16 https://www.operaen.no ORG-0001 Den Norske Opera & Ballett Kirsten Flagstads Plass 1 oslo 0150 NO081 NOR 920201598 Nicoleta Toma +47 21422121 [email protected] https://www.domstol.no/no/domstoler/tingrett/oslo-tingrett/ ORG-0002 Oslo tingrett Postboks 2106 Vika Oslo 0125 NO081 NOR 926725939 +47 22035200 [email protected] https://artifik.no ORG-0003 Artifik AS Stortingsgata 12 Oslo 0161 NO081 NOR 925364967 [email protected] 00593607-2026 166/2026 2026-08-28+02:00 2.3 eforms-sdk-1.13 51c9086e-5b8e-48c2-babe-e79f5a3a04db 73148e09-96ee-4c27-bdfa-5f9249e7d467 2026-08-27Z 08:31:17.761Z 01 32014L0024 cn-standard ENG https://www.operaen.no body-pl rcr ORG-0001 serv-prov ORG-0003 exg-sitn-other Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract. exg-sitn-bankr Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract. exg-crim-corrpt Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, by enforceable judgement been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, involving European Communities or European Union member states (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier. exg-sitn-cred-arran Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract. exg-crim-part Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted verdict of participation in a criminal organisation by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Participation in a criminal organisation as defined in Article 2 of the Council ́s framework decision 2008/841/RIA of 24 October 2008 on control of organised crime (EUT L 300 of 11.11.2008, p. 42). exg-mis-distortion Has the tenderer entered into agreement(s) with other tenderers with the intention of turning the competition? exg-mis-bre-env-law Is the tenderer aware of breaches of environmental provisions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU. exg-crim-laund Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of money laundering or financing terrorism by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Money laundering or financing terrorism As defined in Article 1 of the European Parliament and Council Directive 2005/60/EF of 26 October 2005 on preventive measures against the use of the financial system for money laundering and financing terrorism (EUT L 309 of 25.11.2005, p. 15). exg-crim-fraud Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted of fraud has been convicted of fraud by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Fraud included in Article 1 of the Convention on protection of the Financial Interests of the European Communities (EFT C 316 of 27.11.1995, p. 48). exg-crim-traffick Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of child labour and other forms of human trafficking by a verdict handed down no more than five years ago, or a rejection period determined directly in the judgement that still applies? Child labour and other forms of human trafficking as defined in Article 2 of the European Parliament and council directive 2011/36/EU of 5. 1 April 2011 on the prevention and control of human trafficking and the protection of its victims and for compensation of the Council ́s framework decision 2002/629/RIA (EUT L 101 of 15.4.2011, p. 1). exg-sitn-insolvency Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract. exg-mis-bre-lab-law Is the tenderer aware of breaches of provisions on working conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU. exg-sitn-liq-admin Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract. exg-mis-misrepresent Has the tenderer: a) given grossly incorrect information with the notification of the information required to verify that there is no basis for rejection, or of the qualification requirements being fulfilled, b) failed to provide such information, c) made reservations immediately to present the supporting documents requested by the contracting authority, or d) improperly affected the contracting authority ́s decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award? exg-mis-partic-confl Is the tenderer aware of a conflict of interest as stated in national law, the relevant notice or procurement documents? exg-mis-prep-confl Has the tenderer or an entity associated with the supplier advised the contracting authority or in another way been involved in the planning of the competition? exg-mis-misconduct Has the tenderer committed serious errors in professional practice? If relevant, see the definitions in national law, the relevant notice or procurement documents. exg-mis-sanction Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions? exg-mis-bre-soc-law Is the tenderer aware of breaches of provisions on social conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU. exg-pmt-bre-ssc Have tenderers failed to fulfil all their social security obligations in the country where they are established and in their member state, if this is a different country than what he is established in? exg-sitn-as-susp Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers in such a situation is obligatory in accordance with the current national law with no exceptions, when the tenderer is still able to carry out the contract. exg-pmt-bre-tax Has the tenderer not fulfilled all of his tax and duty obligations in both the country where he is established and in the contracting authority's member state, if this is a different country than what he is established in? exg-crim-terror Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision. exg-mis-off-cond Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies, have been legally convicted of offences regarding professional behaviour in defence procurements? exg-mis-unrel-sec Is the tenderer assessed to lack the reliability necessary to exclude the risk of national security? exg-natl-bre-nat-law The contracting authority shall state that in Norway there are national rejection reasons. These shall be described in the procurement documents. Tenderers must respond to whether they are in one or more of the situations described in the national rejection reasons. epo-notice open false 7833 26023 - Procurement of freight and forwarding services. The Norwegian National Opera & Ballet (DNO&B) needs to enter into a framework agreement with one tenderer for the delivery of freight and forwarding services. The objective of the procurement is to ensure efficient, flexible and reliable transport systems for DNO&B ́s activities. The assignments will mainly include both international and national dispatches.
The dispatches will vary in scope and complexity, from smaller express packages to transporting complete productions. The latter can include dispatches equivalent to 1-10 units in the form of 20-45 foot containers and/or semi-trailers. Major transports can, as a main rule, be planned beforehand, but there will also be a need for ad hoc deliveries with a short response time. services 6000000 5000000 60000000 NO081 NOR 2026-10-21Z 2030-10-21Z LOT-0001 no-eu-funds false 7833 restricted-document https://app.artifik.no/procurements/7833 N/A none false epo-procurement-document no required not-allowed performance N/A per-exa 30 price Price per-exa 70 quality Quality per-exa 0 quality The contracting authority has assessed that climate and environmental considerations in this procurement are best safeguarded through requirements in the requirement specification, rather than as the award criteria with weighting. There are concrete and binding requirements for the delivery, including, among other things, requirements for the use of low or zero emission vehicles. These requirements mean that all tenderers must fulfil a defined minimum level for environmental performance. ORG-0001 https://app.artifik.no/procurements/7833 ORG-0003 3 ORG-0001 ORG-0002 NOR true true e-Tendering required true 2026-10-02Z 10:00:00.000Z false 1 fa-wo-rc none 10321 26023 - Procurement of freight and forwarding services. The Norwegian National Opera & Ballet (DNO&B) needs to enter into a framework agreement with one tenderer for the delivery of freight and forwarding services. The objective of the procurement is to ensure efficient, flexible and reliable transport systems for DNO&B ́s activities. The assignments will mainly include both international and national dispatches.
The dispatches will vary in scope and complexity, from smaller express packages to transporting complete productions. The latter can include dispatches equivalent to 1-10 units in the form of 20-45 foot containers and/or semi-trailers. Major transports can, as a main rule, be planned beforehand, but there will also be a need for ad hoc deliveries with a short response time. services env-imp Reduction of environmental impact 60000000 NO081 NOR 2026-10-21Z 2030-10-21Z