1.7A, 1.7B). The top of the riprap blanket countermeasure was evident around both piers in 2021 but appeared to have settled by 5 to 10 ft at the upstream end (figs. 47, 49, 1.7A, 1.7B), resulting in a shallow scour hole with a minimum channel-bed elevation of about 503 ft around the upstream perimeter of the blanket (fig. 47; table 7). Information from bridge plans indicates that pier 4 of upstream structure L0550 is founded on a caisson on bedrock, having about 44 ft of bed material between the channel bed near the pier and bedrock (fig. 49; table 7). Pier 4 of structure A4497 is founded on shafts drilled 11 ft into bedrock, having about 50 ft of bed material between the channel bed near the pier and bedrock (fig. 50; table 7). The surveyed bed generally was similar to the previous multibeam survey in 2017 (figs. 49 and 50).
The difference between the survey on May 26, 2021, and the previous survey on May 31, 2017 (fig. 51), indicates about 77 percent of the joint area of interest had detectable change, which means about 23 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Erosion appears dominant throughout most of the reach between 2017 and 2021 in the DoD, except in localized troughs of dune features on the left (northeast) side of the channel, and in the thalweg along the right (southwest) bank (fig. 51). The average difference between the bathymetric surfaces was –0.35 ft (table 8), indicating minor channel degradation between the 2017 and 2021 surveys. The net volume of cut in the reach from 2017 to 2021 was about 50,400 yd3, and the net volume of fill was about 34,300 yd3, resulting in a net loss of about 16,100 yd3 of sediment between 2017 and 2021 (table 8). The frequency distribution of bed elevations in 2021 is similar in shape to 2017, but with a higher percentage of cells in the mid-range of channel-bed elevations between 505 and 515 ft (fig. 48). The upstream and right edges of the riprap blanket around the piers showed erosion of 5 to 10 ft, and other localized erosion was evident on the top of the blanket (fig. 51); furthermore, the stone revetment along the right (southwest) bank also showed localized signs of minor scour and deposition (fig. 51); however, the apparent scour and deposition of the revetement and top of the riprap blanket may be the result of minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section). The difference between the survey on May 26, 2021, and the survey on April 30, 2013 (fig. 52), indicates about 62 percent of the joint area of interest had detectable change, which means about 38 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Deposition appears dominant throughout most of the reach between 2013 and 2021 in the DoD, except for moderate to substantial erosion along the left (northeast) bank (fig. 52). The average difference between the bathymetric surfaces was +0.49 ft (table 8), indicating minor channel aggradation between the 2013 and 2021 surveys, and there was a net gain of about 17,400 yd3 of sediment between 2013 and 2021 (table 8). The frequency distribution of bed elevations in 2021 is again similar in shape to 2013, but with a slightly higher percentage of cells in the mid-range of channel-bed elevations between 505 and 515 ft (fig. 48); furthermore, the centroid of the 2013 distribution is shifted about 2 ft lower than the 2021 distribution below 514 ft. The stone revetment along the right (southwest) bank also showed very localized signs of minor scour and deposition (fig. 52); however, the differences of most of the channel near the revetment were equivocal. As with previous DoDs, deposition or scour apparent on opposing faces of a feature likely results from minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section). The difference between the survey on May 21, 2021, and the survey during flooding on July 27, 2011 (fig. 53), indicates about 83 percent of the joint area of interest had detectable change, which means about 17 percent of the differences in
Results of Bathymetric and Velocimetric Surveys 67 92°
30"
35"
25"
10'
10'
10'
92°
92°
40"
45"
10'
10'
92°
92°
A
Survey date May 26, 2021 Streamflow 95,700 cubic feet per second Average water-surface elevation 534.2 feet above NAVD 88
B
EXPLANATION Channel-bed elevation, in feet above the North American Vertical Datum of 1988 540
mp ra at Bo
535 530 525
92°
Spur dike
520
10'
515
50"
510 505 500 495
0"
490
'2
°35
38
485 480 475
FLOW
470
A4497 pier 4
L0550 pier 4
465 460
Approximate apparent boundary of riprap blanket
92° 55" 10'
L0550 pier 3
A4497 pier 3
" '15
°35
38
Stone revetment
Cross section shown in figure 49
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
Stone revetment
B' "
'10
°35
Longitudinal dike
Cross section shown in figure 50
A'
38
$
0 0
50
100 25
150 50
200
250 FEET 75 METERS
Figure 47. Bathymetric survey of the Missouri River channel near structures L0550 and A4497 on U.S. Highway 54 at Jefferson City, Missouri.
"
'05
°35
38
9
90
8
80
7
70
6
60
5
50
4
40
3
30
2
20
1
10
0 470
475
480
485
490
495
500
505
510
515
520
525
530
535
0 540
Cumulative percentage of survey-grid cells lower than indicated elevation
Percentage of total survey-grid cells
100
Elevation, in feet above the North American Vertical Datum of 1988 EXPLANATION
[ft3/s, cubic foot per second] Frequency distribution
Cumulative percentage
2021 survey data; 95,700 ft 3/s
2021 survey data; 95,700 ft 3/s
2017 survey data; 125,000 ft 3/s
2017 survey data; 125,000 ft 3/s
2013 survey data; 62,500 ft3/s
2013 survey data; 62,500 ft3/s
2011–07 survey data; 219,000 ft3/s
2011–07 survey data; 219,000 ft3/s
2011–03 survey data; 145,000 ft3/s
2011–03 survey data; 145,000 ft3/s
3
2010 survey data; 155,000 ft /s
2010 survey data; 155,000 ft3/s
Figure 48. Frequency distribution of bed elevations for bathymetric survey-grid cells in 1-foot elevation bins on the Missouri River near structures L0550 and A4497 on U.S. Highway 54 at Jefferson City, Missouri, on May 26, 2021, compared to previous surveys in 2010, 2011, 2013, and 2017 (Huizinga, 2012, 2014, 2020a, respectively).
68 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
10
Pier 4
600
A'
575 Column
550
Pier 3
A
Pier 5
Elevation, in feet above North American Vertical Datum of 1988 (NAVD 88)
625
Approximate ground line from survey in 2002
Average water surface During May 2021 survey (534.2 feet above NAVD 88) During May 2017 survey (537.0 feet above NAVD 88) During April 2013 survey (530.3 feet above NAVD 88) During July 2011 survey (544.7 feet above NAVD 88) During March 2011 survey (540.0 feet above NAVD 88) During January 2010 survey (540.1 feet above NAVD 88)
Column
Column
Ice breaker
Ice breaker Ice breaker
525
Footing
Approximate ground line from 1971 bridge plans Channel bed from May 2021 multibeam survey Channel bed from May 2017 multibeam survey Channel bed from April 2013 multibeam survey Channel bed from July 2011 multibeam survey Channel bed from March 2011 multibeam survey Channel bed from January 2010 multibeam survey
500 Caisson
475
Caisson
Approximate top of bedrock (from core logs) 450
Survey is along cross-section line shown in figure 47, facing downstream. 1,900
2,000
2,100
2,200
2,300
2,400
2,500
Distance from fill face of left (northeastern) abutment, in feet
2,600
2,700
2,800
2,900
3,000
Substructural and superstructural details, approximate ground line, and top of bedrock line from 1971 bridge plans (Missouri Department of Transportation, written commun., 2002).
Part of bridge shown above
Figure 49. Key features, substructural and superstructural details, and surveyed channel bed of upstream structure L0550 on U.S. Highway 54 crossing the Missouri River at Jefferson City, Missouri.
Results of Bathymetric and Velocimetric Surveys 69
425 1,800
B'
575 Column
Approximate ground line from survey in 2002
Pier 3
Pier 4
Pier 5
Elevation, in feet above North American Vertical Datum of 1988 (NAVD 88)
600 Average water surface During May 2021 survey (534.2 feet above NAVD 88) During May 2017 survey (537.0 feet above NAVD 88) During April 2013 survey (530.3 feet above NAVD 88) During July 2011 survey (544.7 feet above NAVD 88) During March 2011 survey (540.0 feet above NAVD 88) During January 2010 survey (540.1 feet above NAVD 88)
Column
Column
550 Footing
525
Seal course
Approximate ground line from 1987 bridge plans
Ice breaker
Ice breaker
Footing Footing
475
Seal course
Channel bed from May 2021 multibeam survey Channel bed from May 2017 multibeam survey Channel bed from April 2013 multibeam survey Channel bed from July 2011 multibeam survey Channel bed from March 2011 multibeam survey Channel bed from January 2010 multibeam survey
500
Drilled shafts
Drilled shafts
Approximate top of bedrock (from core logs) 450
Survey is along cross-section line shown in figure 47, facing downstream. 425 1,800
1,900
2,000
2,100
2,200
2,300
2,400
2,500
Distance from fill face of left (northeastern) abutment, in feet
2,600
2,700
2,800
2,900
3,000
Substructural and superstructural details, approximate ground line, and top of bedrock line from 1987 bridge plans (Missouri Department of Transportation, written commun., 2002).
Part of bridge shown above
Figure 50. Key features, substructural and superstructural details, and surveyed channel bed of downstream structure A4497 on U.S. Highway 54 crossing the Missouri River at Jefferson City, Missouri.
70 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
B
625
Results of Bathymetric and Velocimetric Surveys 71 92°
30"
35"
25"
10'
10'
10'
92°
92°
40"
45"
10'
10'
92°
92°
A
EXPLANATION
B
Change in channel-bed elevation, in feet 60
mp ra at Bo
45 30
15
Spur dike
92°
DEPOSITION
20
10
10'
7
50"
5 3 1 −1
"
0 5'2
°3
38
−3 −5
−10
FLOW
−15
A4497 pier 4
L0550 pier 4
−20 −30
Approximate apparent boundary of riprap blanket
−45 No data, or outside 95-percent confidence interval
$
92° 55" 10'
L0550 pier 3
A4497 pier 3
" '15
°35
38
Stone revetment
Cross section shown in figure 49
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
Stone revetment
B' "
'10
°35
38
Longitudinal dike
Cross section shown in figure 50
A'
0 0
SCOUR
−7
50
100 25
150 50
200
250 FEET 75 METERS
"
'05
°35
38
Figure 51. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structures L0550 and A4497 on U.S. Highway 54 at Jefferson City, Missouri, on May 26, 2021, and May 31, 2017, with probabilistic thresholding.
72 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021 92°
30"
35"
25"
10'
10'
10'
92°
92°
40"
45"
10'
10'
92°
92°
A
EXPLANATION
B
Change in channel-bed elevation, in feet 60
mp ra at Bo
45 30
15
Spur dike
92°
DEPOSITION
20
10
10'
7
50"
5 3 1 −1
"
0 5'2
°3
38
−3 −5
−10
FLOW
−15
A4497 pier 4
L0550 pier 4
SCOUR
−7
−20 −30 −45 No data, or outside 95-percent confidence interval
$
92° 55" 10'
L0550 pier 3
A4497 pier 3
" '15
°35
38
Stone revetment
Cross section shown in figure 49
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
B' "
'10
°35
Stone revetment
Cross section shown in figure 50
A'
38
Longitudinal dike
0 0
50
100 25
150 50
200
250 FEET 75 METERS
"
'05
°35
38
Figure 52. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structures L0550 and A4497 on U.S. Highway 54 at Jefferson City, Missouri, on May 26, 2021, and April 30, 2013, with probabilistic thresholding.
Results of Bathymetric and Velocimetric Surveys 73 92°
30"
35"
25"
10'
10'
10'
92°
92°
40"
45"
10'
10'
92°
92°
A
EXPLANATION
B
Change in channel-bed elevation, in feet 60
mp ra at Bo
45 30
15
Spur dike
92°
DEPOSITION
20
10
10'
7
50"
5 3 1 −1
"
0 5'2
°3
38
−3 −5
−10
FLOW
−15
A4497 pier 4
L0550 pier 4
SCOUR
−7
−20 −30 −45 No data, or outside 95-percent confidence interval
$
92° 55" 10'
L0550 pier 3
A4497 pier 3
" '15
°35
38
Stone revetment
Cross section shown in figure 49
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
B' "
'10
°35
Stone revetment
Cross section shown in figure 50
A'
38
Longitudinal dike
0 0
50
100 25
150 50
200
250 FEET 75 METERS
"
'05
°35
38
Figure 53. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structures L0550 and A4497 on U.S. Highway 54 at Jefferson City, Missouri, on May 26, 2021, and July 27, 2011, with probabilistic thresholding.
74 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021 the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Deposition appears dominant in the reach between 2011 and 2021 in the DoD (fig. 53), with substantial deposition of as much as 45 ft in the historical scour hole near pier 4 of both structures. Alternatively, substantial erosion of as much as 20 ft was apparent along the left (northeast) bank (fig. 53). Nevertheless, the average difference between the 2011 and 2021 bathymetric surfaces was +4.52 ft (table 8) with a net gain of sediment between 2011 and 2021 of about 221,100 yd3 (table 8), both of which are by far the largest positive changes observed in the 2021 surveys compared to previous surveys. The frequency distribution of bed elevations in 2011 is unique compared to the other distributions at this site, with a substantially higher percentage of cells at lower channel-bed elevations (fig. 48). The stone revetment along the right (southwest) bank again showed very localized signs of minor scour and deposition (fig. 53); however, the differences of most of the channel near the revetment were equivocal. As with previous DoDs, deposition or scour apparent on opposing faces of a feature likely results from minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section). The difference between the survey on May 21, 2021, and an earlier survey on March 1, 2011 (fig. 54), indicates about 72 percent of the joint area of interest had detectable change, which means about 28 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Deposition appears dominant in the reach between March 2011 and 2021 in the DoD (fig. 54), with substantial deposition of as much as 45 ft in the historical scour hole near pier 4 of both structures, but moderate erosion of as much as 15 ft along the left (northeast) bank. However, the average difference between the March 2011 and 2021 bathymetric surfaces was +1.27 ft (table 8), indicating moderate channel aggradation with a net gain of sediment between March 2011 and 2021 of about 45,400 yd3 (table 8). As in the other comparisons at this site, the stone revetment along the
right (southwest) bank again showed very localized signs of minor scour and deposition (fig. 54); however, the differences of most of the channel near the revetment were equivocal. As with previous DoDs, deposition or scour apparent on opposing faces of a feature likely results from minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section). The difference between the survey on May 21, 2021, and the earliest survey on January 16, 2010 (fig. 55), indicates about 73 percent of the joint area of interest had detectable change, which means about 27 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Despite substantial deposition of as much as 60 ft in the historical scour hole near pier 4 of both bridges, erosion appears dominant in the reach between 2010 and 2021 in the DoD (fig. 55). The average difference between the 2010 and 2021 bathymetric surfaces was –1.21 ft (table 8), indicating moderate channel degradation with a net loss of sediment between 2010 and 2021 of about 45,200 yd3 (table 8). Once again, the stone revetment along the right (southwest) bank again showed very localized signs of minor scour and deposition (fig. 54); however, the differences of most of the channel near the revetment were equivocal. As with previous DoDs, deposition or scour apparent on opposing faces of a feature likely results from minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section). The vertically averaged velocity vectors indicate mostly uniform flow throughout the channel, ranging from about 3 to 9 ft/s (fig. 56), with locally lower velocities and flow reversal along the banks downstream from the various spur dikes in the reach. Pier 4 of both structures are mostly aligned with flow but cause moderate turbulence downstream (fig. 56). However, flow velocities seemed unusually variable in all the transects (fig. 56), which is unusual given the general lack of spur dikes and substantial dune features that might cause flow divergence or upwelling in the reach (Best, 2005).
Results of Bathymetric and Velocimetric Surveys 75
92° 25"
35"
30"
10'
10'
10'
92°
92°
40"
45"
10'
10'
92°
92°
A
EXPLANATION
B
Change in channel-bed elevation, in feet 60
mp ra at Bo
45 30
15
Spur dike
92°
DEPOSITION
20
10
10' 50"
Area not surveyed in March 2011
7 5 3 1 −1
"
0 5'2
°3
38
−3 −5
−10
FLOW
−15
A4497 pier 4
L0550 pier 4
SCOUR
−7
−20 −30 −45
Area not surveyed in March 2011
Stone revetment 92° 55" 10' "
'15
°35
38
Area not surveyed in March 2011
L0550 pier 3
Cross section shown in figure 49
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
A4497 pier 3
B' "
'10
°35
Stone revetment
Cross section shown in figure 50
A'
38
Longitudinal dike
Area not surveyed in March 2011
0 0
50
100 25
150 50
200
250 FEET 75 METERS
"
'05
°35
38
Figure 54. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structures L0550 and A4497 on U.S. Highway 54 at Jefferson City, Missouri, on May 26, 2021, and March 1, 2011, with probabilistic thresholding.
No data, or outside 95-percent confidence interval
$
76 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021 92° 25"
35"
30"
10'
10'
10'
92°
92°
40"
45"
10'
10'
92°
92°
A
EXPLANATION
B
Change in channel-bed elevation, in feet
Area not surveyed in 2010
60
mp ra at Bo
45 30
15
Spur dike
92°
DEPOSITION
20
10
10' 50"
Area not surveyed in 2010
7 5 3 1
°3
38
−1
"
0 5'2
−3 −5
−10
FLOW
−15
A4497 pier 4
L0550 pier 4
SCOUR
−7
−20 −30 −45
Area not surveyed in 2010
92° 55" 10'
Stone revetment
L0550 pier 3
A4497 pier 3
" '15
5 8°3
3
Cross section shown in figure 49
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
B' "
'10
°35
Stone revetment
Cross section shown in figure 50
A'
38
Longitudinal dike
0 0
50
100 25
150 50
200
250 FEET 75 METERS
"
'05
°35
38
Figure 55. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structures L0550 and A4497 on U.S. Highway 54 at Jefferson City, Missouri, on May 26, 2021, and January 26, 2010, with probabilistic thresholding.
No data, or outside 95-percent confidence interval
$
Results of Bathymetric and Velocimetric Surveys 77 92°
30"
35"
25"
10'
10'
10'
92°
92°
40"
45"
10'
10'
92°
92°
A
Survey date May 26, 2021 Streamflow 95,700 cubic feet per second Average water-surface elevation 534.2 feet above NAVD 88
B
EXPLANATION Channel-bed elevation, in feet above the North American Vertical Datum of 1988 540
mp ra at Bo
535 530 525
92°
Spur dike
520
10'
515
50"
510 505 500 495
0"
490
'2
°35
38
485 480 475
FLOW
470
A4497 pier 4
L0550 pier 4
465 460
Approximate apparent boundary of riprap blanket
$ Vertically averaged velocity, in feet per second
92° 55" 10'
L0550 pier 3
A4497 pier 3
" '15
°35
38
Stone revetment
Cross section shown in figure 49
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
Stone revetment
B' "
'10
°35
38
Longitudinal dike
Cross section shown in figure 50
A'
0 to 1 >1 to 2 >2 to 3 >3 to 4 >4 to 5 >5 to 6 >6 to 7 >7 to 8 >8 to 9 >9 to 10 >10 to 11 >11 to 12
0 0
50
100 25
150 50
200
250 FEET 75 METERS
Figure 56. Bathymetry and vertically averaged velocities of the Missouri River channel near structures L0550 and A4497 on U.S. Highway 54 at Jefferson City, Missouri.
"
'05
°35
38
78 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
Structure A6288 on State Highway 19 at Hermann, Missouri Structure A6288 (site 21; table 2) on State Highway 19 crosses the Missouri River at RM 97.9 at Hermann, Mo., east of Jefferson City and west of St. Louis, Mo. (fig. 1). The site was surveyed on May 26, 2021, when the average watersurface elevation of the river in the survey area, determined by the RTK GNSS tide solution, was 497.7 ft (table 6; fig. 57) and streamflow on the Missouri River was about 132,000 ft3/s during the survey (table 6). The survey area was about 1,840 ft long and about 1,450 ft wide, generally extending from bank to bank in the main channel (fig. 57). The upstream end of the survey area was about 690 ft upstream from the centerline of structure A6288 at pier 5 (fig. 57), and piers 4 through 6 were in the water. The channel-bed elevations ranged from about 463 to 484 ft for most of the surveyed area (5th to 95th percentile range of the bathymetric data; fig. 58; table 6) except inside the upstream left (north) longitudinal spur dike where a local minimum channel-bed elevation of 442 ft was observed (table 6; fig. 57). A poorly defined thalweg was present along the left (north) bank throughout the length of the surveyed area. Numerous small to medium dunes and ripples were detected throughout the channel (fig. 57). As in previous surveys (Huizinga, 2012, 2014, 2022a), rock outcrops and stone revetment were present on the right (south) bank throughout the reach, and spur dikes were present on both banks (fig. 57). Minor scour holes were observed near both piers in the main channel, and near pier 6 behind the longitudinal spur dike on the left (north) side (fig. 57). The minor scour hole near pier 6 had a minimum channel-bed elevation of about 469 ft (table 7), which is about 27 ft above the elevation of the bottom of the pier seal course of 442.00 ft (fig. 59; table 7). The minor scour hole near pier 5 had a minimum channel-bed elevation of about 464 ft (table 7), which is about 20 ft above the elevation of the bottom of the pier seal course of 444.50 ft (fig. 59; table 7). The moderate scour hole near pier 4 had a minimum channel-bed elevation of about 460 ft (table 7), which is about 9 ft above the elevation of the bottom of the pier seal course of 451.50 ft (fig. 59; table 7). The scour hole near pier 5 was difficult to discern from nearby dunes and ripples, but the downstream left edge of the footing was visible during the survey (fig. 1.8C). The upstream edge of the footing for pier 4 also was visible during the survey (figs. 57, 59, 1.8E, 1.8F), which likely contributes to the larger scour hole near that pier. The top of the footing may blunt the horseshoe vortex at pier 5, but the exposed front of the footing may exacerbate the vortex at pier 4. Information from bridge plans indicates that piers 4, 5, and 6 are founded on shafts drilled as much as 27 ft into bedrock, having about 68 ft of bed material between the bottom of the scour hole and bedrock at pier 6, about 51 ft of material at pier 5, and about 17 ft of material at pier 4, owing to the sloping nature of the bedrock (fig. 59; table 7). The surveyed bed in 2021 generally was similar to the previous multibeam surveys but tended to fall towards the
bottom of the fluctuating range of elevations seen in previous surveys between the longitudinal spur dike on the left (north) side of the channel and pier 4 (fig. 59). The difference between the survey on May 26, 2021, and the previous survey on May 31, 2017 (fig. 60), indicates about 76 percent of the joint area of interest had detectable change, which means about 24 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Deposition and erosion appear roughly balanced throughout most of the reach between 2017 and 2021 in the DoD, including areas of substantial erosion and deposition behind the longitudinal spur dike on the left (north) bank near the bridge (fig. 60). The scour hole near pier 4 was wider and deeper in 2021 than in 2017 (figs. 59, 60), despite the lower streamflow in 2021 (table 8). The average difference between the bathymetric surfaces was –0.39 ft (table 8), indicating minor channel degradation between the 2017 and 2021 surveys. The net volume of cut in the reach from 2017 to 2021 was about 85,500 yd3, and the net volume of fill was about 58,100 yd3, resulting in a net loss of about 27,400 yd3 of sediment between 2017 and 2021 (table 8). The frequency distribution of bed elevations in 2021 is similar to 2017, but with a 2–3-ft shift of the centroid towards lower elevations (fig. 58). The rock outcrop and stone revetment along the right (south) bank and the longitudinal spur dikes on the left (north) side showed localized signs of minor scour and deposition (fig. 60); however, the apparent scour or deposition may be the result of minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section). The difference between the survey on May 26, 2021, and the survey on May 2, 2013 (fig. 61), indicates about 71 percent of the joint area of interest had detectable change, which means about 29 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Erosion appears dominant throughout most of the reach between 2013 and 2021 in the DoD, except in localized areas near and downstream from spur dikes on both banks (fig. 61). The average difference between the bathymetric surfaces was –3.05 ft (table 8), which is the largest negative change observed in the 2021 surveys compared to previous surveys. The average difference indicates substantial channel degradation between the 2013 and 2021 surveys, and the net loss of sediment between 2013 and 2021 was about 169,200 yd3 (table 8), which is the most substantial loss between the surveys detailed in this report. The cross section from the 2021 survey along the upstream face of the bridge is about 5–8 ft below the 2013 survey section, except near pier 4 where the difference is near 20 ft (fig. 59). The frequency distribution of bed elevations in 2013 has a higher percentage of cells in a narrower range of channel-bed elevations, causing a shift of the centroid of 4–5 ft higher than 2021 (fig. 58). The rock outcrop and stone revetment on the right (south) bank is within the bounds of uncertainty (fig. 61). A substantial part of the channel on the left (north) side was not surveyed in 2013 because of generally lower flows (table 8) and shallow depths in that area. As with the previous DoDs, deposition or scour
A
0" 91°26'0
5" 91°26'0
91°26'1
91°26'1
0"
5"
0" 91°26'2
91°26'2
91°26'3
5"
0"
Results of Bathymetric and Velocimetric Surveys 79
EXPLANATION
Survey date May 26, 2021 Streamflow 132,000 cubic feet per second Average water-surface elevation 497.7 feet above NAVD 88
38°42'40
"
Channel-bed elevation, in feet above the North American Vertical Datum of 1988 500 495
Pier 6
490 Longitudinal spur dike
Longitudinal spur dike
485 480 475 470 465
38°42'35
"
Pier 5
460 455 450 445
$ Pier 4
38°42'30
"
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
tment Pier 3
Stone reve
Rock outcrop
Cross section shown A' in figure 59 0 0
50
100 25
Figure 57. Bathymetric survey of the Missouri River channel near structure A6288 on State Highway 19 at Hermann, Missouri.
150 50
200
250 FEET 75 METERS
amp Boat r
Spur
Rock outcrop
dike
Spur dike
FLOW
80 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021 12
90 10
Percentage of total survey-grid cells
80 70
8
60 6
50 40
4 30 20
2
10 0 445
450
455
460
465
470
475
480
485
490
495
0 500
Cumulative percentage of survey-grid cells lower than indicated elevation
100
Elevation, in feet above the North American Vertical Datum of 1988 EXPLANATION
[ft3/s, cubic foot per second] Cumulative percentage
Frequency distribution 2021 survey data; 132,000 ft 3/s 3
2021 survey data; 132,000 ft 3/s
2017 survey data; 192,000 ft /s
2017 survey data; 192,000 ft 3/s
2013 survey data; 108,000 ft3/s
2013 survey data; 108,000 ft3/s
2011 survey data; 215,000 ft3/s
2011 survey data; 215,000 ft3/s
Figure 58. Frequency distribution of bed elevations for bathymetric survey-grid cells in 1-foot elevation bins on the Missouri River near structure A6288 on State Highway 19 at Hermann, Missouri, on May 26, 2021, compared to previous surveys in 2011, 2013, and 2017 (Huizinga, 2012, 2014, 2020a, respectively).
apparent on opposing faces of a feature (such as a pier or spur dike) likely results from minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section). Nevertheless, the substantial deposition on the longitudinal spur dike just upstream from the bridge (fig. 61) likely is the result of repairs made to the dike between 2013 and 2017, because a similar indication of deposition was not apparent in the comparison between 2017 and 2021 (fig. 60). The difference between the survey on May 26, 2021, and the survey during flooding on July 28, 2011 (fig. 62), indicates about 73 percent of the joint area of interest had detectable change, which means about 27 percent of the differences in the joint area of interest are equivocal and within the bounds of uncertainty (table 8). Erosion appears dominant throughout
most of the reach between 2011 and 2021 in the DoD, except for substantial deposition in localized areas near and downstream from spur dikes on both banks (fig. 62). The average difference between the bathymetric surfaces was –1.38 ft (table 8), which is the third-largest negative change observed in the 2021 surveys compared to previous surveys. The average difference indicates moderate channel degradation between the 2011 and 2021 surveys, and the net loss of sediment between 2011 and 2021 was about 90,300 yd3 (table 8), which is the second-most substantial loss between the surveys detailed in this report. The rock outcrop and stone revetment along the right (south) bank and the longitudinal spur dikes on the left (north) side showed localized signs of minor scour and deposition (fig. 62); however, as with the previous
A
A'
525
Approximate ground line from 2001 bridge plans
Column
Column
Average water surface During 2021 survey (497.7 feet above NAVD 88) During 2017 survey (501.1 feet above NAVD 88) During 2013 survey (494.6 feet above NAVD 88) During 2011 survey (504.2 feet above NAVD 88)
Cap
Pier 3
Cap Cap
Pier 4
550
Pier 5
575
Pier 6
Elevation, in feet above North American Vertical Datum of 1988 (NAVD 88)
600
Cap
Column
Column
Pedestal
Pedestal
500 Pedestal
Pedestal
Footing Seal course
475
450
Channel bed From 2021 survey From 2017 survey From 2013 survey From 2011 survey
Footing
Footing
Seal course
Seal course
Drilled shafts
Drilled shafts
425
Drilled shafts
Footing Seal course
Drilled shafts
Approximate top of bedrock (from core logs)
400
350 500
Survey is along cross-section line shown in figure 57, facing downstream. 600
700
800
900
1,000
1,100
1,200
1,300
1,400
1,500
Distance from fill face of left (north) abutment, in feet
1,600
1,700
1,800
1,900
2,000
2,100
Substructural and superstructural details, approximate ground line, and top of bedrock line from 2001 bridge plans (Missouri Department of Transportation, written commun., 2011).
Part of bridge shown above
Figure 59. Key features, substructural and superstructural details, and surveyed channel bed of structure A6288 on State Highway 19 crossing the Missouri River at Hermann, Missouri.
Results of Bathymetric and Velocimetric Surveys 81
375
0" 91°26'0
5" 91°26'0
91°26'1
91°26'1
0"
5"
0" 91°26'2
91°26'2
91°26'3
5"
0"
82 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
A
EXPLANATION Change in channel-bed elevation, in feet
38°42'40
"
30 20
10 7 Longitudinal spur dike
Longitudinal spur dike
5
DEPOSITION
15
Pier 6
3 1 −1 −3 −5 38°42'35
Pier 5
−10 −15
SCOUR
−7
"
−20 −30 −45
$
Pier 4
38°42'30
"
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
tment Pier 3
Stone reve
amp Boat r
Spur
Rock outcrop
dike
Spur dike
FLOW
Rock outcrop
Cross section shown A' in figure 59 0 0
50
100 25
150 50
200
250 FEET 75 METERS
Figure 60. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A6288 on State Highway 19 at Hermann, Missouri, on May 26, 2021, and May 31, 2017, with probabilistic thresholding.
No data, or outside 95-percent confidence interval
0" 91°26'0
5" 91°26'0
91°26'1
91°26'1
0"
5"
0" 91°26'2
91°26'2
91°26'3
5"
0"
Results of Bathymetric and Velocimetric Surveys 83
A
EXPLANATION Change in channel-bed elevation, in feet
38°42'40
"
30
Pier 6
20
Area not surveyed in 2013
Area not surveyed in 2013
15 10 7
Longitudinal spur dike
Longitudinal spur dike
5
DEPOSITION
Area not surveyed in 2013
3 1 −1 −3 −5 38°42'35
Pier 5
−10 −15
SCOUR
−7
"
−20 −30 −45
$
Pier 4
38°42'30
"
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
tment Pier 3
Stone reve
amp Boat r
Spur
Rock outcrop
dike
Spur dike
FLOW
Rock outcrop
Cross section shown A' in figure 59 0 0
50
100 25
150 50
200
250 FEET 75 METERS
Figure 61. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A6288 on State Highway 19 at Hermann, Missouri, on May 26, 2021, and May 2, 2013, with probabilistic thresholding.
No data, or outside 95-percent confidence interval
84 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021 DoDs, deposition or scour apparent on opposing faces of a feature (such as a pier or spur dike) likely results from minor horizontal positional variances between the surveys (refer to “Uncertainty Estimation” section). The substantial deposition on the longitudinal spur dike just upstream from the bridge observed in the 2013 to 2021 comparison (fig. 61) appears again in the 2011 to 2021 comparison (fig. 62), and likely is the result of repairs made to the dike between 2013 and 2017.
The end of a survey day on the Missouri River. Photograph by Richard J. Huizinga, U.S. Geological Survey.
The vertically averaged velocity vectors indicate mostly uniform flow throughout the channel, ranging from about 2 to 9 ft/s (fig. 63), with locally lower velocities and flow reversal along the banks downstream from the various spur dikes in the reach. Flow velocities seemed unusually variable in all the transects (fig. 63), which might be the result of flow divergence and upwelling caused by the spur dikes and small to medium dune features in the reach (Best, 2005).
