Conceptio › Archive › PhilArchive
PhilArchive open access

Drobeta Turnu Severin Heavy Water Plant: Construction

Sfetcu, Nicolae · 2023
PhilArchive · Papers · 2023
Open Source ↗
philosophy
The heavy water plant was established under the name of Combinatul Chimic Drobeta, by Decree 400/16.11.1979, under the Inorganic Products Industrial Center (CIPA) Râmnicu Vâlcea. The thermo-electric plant for supplying the heavy water factory with steam was decided to be located in Halânga village, three kilometers from the factory. The process water required for the factory was brought from the Danube, and the hydrogen sulphide used in the process was produced in the plant, through a specific technology, and then compressed, liquefied and stored in special tanks. The works on the heavy water factory at Drobeta Turnu Severin started in 1979, based on a derogatory HCM. The equipment for the heavy water plant was purchased through the Industrial Center for Chemical and Refinery Equipment (CIUTCR). All equipment and facilities that transported hydrogen sulphide had to meet strict quality assurance conditions.
Conceptio Open Archive

Analyze & explore related research in Conceptio

Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.

This document is indexed with metadata only: full text is not available in the archive for this record. Open the official source ↗

Related documents

Record · ID 718499
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Bring this data into your agent: Connect via MCP or API · 20 free credits to start · no card required
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive