arXiv (All)
open access
Lose the Order, Keep the Hierarchy: Deordering HTN Plans
Hierarchical Task Network (HTN) planning is a powerful planning formalism based on task decomposition. Although most of the literature studied plan generation, comparatively less attention has been paid to post-plan optimization. In particular, plan deordering has been extensively studied in classic
Conceptio Open Archive
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
This document is indexed with metadata only: full text is not available in the archive for this record. Open the official source ↗
Related documents
- Towards Numerical TOHTN Planning with SMT-based HTN-SAT Encoding#639733
- Towards Numerical TOHTN Planning with SMT-based HTN-SAT Encoding#926801
- Design constraints for the post-human future#76762
- Generating optimal topologies in structural design using a homogenization method#7141
- Implementing leadership decisions#766727
Record · ID 926780
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Bring this data into your agent: Connect via MCP or API · 20 free credits to start · no card required
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive