ConceptioArchivebioRxiv / medRxiv
bioRxiv / medRxivopen access

Pre-analytical delay of blood cultures: poor compliance with the recommended standard is linked to laboratory centralisation.

Noone, M. r. · 2026
bioRxiv / medRxiv · Papers · License: Open Access · 2026
Open Source ↗
pathology
This document is indexed with metadata only — full text is not available in the archive for this record. Open the official source ↗
Record · ID 67962
Retrieved via Conceptio — every document is proof-bundled with source, license, and retrieval metadata.