ConceptioArchiveEU TED (Tenders Electronic Daily)
EU TED (Tenders Electronic Daily)open access

Germany – Laboratory, optical and precision equipments (excl. glasses) – Flip Chip Die Bonder — FAIR - Facility for Antiproton and Ion Research in Europe GmbH (DEU)

FAIR - Facility for Antiproton and Ion Research in Europe GmbH · EU Tenders Electronic Daily (TED)
EU TED (Tenders Electronic Daily) · Contracts · License: Open Access
Open Source ↗
deufair
european union, public procurement, eu tender, ted, tenders electronic daily, 582477-2026, FAIR - Facility for Antiproton and Ion Research in Europe GmbH, DEU, supplies, cn-standard, 38000000, DEU

16 http://www.fair-center.de ORG-0001 FAIR - Facility for Antiproton and Ion Research in Europe GmbH Planckstr. 1 Darmstadt 64291 DE711 DEU DE 275 595 927 +49 6159711987 [email protected] https://www.bundeskartellamt.de ORG-0002 Vergabekammer des Bundes Villemomblerstr. 76 Bonn 53123 DEA22 DEU 022894990 Vergabekammer des Bundes +49 22894990 [email protected] ORG-0003 Datenservice Öffentlicher Einkauf (in Verantwortung des Beschaffungsamts des BMI) Bonn 53119 DEA22 DEU 0204:994-DOEVD-83 +49228996100 [email protected] 00582477-2026 162/2026 2026-08-24+02:00 2.3 eforms-sdk-1.13 eforms-sdk-1.13 b7eb8c1b-a838-4a88-a40b-60856b84d9c3 729d2423-22eb-4079-84c6-70478cfbd2f8 2026-08-21+02:00 11:00:41+02:00 01 2026-08-21+02:00 32014L0024 cn-standard ENG pub-undert-cga education ORG-0001 ted-esen ORG-0003 false false no-eu-funds true If advance payments are required within the framework of a contract to be concluded (down payments), these will only be paid upon presentation of an unlimited, directly enforceable bank guarantee.

FAIR GmbH only accepts guarantees that comply with the following minimum conditions: - directly enforceable guarantees waiving the defense of §§ 770, 771 BGB - exclusively guarantees in accordance with German law - irrevocable guarantees - free of charge for FAIR GmbH - issued by a reputable international, preferably European bank - usually for an indefinite period or a period linked to the date of transfer of ownership vgv ENG SomeTenderDocID1 non-restricted-document exg-natl-bre-nat-law Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-crim-part Please see FAIR form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-crim-terror Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-crim-laund Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-crim-fraud Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-crim-corrpt Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-crim-traffick Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-pmt-bre-tax Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-pmt-bre-ssc Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-mis-bre-env-law Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-mis-bre-soc-law Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-mis-bre-lab-law Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-sitn-insolvency Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-sitn-liq-admin Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-sitn-as-susp Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-sitn-other Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-mis-misconduct Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-mis-distortion Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-mis-partic-confl Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-mis-prep-confl Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-mis-sanction Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! exg-mis-misrepresent Please see FAIR Form Suitability: self-declaration of suitability in accordance with Sections 123, 124 GWB as part of the suitability documents submitted by the company! epo-notice ORG-0001 The competent investigating authority is as follows

Vergabekammer des Bundes Villemombler Str. 76 D-53123 Bonn, Germany Tel.: 0228 9499-0 Fax: 0228 9499-163 Email: [email protected] Web: http://www.bundeskartellamt.de/SharedDocs/Kontaktdaten/DE/Vergabekammern.html

The applicant is requested to clearly identify those parts of the request to participate (and any subsequent bid) containing company/business secrets. If this does not happen, the public procurement tribunal will assume consent to inspect the documents as required in the case of carrying out a review procedure (Section 165 (3) Act against Restraints of Competition (Competition Act - GWB)). As the awarding authority, FAIR is required to provide the public procurement tribunal with immediate access to the files when a review procedure is initiated (Section 163 (2) sentence 3 GWB).

Applicants/bidders have the right to demand that the Contracting authority comply with the provisions on the award procedure protecting bidders (Section 97 (6) GWB). Applicants/bidders with an interest in the public contract who believe their rights have been violated by non-compliance with the provisions governing the awarding of public contracts, must raise an objection about the violation to FAIR within ten calendar days (Section 160 (3) sentence 1 no. 1 GWB).

Violations known from the tender notice or tender documents must be claimed vis-a-vis FAIR before the time limit given for submission of applications (offers) (Section 160 (3) 1 No. 2 - 3 GWB).

If FAIR informs the applicant/bidder that it is unwilling to redress the objection, an application for review may then be filed with the public procurement tribunal above within 15 days of receipt of the notification (Section 160 (3) sentence 1 no. 4 GWB).

Bidders whose bids are not to be considered for the award of the contract will be notified before the awarding of the contract pursuant to Section 134 GWB. A contract may only be concluded 15 calendar days after FAIR has sent out this information. This period is ten calendar days when transmission is by fax or email. The period commences on the day following the dispatch of the information by FAIR. After this time period has expired, an award is possible even if a time limit pursuant to Section 160 (3) GWB has yet to expire. Therefore, in order to prevent an award, a request for review needs to have been served upon FAIR by the public procurement tribunal before the expiry of the time limit under Section 134 GWB.

Pursuant to Section 135 (1) and (2) GWB, the invalidity of an award can only be established if it has been asserted in the review procedure within 30 calendar days from the date on which there was notification on the conclusion of the agreement, though no later than six months after the agreement was concluded. If the Contracting authority published the tender notice in the Official Journal of the European Union, the time limit for claiming ineffectiveness shall expire 30 calendar days after the publication of the tender notice in the Official Journal of the European Union.

Information pursuant to Art. 13 GDPR on the processing of your personal data within the scope of our business relationship is available at: www.gsi.de/data-protection

FAIR Facility for Antiproton and Ion Research in Europe GmbH ORG-0002 ORG-0002 DEU ENG open https://www.dtvp.de/Satellite/notice/CXS0YYEDYY9CE3AR false false 33/2600038815FAIR Flip Chip Die Bonder In flip-chip assembly, a semiconductor chip is electrically connected directly underside to a sensor via contact bumps. This requires a flip-chip die bonder, which places the chips flipped on the sensors with micrometer precision and enables various bonding technologies such as soldering, thermal bonding, and conductive adhesive bonding. supplies #Bekanntmachungs-ID: CXS0YYEDYY9CE3AR#

Tender shall be submitted electronically within the deadline via the German awarding platform DTVP. URL: http://www.dtvp.de/Center/ The forms and other documents to be completed, provided by FAIR, may be - either completed on the online tendering tool under the section "Documents to Be Completed" or - created and compiled separately by Candidate together with the other components of the tender (concepts or explanations etc.), then uploaded under the heading "Own Documents". However, Candidates should not fill in the forms online and upload them again separately, as this can result in transmission errors and increases the workload on both sides. In order to comply with the text form (in writing) according to § 126b BGB [transl.: German Civil Code] when submitting tender, Candidates must provide the following information: - In the case of natural persons, the full name (first name and surname) must be given (name of the declaring person in the tender form).

In the case of legal entities and commercial companies and corporations, the name of the company and its legal form must be stated. In addition, the full name of the employee who is submitting the participation application on behalf of the company (name of the declaring person in the participation application form) must be stated. The insertion of a company logo is not sufficient. - In the case of Bidding Consortia, the declaring person according to § 126b BGB shall be the employee of the leading member who submits the participation application on behalf of the Bidding Consortium; besides, the form "Bidding Consortium Declaration" must be submitted. It should be noted that in the case of electronic submission, the text form according to § 126b BGB is only observed if the tender are transmitted in encrypted form via the awarding platform (cf. information on eVergabe). Submitting the participation application via email is not sufficient. In the case of incorrect/ incomplete information that violates the aforementioned formal requirements, tender will be excluded unless Candidate cannot be held responsible (§ 57 para. 1 nr. 1, para. 3 VgV). ******************************* Note: Weighting Weighting (Best possible rating is 10 and worst possible rating is 0) Price = 40 % Performance criteria = 60 % 1. Completeness and Quality of the Bid Documents = 20 % 2. Quality Assurance, Acceptance Testing and Documentation = 25 % 3. Delivery time, installation and training = 30 % 4. Repair Services and Sustainability = 25 % ________ Communication with Candidates takes place via the DTVP's tender platform. Questions must be sent to FAIR via DTVP and will are answered via DTVP. Questions posed orally or by telephone regarding the documents or the contractual object will not be answered; answers given orally or by telephone are not binding. -------------- Note: Electronic Invoicing "The XInvoicing format is accepted with additional transmission of the invoice as a -pdf-." 38000000 FAIR - Facility for Antiproton and Ion Research in Europe GmbH Planckstrasse 1 64291 Darmstadt Planckstr. 1 Darmstadt 64291 DE711 DEU LOT-0001 slc-stand-ins Business and Professional Liability Declaration (Mit dem Angebot; Mittels Eigenerklärung): The sum insured must cover at least three the order value. slc-stand-other Company Profile (Mit dem Angebot; Mittels Eigenerklärung): a) General company data b) Total number of employees and breakdown of the number of employees for the last 3 fiscal years: - Administration - Development/design - Production slc-stand-ratio Company Profile - information on total turnover and performance-related turnover (Mit dem Angebot; Mittels Eigenerklärung): Statement of the company's total turnover and turnover relating to the specific type of service that is the subject of the contract, in each case for the last three financial years. slc-stand-ratio Creditworthiness check (Auf Anforderung der Vergabestelle; Mittels Dritterklärung): Carried out by FAIR GmbH as part of the suitability check. slc-abil-subc Declaration of Availability (Mit dem Angebot; Mittels Eigenerklärung): Only to be completed in parallel with the "Sub-contractor Declaration" and signed by the sub-contractor if partial services are to be passed on to sub-contractors (performance by sub-contractor) or if the applicant/bidder is using a sub-contractor to demonstrate suitability (hired competence - see Sub-contractor form). In the event that more than one sub-contractor is being used, several copies of this form should be filled out. One declaration of commitment should be submitted per sub-contractor. slc-stand-other Further bidder information (Mit dem Angebot; Mittels Eigenerklärung): In the context of the introduction of new stipulations for EU-wide tendering procedures (so-called eForms), public clients have been required since 25 October 2023 to publish the contractor information listed in any contract notices (previously contract award notices). Against this backdrop, must be provided for each bidder and each member of a bidding consortium the information listed on the relevant form with the proposal or the participation application in the case of a preliminary participation contest. slc-abil-ref-supply References (Mit dem Angebot; Mittels Eigenerklärung): The reference project must not be more than three years old! The system being offered must already be in successful use at other research institues or universities! Proof of references! If this proof is not provided, the applicant will be excluded from the process. slc-sche-qu-cert-indep Self-Declaration ISO 9001 (Mit dem Angebot; Mittels Eigenerklärung): Self-Declaration of Compliance with standards within the meaning of ISO 9001 (or an equivalent standard) slc-stand-other Self-Declaration on Regulation (EU) 833/2014 (Mit dem Angebot; Mittels Eigenerklärung): On 08.04.2022, the Council of the European Union adopted Regulation (EU) 2022/576 amending Regulation (EU) No 833/2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine. This entered into force on 09.04.2022. As a regulation, it has direct legal effect in the member states and has a direct impact on the award of public contracts and concessions. slc-abil-subc Sub-contractor Declaration (Mit dem Angebot; Mittels Eigenerklärung): Only to be completed if partial services are to be passed on to sub-contractors or if the applicant/bidder is using a sub-contractor to demonstrate suitability. In this case, this must be submitted with the request to participate/the offer. A declaration of availability (see Declaration of Availability form) from the sub-contractor must also be submitted with the request to participate/the offer in case of hired competence. In case of partial performance by the sub-contractor, the declaration will be requested before the award of the contract. false false not-allowed no-eu-funds not-requ not-allowed true If advance payments are required within the framework of a contract to be concluded (down payments), these will only be paid upon presentation of an unlimited, directly enforceable bank guarantee.

FAIR GmbH only accepts guarantees that comply with the following minimum conditions: - directly enforceable guarantees waiving the defense of §§ 770, 771 BGB - exclusively guarantees in accordance with German law - irrevocable guarantees - free of charge for FAIR GmbH - issued by a reputable international, preferably European bank - usually for an indefinite period or a period linked to the date of transfer of ownership ENG SomeTenderDocID1 non-restricted-document https://www.dtvp.de/Satellite/notice/CXS0YYEDYY9CE3AR/documents true BGB company with joint and several liability with listing of all members and their authorised representatives incl. naming of an authorised representative who shall represent the consortium in a legally binding manner vis-à-vis the Contracting authority. The tender must be accompanied by a legally binding declaration signed by all joint members that the lead firm, as authorised representative, represents the joint members listed before the Contracting authority and is jointly and severally liable, having an effect on each member, for performing the service in accordance with the contract. late-all FAIR reserves the right to make a one-off additional request for documents within a period to be specified in the additional request letter in accordance with § 56 VgV. However, applicants cannot rely on a subsequent request. Ultimately incomplete requests to participate will be excluded (§ 57 Para. 1 No. 2, Para. 3 VgV). none epo-notice no not-allowed required performance The reference project must not be more than three years old! The system being offered must already be in successful use at other research institues or universities! Proof of references! If this proof is not provided, the applicant will be excluded from the process. false poi-exa 40.00 price Price Price criteria for "Preis-Quotient-Methode" poi-exa 12.0000 quality Completeness and Quality of the Bid Documents "Under this award criterion, an assessment is made of the extent to which the bid documents demonstrate that the proposed system fully meets the technical, qualitative, and functional requirements specified in the procurement documents. In particular, it is important to the contracting authority that the bid clearly shows how the proposed solution fully complies with the order specification. A positive evaluation is given, in particular, for a clearly structured, technically precise, and consistent description of the system configuration and quality assurance. Low scores will be awarded to bids whose documentation is incomplete, contains only general or unreliable statements, or fails to describe the technical implementation and acceptance testing in sufficient detail." poi-exa 15.0000 quality Quality Assurance, Acceptance Testing, and Documentation "The evaluation focuses on the completeness, traceability, and technical quality of the quality assurance description as well as the technical documentation. The decisive factor is the extent to which the bidder demonstrates that the required quality is ensured, that compliance with the technical requirements is verified through appropriate testing and acceptance procedures, and that the results are documented in a traceable manner. A positive evaluation is given in particular for a clear, complete, and consistent description of the quality assurance measures, the testing and acceptance procedures, and the intended documentation. Bids will receive a lower score if their explanations remain too general, fail to describe essential elements of the testing and documentation concept in sufficient detail, or leave doubts regarding the reliability of the quality assurance and verification process. Evidence of examples of acceptance tests and documentation." poi-exa 18.0000 quality Delivery time, installation and training "The assessment focuses on the transparency and plausibility of the quoted delivery time, installation, and training. It is particularly important to the client that the delivery time, installation period, and training period specified by the client be confirmed. Shorter, plausibly presented timeframes (delivery time, installation period, and training period) will be evaluated positively. Longer timeframes (delivery time, installation period, and training period) will receive a correspondingly lower score, down to 0 points. Furthermore, the bidder"s description of the measures to be taken in the event of impending delivery delays will be evaluated." poi-exa 15.0000 quality Repair Services and Sustainability The evaluation focuses on the availability of spare parts and on site services, preferably for ten years, service response within 48 h. Availability of spare parts longer than 10 years and service response shorter than 48 h will be evaluated positively. Shorter Availability and longer response time will receive a lower score. ORG-0001 https://satellite.dtvp.de/Satellite/notice/CXS0YYEDYY9CE3AR ORG-0001 38 The competent investigating authority is as follows

Vergabekammer des Bundes Villemombler Str. 76 D-53123 Bonn, Germany Tel.: 0228 9499-0 Fax: 0228 9499-163 Email: [email protected] Web: http://www.bundeskartellamt.de/SharedDocs/Kontaktdaten/DE/Vergabekammern.html

The applicant is requested to clearly identify those parts of the request to participate (and any subsequent bid) containing company/business secrets. If this does not happen, the public procurement tribunal will assume consent to inspect the documents as required in the case of carrying out a review procedure (Section 165 (3) Act against Restraints of Competition (Competition Act - GWB)). As the awarding authority, FAIR is required to provide the public procurement tribunal with immediate access to the files when a review procedure is initiated (Section 163 (2) sentence 3 GWB).

Applicants/bidders have the right to demand that the Contracting authority comply with the provisions on the award procedure protecting bidders (Section 97 (6) GWB). Applicants/bidders with an interest in the public contract who believe their rights have been violated by non-compliance with the provisions governing the awarding of public contracts, must raise an objection about the violation to FAIR within ten calendar days (Section 160 (3) sentence 1 no. 1 GWB).

Violations known from the tender notice or tender documents must be claimed vis-a-vis FAIR before the time limit given for submission of applications (offers) (Section 160 (3) 1 No. 2 - 3 GWB).

If FAIR informs the applicant/bidder that it is unwilling to redress the objection, an application for review may then be filed with the public procurement tribunal above within 15 days of receipt of the notification (Section 160 (3) sentence 1 no. 4 GWB).

Bidders whose bids are not to be considered for the award of the contract will be notified before the awarding of the contract pursuant to Section 134 GWB. A contract may only be concluded 15 calendar days after FAIR has sent out this information. This period is ten calendar days when transmission is by fax or email. The period commences on the day following the dispatch of the information by FAIR. After this time period has expired, an award is possible even if a time limit pursuant to Section 160 (3) GWB has yet to expire. Therefore, in order to prevent an award, a request for review needs to have been served upon FAIR by the public procurement tribunal before the expiry of the time limit under Section 134 GWB.

Pursuant to Section 135 (1) and (2) GWB, the invalidity of an award can only be established if it has been asserted in the review procedure within 30 calendar days from the date on which there was notification on the conclusion of the agreement, though no later than six months after the agreement was concluded. If the Contracting authority published the tender notice in the Official Journal of the European Union, the time limit for claiming ineffectiveness shall expire 30 calendar days after the publication of the tender notice in the Official Journal of the European Union.

Information pursuant to Art. 13 GDPR on the processing of your personal data within the scope of our business relationship is available at: www.gsi.de/data-protection

FAIR Facility for Antiproton and Ion Research in Europe GmbH ORG-0002 ORG-0002 DEU ENG true true false required true https://www.dtvp.de/Satellite/notice/CXS0YYEDYY9CE3AR 2026-09-22+02:00 12:00:00+02:00 2026-09-14+02:00 23:59:59+02:00 false none none 33/2600038815FAIR Flip Chip Die Bonder The Flip-chip Die bonder should include the following process modules: - Precision die bonding (face up) - Flip chip bonding (face down) - adapted system work table - chip and substrate heating with process gas enclosure - software-controlled bonding force module - ultrasonic bonding module - in-situ-monitoring with video camera - form generator for creating reference elements for face up alignment - tool tip changing module - three different tool tips - tool tip support including heater - dispenser module for paste and liquids - UV-curing module - die-eject module supplies #Besonders auch geeignet für:other-sme# true env-imp The devices can be repaired or have modules replaced, and they feature an energy-saving mode. other 38000000 FAIR - Facility for Antiproton and Ion Research in Europe GmbH Planckstrasse 1 64291 Darmstadt Planckstr. 1 Darmstadt 64291 DE711 DEU 2 Maintenance

Related documents

Record · ID 606118 · SHA-256 40c2ee4ed2a89f2d
Retrieved via Conceptio — every document is proof-bundled with source, license, and retrieval metadata.