Koc University Digital Collections
metadata only
Production control of a pull system with production and demand uncertainty
We consider a continuous material-flow manufacturing system with an unreliable production system and a variable demand source which switches randomly between zero and a maximum level. The failure and repair times of the production system and the switching times of the demand source are assumed to be
Conceptio Open Archive
Analyze & explore related research in Conceptio
Connect this record directly into your research workflow or AI agent. Explore citations across open repositories, query full text, and export structured proof bundles.
This document is indexed with metadata only: full text is not available in the archive for this record. Open the official source ↗
Related documents
- Replication data for the paper titled "Layout Optimization of Subsea Production Control System Considering Construction Cost and the Risk of Failure"#20846
- Near-optimal scheduling and decision-making models for reactive and proactive fault tolerance mechanisms#957920
- From Shewhart’s Control Charts to AI-Enhanced Statistical Process Control in Manufacturing#1148622
- Optimal Inflow Control for Transport Equations with Uncertain Velocities and Demand#821243
- On Asymptotic Stability of Hybrid Systems with Frequent Updates and Sampled-Data Observers#424866
Record · ID 954862
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Retrieved via Conceptio: every document is proof-bundled with source, license, and retrieval metadata.
Bring this data into your agent: Connect via MCP or API · 20 free credits to start · no card required
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive
Read the Docs → · View CLI source on GitHub · Conceptio Open Knowledge Archive