0" 91°26'0
5" 91°26'0
91°26'1
91°26'1
0"
5"
0" 91°26'2
91°26'2
91°26'3
5"
0"
Results of Bathymetric and Velocimetric Surveys 85
A
EXPLANATION Change in channel-bed elevation, in feet
38°42'40
"
30 20
10 7 Longitudinal spur dike
Longitudinal spur dike
5
DEPOSITION
15
Pier 6
3 1 −1 −3 −5 38°42'35
Pier 5
−10 −15
SCOUR
−7
"
−20 −30 −45
$
Pier 4
38°42'30
"
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
tment Pier 3
Stone reve
amp Boat r
Spur
Rock outcrop
dike
Spur dike
FLOW
Rock outcrop
Cross section shown A' in figure 59 0 0
50
100 25
150 50
200
250 FEET 75 METERS
Figure 62. Difference between surfaces created from bathymetric surveys of the Missouri River channel near structure A6288 on State Highway 19 at Hermann, Missouri, on May 26, 2021, and July 28, 2011, with probabilistic thresholding.
No data, or outside 95-percent confidence interval
A
0" 91°26'0
5" 91°26'0
91°26'1
91°26'1
0"
5"
0" 91°26'2
91°26'2
91°26'3
5"
0"
86 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
EXPLANATION
Survey date May 26, 2021 Streamflow 132,000 cubic feet per second Average water-surface elevation 497.7 feet above NAVD 88
38°42'40
"
Channel-bed elevation, in feet above the North American Vertical Datum of 1988 500 495
Pier 6
490 Longitudinal spur dike
Longitudinal spur dike
485 480 475 470 465
38°42'35
"
Pier 5
460 455 450 445
$ Vertically averaged velocity, in feet per second
Pier 4
38°42'30
"
Base from National Agriculture Imagery Program, 2014 Universal Transverse Mercator projection, zone 15 north Horizontal coordinate information referenced to the North American Datum of 1983 (NAD 83) Vertical coordinate information referenced to the North American Vertical Datum of 1988 (NAVD 88)
Rock outcrop
Cross section shown A' in figure 59 0 0
50
100 25
150 50
200
250 FEET 75 METERS
Figure 63. Bathymetry and vertically averaged velocities of the Missouri River channel near structure A6288 on State Highway 19 at Hermann, Missouri.
ramp Boat
tment Pier 3
Stone reve
dike
Rock outcrop
Spur
Spur dike
FLOW
0 to 1 >1 to 2 >2 to 3 >3 to 4 >4 to 5 >5 to 6 >6 to 7 >7 to 8 >8 to 9 >9 to 10 >10 to 11 >11 to 12
Summary and Conclusions 87
Summary and Conclusions Bathymetric and velocimetric data were collected by the U.S. Geological Survey, in cooperation with the Missouri Department of Transportation, near nine bridges at eight highway crossings between Kansas City and St. Louis, Missouri, on May 19–26, 2021. A multibeam echosounder mapping system was used to obtain channel-bed elevations for river reaches extending 1,640 to 1,840 feet (ft) longitudinally and generally extending laterally across the active channel from bank to bank during low to moderate flood-flow conditions. These surveys indicated the channel conditions at the time of the surveys and provided characteristics of scour holes that may be useful in developing predictive guidelines or equations for scour holes. These data also may be useful to the Missouri Department of Transportation as a low to moderate flood-flow assessment of the bridges for stability and integrity issues with respect to bridge scour during floods. The estimated gridded uncertainty for the bathymetric surface of each survey area was computed as an estimate of the accuracy to be expected for each point with all relevant sources of error considered. An analysis of the surveys indicated that more than 99 percent of the bathymetric data at all the sites have a gridded uncertainty of less than 0.50 ft, and more than 97 percent of the channel-bed elevations at the sites have a gridded uncertainty of less than 0.25 ft. The gridded uncertainty of the data has been decreasing with time compared to previous surveys attributed to improvements in data-collection equipment and methods. A variety of fluvial geomorphic features were detected in the channel, ranging from small ripples to large dunes that indicate moderate transport of bedload were present at all the surveyed bridges. Rock outcrops also were detected along one bank at several sites where the alluvial material of the channel bed had been washed away, consistent with previous surveys. Bathymetric data were collected around every pier that was in water. Scour holes were present at most piers for which bathymetry could be obtained, except those on banks or surrounded by riprap. Occasionally, scour holes were minor and difficult to discern from nearby dunes and ripples, such as structure A5664 at Lexington (site 14), structure A5910 at Waverly (site 15), structure A4574 at Boonville (site 18), and pier 5 of structure A6288 at Hermann (site 21). All the bridge sites in this study were previously surveyed. Comparisons between bathymetric surfaces from the previous surveys and those of the current (2021) study do not indicate any consistent correlation between channel-bed elevations and streamflow conditions. Most of the sites in the current (2021) study were surveyed when the Missouri River
was on or between minor to moderate flood rises during generally higher late-spring streamflows. The average difference between the bathymetric surfaces varied from 1.59 ft higher to 0.95 ft lower in 2021 than 2017, which corresponds to a gain of 100,200 cubic yards (yd3) and a loss of 55,800 yd3, respectively. The average difference between the bathymetric surfaces varied from 2.74 ft higher to 3.05 ft lower in 2021 than 2013, which corresponds to a gain of 111,500 yd3 and a loss of 169,200 yd3, respectively. The average difference between the bathymetric surfaces varied from 4.52 ft higher to 1.38 ft lower in 2021 than 2011, which corresponds to a gain of 221,100 yd3 and a loss of 90,300 yd3, respectively. The most substantial overall net gain was between 2011 and 2021 at structures L0550 and A4497 at Jefferson City (site 20), and likely is a combination of the mitigation of the scour holes near pier 4 of both bridges by the riprap blanket scour countermeasures installed in 2015, and the substantially lower flow in 2021 than in 2011. Alternatively, the most substantial overall net loss was between 2013 and 2021 at structure A6288 at Hermann (site 21), despite comparable streamflows. Furthermore, all the changes at structure A6288 at Hermann were a net loss of sediment between 2021 and previous surveys. Pier size, nose shape, and skew to approach flow affected the size of the scour hole observed at a given pier. Piers with wide or blunt noses caused by exposed footings or caissons usually resulted in larger, deeper scour holes at those piers. When a pier was skewed to primary approach flow, generally the scour hole was deeper and longer than at a similar pier without skew. For example, the exposed caissons of pier 5 of structure K0999 at Miami (site 16) and pier 14 of structure L0962 near Rocheport (site 19) likely contributes to the shape and depth of the scour holes near these piers and the similarity to previous surveys, despite the generally lower flow in 2021 compared to previous surveys. Furthermore, the skew of pier 14 of structure L0962 (site 19) was longer and deeper on the side with impinging flow, similar to the general shape of scour holes for skewed piers. At structure A6288 at Hermann (site 21), the scour hole near pier 5 was difficult to discern from nearby dunes and ripples, whereas the upstream edge of the footing was visible at pier 4, which likely contributes to the larger scour hole near that pier; the top of the footing may blunt the horseshoe vortex at pier 5, but the exposed front of the footing may exacerbate the vortex at pier 4. A riprap blanket surrounds pier 4 of structures L0550 and A4497 (site 20) and limits scour near those piers. The mitigation of the scour hole by the riprap blanket had been noted in the previous survey in 2017. The upstream end of the blanket appeared to have settled by 5 to 10 ft.
88 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
References Cited American Association of State Highway Transportation Officials, 2020, AASHTO LRFD bridge design specifications (9th ed.): Washington, D.C., American Association of State Highway Transportation Officials, 176 p. Applanix Corporation, 2021, POSPac MMS GNSS-inertial tools software, rev. 17: Richmond Hill, Ontario, Canada, PUBS–MAN–001768, 239 p. Arneson, L.A., Zevenbergen, L.W., Lagasse, P.F., and Clopper, P.E., 2012, Evaluating scour at bridges (5th ed.): U.S. Federal Highway Administration Publication FHWA– HIF–12–003, Hydraulic Engineering Circular no. 18, 340 p., accessed September 30, 2022, at https://www.fhw a.dot.gov/engineering/hydraulics/pubs/hif12003.pdf. Becker, L.D., 1994, Investigation of bridge scour at selected sites on Missouri streams: U.S. Geological Survey WaterResources Investigations Report 94–4200, 40 p., accessed September 30, 2022, at https://doi.org/10.3133/wri944200.
Esri, 2022, Resources for ArcMap (ver. 10.8): accessed August 29, 2022, at https://www.esri.com/en-us/arcgis/ products/arcgis-desktop/resources. Gilbert, G.K., and Murphy, E.C., 1914, The transportation of debris by running water: U.S. Geological Survey Professional Paper 86, 263 p., accessed September 30, 2022, at https://doi.org/10.3133/pp86. Hughes Clarke, J.E., Mayer, L.A., and Wells, D.E., 1996, Shallow-water imaging multibeam sonars—A new tool for investigating seafloor processes in the coastal zone and on the continental shelf: Marine Geophysical Researches, v. 18, p. 607–629, accessed November 29, 2022, at https://doi.org/ 10.1007/BF00313877. Huizinga, R.J., 2010, Bathymetric surveys at highway bridges crossing the Missouri River in Kansas City, Missouri, using a multibeam echo sounder, 2010: U.S. Geological Survey Scientific Investigations Report 2010–5207, 61 p., accessed August 24, 2023, at https://doi.org/10.3133/sir20105207.
Best, J., 2005, The fluid dynamics of river dunes—A review and some future research directions: Journal of Geophysical Research, v. 110, no. F4, F04S02, accessed August 21, 2023, at https://doi.org/10.1029/2004JF000218.
Huizinga, R.J., 2011, Bathymetric surveys at highway bridges crossing the Missouri and Mississippi Rivers near St. Louis, Missouri, 2010: U.S. Geological Survey Scientific Investigations Report 2011–5170, 75 p., accessed August 24, 2023, at https://doi.org/10.3133/sir20115170.
Brown, D.A., Turner, J.P., Castelli, R.J., and Loehr, E.J., 2018, Drilled shafts—Construction procedures and design methods: U.S. Federal Highway Administration Publication FHWA–NHI–18-024, Geotechnical Engineering Circular no. 10, 756 p., accessed August 21, 2023, at https ://www.fhwa.dot.gov/engineering/geotech/nhi18024.pdf.
Huizinga, R.J., 2012, Bathymetric and velocimetric surveys at highway bridges crossing the Missouri River in and into Missouri during summer flooding, July–August 2011: U.S. Geological Survey Scientific Investigations Report 2012–5204, 166 p., accessed August 24, 2023, at https://doi.org/10.3133/sir20125204.
Calder, B.R., and Mayer, L.A., 2003, Automatic processing of high-rate, high-density multibeam echosounder data: Geochemistry, Geophysics, Geosystems (G3), v. 4, no. 6, 22 p., accessed December 8, 2023, at https://doi.org/10.1029/ 2002GC000486.
Huizinga, R.J., 2013, Results of repeat bathymetric and velocimetric surveys at the Amelia Earhart Bridge on U.S. Highway 59 over the Missouri River at Atchison, Kansas, 2009–2013: U.S. Geological Survey Scientific Investigations Report 2013–5177, 50 p., accessed August 24, 2023, at https://doi.org/10.3133/sir20135177.
Densmore, B.K., Strauch, K.R., and Dietsch, B.J., 2013, Hydrographic surveys of the Missouri and Yellowstone Rivers at selected bridges and through Bismarck, North Dakota, during the 2011 flood: U.S. Geological Survey Scientific Investigations Report 2013–5087, 59 p., accessed September 30, 2022, at https://doi.org/10.3133/sir20135087. Dietsch, B.J., Densmore, B.K., and Strauch, K.R., 2014, Repeated multibeam echosounder hydrographic surveys of 15 selected bridge crossings along the Missouri River from Niobrara to Rulo, Nebraska during flood of 2011: U.S. Geological Survey Scientific Investigations Report 2014–5062, 53 p., accessed February 1, 2024, at https://doi.org/10.3133/sir20145062.
Huizinga, R.J., 2014, Bathymetric and velocimetric surveys at highway bridges crossing the Missouri River between Kansas City and St. Louis, Missouri, April–May, 2013: U.S. Geological Survey Scientific Investigations Report 2014–5116, 79 p., accessed August 24, 2023, at https://doi.org/10.3133/sir20145116. Huizinga, R.J., 2015, Bathymetric and velocimetric surveys at highway bridges crossing the Missouri and Mississippi Rivers on the periphery of Missouri, June 2014: U.S. Geological Survey Scientific Investigations Report 2015–5048, 81 p., accessed August 24, 2023, at https://doi.org/10.3133/sir20155048.
References Cited 89 Huizinga, R.J., 2016, Bathymetric and velocimetric surveys at highway bridges crossing the Missouri River near Kansas City, Missouri, June 2–4, 2015: U.S. Geological Survey Scientific Investigations Report 2016–5061, 93 p., accessed August 24, 2023, at https://doi.org/10.3133/sir20165061. Huizinga, R.J., 2017a, Bathymetric and velocimetric surveys at highway bridges crossing the Missouri and Mississippi Rivers near St. Louis, Missouri, May 23–27, 2016: U.S. Geological Survey Scientific Investigations Report 2017–5076, 102 p., accessed August 24, 2023, at https://doi.org/10.3133/sir20175076. Huizinga, R.J., 2017b, Bathymetry and velocity data from surveys at highway bridges crossing the Missouri and Mississippi Rivers near St. Louis, Missouri, October 2008 through May 2016: U.S. Geological Survey data release, accessed August 24, 2023, at https://doi.org/10.5066/ F71C1VCC. Huizinga, R.J., 2020a, Bathymetric and velocimetric surveys at highway bridges crossing the Missouri River between Kansas City and St. Louis, Missouri, May 22–31, 2017: U.S. Geological Survey Scientific Investigations Report 2020–5018, 104 p., accessed August 24, 2023, at https://doi.org/10.3133/sir20205018. Huizinga, R.J., 2020b, Bathymetry and velocity data from surveys at highway bridges crossing the Missouri River in Kansas City, Missouri, March 2010 through May 2017: U.S. Geological Survey data release, accessed August 24, 2023, at https://doi.org/10.5066/P9L6GW57.
Huizinga, R.J., 2021, Bathymetry and velocity data from surveys at highway bridges crossing the Missouri River in Kansas City, Missouri, in August 2019, August 2020, and October 2020: U.S. Geological Survey data release, accessed August 24, 2023, at https://doi.org/10.5066/ P96TX8AE. Huizinga, R.J., 2022a, Bathymetric and velocimetric surveys at highway bridges crossing the Missouri River near Kansas City, Missouri, August 2019, August 2020, and October 2020: U.S. Geological Survey Scientific Investigations Report 2021–5098, 112 p., accessed August 24, 2023, at https://doi.org/10.3133/sir20215098. Huizinga, R.J., 2022b, Bathymetry and velocity data from surveys at highway bridges crossing the Missouri and Mississippi Rivers near St. Louis, Missouri, August 3–10, 2020: U.S. Geological Survey data release, accessed April 25, 2023, at https://doi.org/10.5066/P9F04JC5. Huizinga, R.J., 2023, Bathymetric and velocimetric surveys at highway bridges crossing the Missouri and Mississippi Rivers near St. Louis, Missouri, August 3–10, 2020 (ver. 1.1, June 2023): U.S. Geological Survey Scientific Investigations Report 2023–5050, 129 p., accessed June 1, 2023, at https://doi.org/10.3133/sir20235050. Huizinga, R.J., and Rivers, B.C., 2023, Bathymetry and velocity data from surveys at highway bridges crossing the Missouri River between Kansas City and St. Louis, Missouri, May 19–26, 2021 (ver. 2.0, August 2023): U.S. Geological Survey data release, accessed August 14, 2023, at https://doi.org/10.5066/P9ULGQ4W.
Huizinga, R.J., 2020c, Bathymetry and velocity data from surveys at highway bridges crossing the Missouri River between Kansas City and St. Louis, Missouri, January 2010 through May 2017: U.S. Geological Survey data release, accessed August 24, 2023, at https://doi.org/10.5066/ P94M4US7.
Huizinga, R.J., Elliott, C.M., and Jacobson, R.B., 2010, Bathymetric and velocimetric survey and assessment of habitat for pallid sturgeon on the Mississippi River in the vicinity of the proposed Interstate 70 Bridge at St. Louis, Missouri: U.S. Geological Survey Scientific Investigations Report 2010–5017, 28 p., accessed August 24, 2023, at https://doi.org/10.3133/sir20105017.
Huizinga, R.J., 2020d, Bathymetry and velocity data from surveys at highway bridges crossing the Missouri and Mississippi Rivers on the periphery of Missouri, December 2008 through August 2018: U.S. Geological Survey data release, accessed August 24, 2023, at https://doi.org/10.5066/P9WDI9YF.
Huizinga, R.J., Rivers, B.C., Richards, J.M., and Waite, G.J., 2023, Bathymetric contour maps, surface area and capacity tables, and bathymetric change maps for selected watersupply lakes in north-central and west-central Missouri, 2020: U.S. Geological Survey Scientific Investigations Report 2023–5046, 52 p., accessed June 6, 2023, at https://doi.org/10.3133/sir20235046.
Huizinga, R.J., 2020e, Bathymetric and velocimetric surveys at highway bridges crossing the Missouri and Mississippi Rivers on the periphery of Missouri, July–August 2018: U.S. Geological Survey Scientific Investigations Report 2020–5088, 100 p., accessed August 24, 2023, at https://doi.org/10.3133/sir20205088.
Huizinga, R.J., and Rydlund, P.H., Jr., 2004, Potentialscour assessments and estimates of scour depth using different techniques at selected bridge sites in Missouri: U.S. Geological Survey Scientific Investigations Report 2004–5213, 42 p., accessed August 24, 2023, at https://doi.org/10.3133/sir20045213.
90 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021 HYPACK, Inc., 2020, HYPACK user manual: Middletown, Conn., HYPACK, Inc., 2,602 p., accessed June 28, 2022, at http://www.hypack.com/File%20Library/Resource%20 Library/Manuals/2020/2020-HYPACK-User-Manual.pdf.
Rydlund, P.H., Jr., 2009, Real-time river channel-bed monitoring at the Chariton and Mississippi Rivers in Missouri, 2007–09: U.S. Geological Survey Scientific Investigations Report 2009–5254, 27 p., accessed August 24, 2023, at https://doi.org/10.3133/sir20095254.
International Hydrographic Organization, 2020, IHO standards for hydrographic surveys (6th ed.): Monaco, International Hydrographic Bureau, Special publication no. 44, 41 p., accessed February 1, 2024, at https://iho.int/uploads/user/ pubs/standards/s-44/S-44_Edition_6.1.0.pdf.
Simons, D.B., and Richardson, E.V., 1966, Resistance to flow in alluvial channels: U.S. Geological Survey Professional Paper 422–J, 61 p., accessed April 27, 2023, at https://doi.org/10.3133/pp422J.
Mueller, D.S., Wagner, C.R., Rehmel, M.S., Oberg, K.A., and Rainville, F., 2013, Measuring discharge with acoustic Doppler current profilers from a moving boat (ver. 2.0, December 2013): U.S. Geological Survey Techniques and Methods, book 3, chap. A22, 95 p., accessed September 30, 2022, at https://doi.org/10.3133/tm3A22. National Marine Electronics Association, 2002, NMEA 0183—Standard for interfacing marine electronic devices (ver. 3.01). National Marine Electronics Association, 88 p., accessed February 1, 2024, at https://www.plaisance- pratique.com/IMG/pdf/NMEA0183-2.pdf. Parsons, D.R., Jackson, P.R., Czuba, J.A., Engel, F.L., Rhoads, B.L., Oberg, K.A., Best, J.L., Mueller, D.S., Johnson, K.K., and Riley, J.D., 2013, Velocity Mapping Toolbox (VMT)—A processing and visualization suite for movingvessel ADCP measurements: Earth Surface Processes and Landforms, v. 38, no. 11, p. 1244–1260, accessed April 27, 2023, at https://doi.org/10.1002/esp.3367. Rivers, B.C., Huizinga, R.J., Richards, J.M., and Waite, G.J., 2023, Bathymetric contour maps, surface area and capacity tables, and bathymetric change maps for selected water-supply lakes in northeastern Missouri, 2021: U.S. Geological Survey Scientific Investigations Report 2023–5108, 63 p., accessed October 10, 2023, at https://doi.org/10.3133/sir20235108. Riverscapes Consortium, 2022, Geomorphic change detection software: Riverscapes Consortium, accessed September 2022 at https://gcd.riverscapes.net/.
Simon, Li and Associates, 1985, Seasonal effects of river stage-discharge relations at selected gages, Final Report: Fort Collins, Colo., prepared for U.S. Army Corps of Engineers, Contract No. DACW43–85–D–0017, 96 p. U.S. Army Corps of Engineers [USACE], 2003, Upper Mississippi River System flow frequency study, appendix E: Rock Island, Ill., U.S. Army Corps of Engineers, accessed April 27, 2023, at https://www.mvr.usace.army.mil/Portals/ 48/docs/FRM/UpperMissFlowFreq/App.%20E%20Kans as%20City%20Dist.%20Hydrology_Hydraulics.pdf. U.S. Army Corps of Engineers [USACE], 2013, Engineering and design—Hydrographic surveying: Washington D.C., U.S. Army Corps of Engineers, manual no. EM 1110–2–1003, 560 p., accessed September 25, 2023, at https://www.publications.usace.army.mil/Portals/76/ Publications/EngineerManuals/EM_1110-2-1003.pdf?ver= gDGVUj_0XR2sXHiIpQZv2Q%3d%3d. U.S. Geological Survey [USGS], 2023a, USGS water data for the Nation: U.S. Geological Survey National Water Information System database, accessed April 27, 2023, at https://doi.org/10.5066/F7P55KJN. U.S. Geological Survey [USGS], 2023b, USGS Streamgage Statistics for station 06895500: U.S. Geological Survey WaterWatch toolkit, accessed April 27, 2023, at https:// waterwatch.usgs.gov/index.php?sno=06895500&ds= dv01d_por&btnGo=GO&m=sitempnn. U.S. Geological Survey [USGS], 2023c, USGS Streamgage Statistics for station 06934500: U.S. Geological Survey WaterWatch toolkit, accessed April 27, 2023, at https:// waterwatch.usgs.gov/index.php?sno=06934500&ds= dv01d_por&btnGo=GO&m=sitempnn.
Glossary 91
Glossary bent A vertical, load-bearing, intermediate bridge substructure unit between the ends of a bridge used to support the bridge at intermediate intervals, typically consisting of two or more piles (referred to as a “pile bent”) or columns, each supported by an individual footing, pile, or drilled shaft. caisson An older type of bridge foundation consisting of a watertight retaining structure used as the foundation of a bridge pier, constructed in such a way that the water can be pumped out, keeping the work environment dry while the ground under the caisson is excavated and the caisson “sunk” into final position below the ground line. Upon reaching its final position, the caisson is backfilled with sand or gravel for added weight and stability.
pedestal A transitional element occasionally used in a bridge pier or pylon, typically present between the column and a footing or caisson. pier A vertical, load bearing, intermediate bridge substructure unit between the ends of a bridge used to support the bridge at intermediate intervals, consisting of a single column or shaft, or multiple columns connected with a strut or solid web, and generally supported by a single footing. pile A long, narrow cylinder or beam made of wood, metal, or concrete used as part of the foundation of a bridge, typically driven into the ground from above and integrated into a seal course or footing of a pier, or the cap of a pile bent.
cap The upper or bearing part of a bridge pier or bent, usually made of concrete or hard stone and designed to distribute concentrated loads from the bridge superstructure evenly over the columns of the pier or bent.
pylon A tower-like vertical, load bearing substructural unit that usually supports the cables of a suspension bridge or a cable-stayed bridge. A pylon typically extends above the bridge superstructure.
cofferdam A temporary retaining structure used in pier and pylon construction to retain water and support the sides of an excavation where water is present. A cofferdam generally consists of vertical sheet piling around the perimeter of a bracing system and a bottom seal course. Once sealed, the water can be pumped out, keeping the work environment dry while the footing, columns, and other substructural elements are built.
seal course The base of a newer type of bridge foundation, created when a cofferdam used to build the foundation is “sealed” with concrete at the underwater ground level to prevent water from entering the cofferdam from below.
column The primary part of a bridge bent, pier, or pylon used to convey the load of the bridge superstructure to the foundation. drilled shaft A cylindrical shaft that is drilled into the ground as a bridge foundation, typically extending through the alluvial material into underlying rock and filled with reinforced concrete. footing A part of the foundation of a bridge bent, pier, or pylon used to transmit the load from the column to the ground, either directly or indirectly through piles or drilled shafts.
spur dike linear structure usually constructed of piled stone projecting from the bank in a river to redirect the river's own energy to protect the bank from erosion and to direct the axis of flow. stone revetment A facing of stone, concrete units, or slabs built to protect a bank or other feature against erosion by wave action, currents, and surges. strut A horizontal intermediate bridge substructure unit used to connect and brace two or more columns or shafts of a pier. substructure The part of a bridge that supports the superstructure and transmits the load of the superstructure and deck to the ground through the foundations.
92 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021 superstructure The part of a bridge that supports the bridge deck and connects one substructural element to another and thereby transmits the load of the deck and anything on the deck to the substructure.
water year A continuous 12-month period selected to present data relative to hydrologic or meteorological phenomena during which a complete annual hydrologic cycle normally occurs. The water year used by the U.S. Geological Survey runs from October 1 through September 30 and is designated by the year in which it ends.
Appendix 1. 93
Appendix 1. Shaded Triangulated Irregular Network Images of the Channel and Side of Pier for Each Surveyed Pier Shaded triangulated irregular network images of the channel and side of pier were prepared for each surveyed pier at structure A5664 at Lexington (fig. 1.1), structure A5910 at Waverly (fig. 1.2), structure K0999 at Miami (fig. 1.3),
structure G0069 at Glasgow (fig. 1.4), structure A4574 at Boonville (fig. 1.5), structure L0962 near Rocheport (fig. 1.6), structures L0550 and A4497 at Jefferson City (fig. 1.7), and structure A6288 at Hermann (fig. 1.8).
94 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
Pier 21
A Top of footing
Flow
Pier 21
B
Top of footing
Flow
Pier 22
C
Submerged woody debris
Flow
Pier 22
D
Submerged woody debris
Flow
EXPLANATION Elevation, in feet above the North American Vertical Datum of 1988
0 68 7 67 4 67 1 67 8 66 5 66 2 66 9 65 6 65 3 65
Figure 1.1. Shaded triangulated irregular network visualization of the channel bed and piers of structure A5664 on State Highway 13 over the Missouri River at Lexington, Missouri. A, Left (north) side of pier 21. B, Right (south) side of pier 21. C, Left (north) side of pier 22. D, Right (south) side of pier 22.
Appendix 1. 95
Submerged log with rootwad
Pier 10
A
Flow
Pier 10
Submerged woody debris
B
Flow
Pier 11
C
Flow
Pier 11
D Flow
EXPLANATION Elevation, in feet above the North American Vertical Datum of 1988
0 66 7 65 4
1
65
8
65
5
64
2
64
9
64
6
63
3
63
63
Figure 1.2. Shaded triangulated irregular network visualization of the channel bed and piers of structure A5910 on U.S. Highway 24 over the Missouri River at Waverly, Missouri. A, Left (north) side of pier 10. B, Right (south) side of pier 10. C, Left (north) side of pier 11. D, Right (south) side of pier 11.
96 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021 A
Longitudinal dike Pier 6 pedestal
Flow
Caisson
B
Pier 6 pedestal
Flow Caisson
EXPLANATION Elevation, in feet above the North American Vertical Datum of 1988 634 630 626 622 618 614 610 606 602 598 594
Pier 5 pedestal
C
Flow
Caisson
D Pier 5 pedestal
Flow Caisson
E
Pier 4 pedestal
Flow
Figure 1.3. Shaded triangulated irregular network visualization of the channel bed and piers of structure K0999 on State Highway 41 over the Missouri River at Miami, Missouri. A, Left (north) side of pier 6. B, Right (south) side of pier 6. C, Left (north) side of pier 5. D, Right (south) side of pier 5. E, Left (north) side of pier 4.
Appendix 1. 97 A
EXPLANATION
Pier 1 Rock outcrop
Rock outcrop
Flow
Railroad bridge pier
Pier 2
B Footing
Base
Flow
Pier 2
Railroad bridge pier
C Rock outcrop
Footing
Base
D Flow
E
Flow
Pier 3
Railroad bridge pier
Missed data
Missed data Base
Caisson
Old base
Railroad bridge pier
Pier 3
Missed data
Missed data Caisson
Base
Flow
Pier 4
F
Flow
Railroad bridge pier
Caisson
Old base
Railroad bridge pier
G Flow
Rock outcrop
Elevation, in feet above the North American Vertical Datum of 1988 605 600 595 590 585 580 575 570 565
Submerged debris
Pier 4
Figure 1.4. Shaded triangulated irregular network visualization of the channel bed and piers of structure G0069 on State Highway 240 over the Missouri River at Glasgow, Missouri. A, Right (west) side of pier 1. B, Left (east) side of pier 2. C, Right (west) side of pier 2. D, Left (east) side of pier 3. E, Right (west) side of pier 3. F, Left (east) side of pier 4. G, Right (west) side of pier 4.
98 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
A
Stone revetment
Pier 8 EXPLANATION
Stone revetment
Elevation, in feet above the North American Vertical Datum of 1988 581 578 575 572 569 566 563 560 557 554 551 548
Submerged woody debris
Flow Pier 7
B Flow
Pier 7 Caisson
C Flow
Pier 6
D
Debris pile
Flow
Pier 6
E
Debris pile
Flow F
Pier 5 Stone revetment
Submerged woody debris
Stone revetment
Flow
Figure 1.5. Shaded triangulated irregular network visualization of the channel bed and piers of structure A4574 on State Highway 5 over the Missouri River at Boonville, Missouri. A, Right (south) side of pier 8. B, Left (north) side of pier 7. C, Right (south) side of pier 7. D, Left (north) side of pier 6. E, Right (south) side of pier 6. F, Left (north) side of pier 5.
Appendix 1. 99
Longitudinal dike
Bent 16
A
Pedestal
Woody debris
Woody debris
Flow Bent 16
B
Pedestal
Flow Woody debris Pier 15
C Stone revetment of longitudinal spur dike
Pedestal
Stone revetment of longitudinal spur dike
Caisson
Flow
Pier 15
D Flow
E
Pedestal
Stone revetment of longitudinal spur dike
Pier 14
Pedestal
Caisson
F
EXPLANATION Elevation, in feet above the North American Vertical Datum of 1988 570 566 562 558 554 550 546 542 538 534 530 526
Pedestal
Flow
Pier 14
Caisson
Flow
Figure 1.6. Shaded triangulated irregular network visualization of the channel bed and piers of structure L0962 on Interstate 70 over the Missouri River near Rocheport, Missouri. A, Left (east) side of bent 16. B, Right (west) side of bent 16. C, Left (east) side of pier 15. D, Right (west) side of pier 15. E, Left (east) side of pier 14. F, Right (west) side of pier 14.
100 Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021
Pier 4, L0550
Pier 4, A4497
A
Top of caisson
Top of footing
Flow Riprap blanket Pier 4, A4497 Pier 4, L0550
B
Top of footing
Top of caisson
Flow
Riprap blanket
C
Pier 3, A4497
Flow Stone revetment
Pier 3, L0550
EXPLANATION Elevation, in feet above the North American Vertical Datum of 1988 533 530 527 524 521 518 515 512 509 506 503 500
Figure 1.7. Shaded triangulated irregular network visualization of the channel bed and piers of structures L0550 and A4497 on U.S. Highway 54 over the Missouri River at Jefferson City, Missouri. A, Left (northeast) side of pier 4 of both structures. B, Right (southwest) side of pier 4 of both structures. C, Left (northeast) side of pier 3 of both structures.
Appendix 1. 101 Pier 6
A
EXPLANATION
Flow
Pier 6
B
Flow Pier 5
Missed or sparse data due to low incidence angle
C Old pier remnant
Top of footing
Elevation, in feet above the North American Vertical Datum of 1988 496 493 490 487 484 481 478 475 472 469 466
Flow
Pier 5
D
Old pier remnant
Flow E
Pier 4
Top of footing Old pier remnant
Flow
Submerged debris Pier 4
Old pier remnant
F Submerged debris Top of footing
Flow
Figure 1.8. Shaded triangulated irregular network visualization of the channel bed and piers of structure A6288 on State Highway 19 over the Missouri River at Hermann, Missouri. A, Left (north) side of pier 6. B, Right (south) side of pier 6. C, Left (north) side of pier 5. D, Right (south) side of pier 5. E, Left (north) side of pier 4. F, Right (south) side of pier 4.
For more information about this publication, contact: Director, USGS Central Midwest Water Science Center 1400 Independence Road Rolla, MO 65401 573–308–3667 For additional information, visit: https://www.usgs.gov/ centers/cmwater Publishing support provided by the Rolla Publishing Service Center
Huizinga—Bathymetric/Velocimetric Surveys at Highway Bridges Crossing the Missouri River between Kansas City and St. Louis, 2021—SIR 2024–5021
ISSN 2328-0328 (online) https://doi.org/10.3133/sir20245021