Escholarshipmetadata only
Netload Range Cost Curves for Coordinated Transmission-Distribution Planning Under DER Growth Uncertainty
46 information and computing sciences (for-2020), 40 engineering (for-2020), 4008 electrical engineering (for-2020), planning, investment, costs, substations, uncertainty
This document is indexed with metadata only — full text is not available in the archive for this record.
Open the official source ↗
Related documents
Record · ID 624374
Retrieved via
Conceptio — every document is proof-bundled with source, license, and retrieval metadata.