Koc University Digital Collections
metadata only
A multiperiod stochastic production planning and sourcing problem with service level constraints
We study a stochastic multiperiod production planning and sourcing problem of a manufacturer with a number of plants and/or subcontractors. Each source, i.e. each plant and subcontractor, has a different production cost, capacity, and lead time. The manufacturer has to meet the demand for different
Conceptio Open Archive
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
This document is indexed with metadata only: full text is not available in the archive for this record. Open the official source ↗
Related documents
- Optimización del procesamiento de Shio Harami de trucha arcoíris (Oncorhynchus mykiss) utilizando la metodología Lean Manufacturing#396947
- Développement d'un outil de dimensionnement et de gestion énergétique optimisés de systèmes multisources. : application à une installation de production électrique autonome#1120268
- Strategy-first synthesis planning for complex natural products#440399
- Agents All the Way Down; A Methodology for Building Custom AI Agents from Substrate to Production#271925
- Generating a Consistent Enterprise: Synthesis and Reference-Free Evaluation of Multi-System Business Data#1014825
Record · ID 954848
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Bring this data into your agent: Connect via MCP or API · 20 free credits to start · no card required
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive