Koc University Digital Collections
metadata only
A new crossover operator for single machine total weighted tardiness problem with sequence dependent setup times
The single machine total weighted tardiness problem with sequence dependent setup times is a challenging and heavily studied problem. This problem is NP-hard, so several heuristics have been proposed in the literature so far. One of them is the genetic algorithm. The genetic algorithm is both powerf
Conceptio Open Archive
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
This document is indexed with metadata only: full text is not available in the archive for this record. Open the official source ↗
Related documents
- Genetic algorithm-based daily power output forecasting for energy storage power stations#133169
- Genetic algorithm-based daily power output forecasting for energy storage power stations#127893
- Moebius: Serving Mixture-of-Expert Models with Seamless Runtime Parallelism Switch#310786
- Optimalisasi Desain Plat Lantai Beton Bertulang berdasarkan Harga Terendah Menggunakan Metode Genetic Algorithm#194940
- Anchored Scenario Coverage for Failure-Aware First-Hit Batch Inverse Design#781157
Record · ID 935030
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Bring this data into your agent: Connect via MCP or API · 20 free credits to start · no card required
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive