Conceptio › Archive › arXiv (All)
arXiv (All)open access

The U.S. Interconnection Queue System: Cascading Vulnerability Analysis and a Resilience Engineering Framework

Heidari, Zahra
arXiv (All) · Papers · License: Open Access
Open Source ↗Direct PDF ↓
systems-and-control
systems and control
This document is indexed with metadata only — full text is not available in the archive for this record. Open the official source ↗
Record · ID 997336
Retrieved via Conceptio — every document is proof-bundled with source, license, and retrieval metadata.